• Title/Summary/Keyword: 프로젝트 정보관리 시스템

Search Result 563, Processing Time 0.031 seconds

Suggestion of Project Information Management System for Small & Medium Sized Construction Companies through Analysis of Information Management Structure (프로젝트 정보관리체계 분석을 통한 중소건설업체 프로젝트 정보관리시스템 모델 제안)

  • Lee Tai-Sik;Koo Ja-Kyung;Lee Sang-Yub;Kim Young-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.549-552
    • /
    • 2003
  • Small & medium-sized construction companies(SMCC), they has lot's of problem like poor finance, a lack of specialists, and a shortage of professional skill. So the basic condition of SMCC is not good for small construction companies. In this situation, moreover SMCC has been influenced by big-sired construction companies(BCC) difficult after the crisis of economics of Korea, IMF. Therefore it is necessary that we strengthen competitive power of SMCC for survival. This research is about project management for SMCC. We analized information system which is developed from SI corporation and BCC. As this research, we want to build and organize project information management system for SMCC. This will make SMCC have more competitiveness and increase productivity efficiency, skill for information management of project given.

  • PDF

A Study on Quality Improvement Methods of Small Scale Projects with Audit Activity Analysis (감리 활동 분석을 통한 소규모 프로젝트의 품질 향상 방안 연구)

  • Hong, Sung-Ho;Kim, Neung-Hoe;In, Hoh Peter
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2016.04a
    • /
    • pp.512-513
    • /
    • 2016
  • 정보시스템은 기업에 반드시 필요하며 고품질의 정보시스템이 요구되고 있다. 하지만, 고품질의 정보시스템을 구축하는데 많은 어려움이 있다. 이에 따라 정부에서는 감리제도를 도입하여 고품질의 정보시스템 구축에 대한 문제를 해결하고자 노력하고 있지만 소규모 프로젝트의 경우에는 감리대상의 범위에 들어가지 않고 적은 비용으로 인해 프로젝트 품질 관리활동이 없이 품질 관리에 어려움을 겪고 있다. 본 연구에서는 요구분석 영역에서의 감리활동 사례를 분석하고 자주 발생하는 지적 사항을 토대로 이해당사자들이 프로젝트의 특성에 맞게 점검항목을 만들어 AHP 분석을 통하여 중요도를 산정하고 추가적인 점검사항을 더해 품질 향상을 위해 소규모 프로젝트에 적용 가능한 품질 관리 프로세스를 제안한다.

An Implementation of Automation Version Management System Using Web Services (웹 서비스를 이용한 자동화된 버전관리 시스템 구현)

  • Kim, Nam-Ho;Park, Young-B.
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2007.10b
    • /
    • pp.55-60
    • /
    • 2007
  • 소프트웨어가 전함에 따라 프로젝트의 규모가 커지게 되고, 참여 인원이 늘어나게 된다. 대규모의 프로젝트를 관리하는 것은 매우 복잡하고 어려운 작업이다. 버전관리 시스템은 이러한 대규모의 프로젝트를 관리하는데 있어 매우 유용한 도구로써 사용되고 있다. RSC, SCCS, 클리어케이스, CVS등 많은 버전관리 시스템이 있지만, 그 중 CVS는 대표적인 버전관리 시스템으로써 대부분의 오픈 소스 프로젝트에서 사용되고 있을 정도로 그 성능을 인정받고 있다. 본 연구에서는 버전관리 시스템의 가장 완성적인 형태라고도 불리는 CVS에 대한 특징을 연구하고 CVS가 가지는 장 단점을 살펴보고 CVS의 성능을 개선시킬 수 있는 자동화된 버전관리 시스템을 제안한다.

  • PDF

The Study on Project Management Methodology for Productivity Improvement of SI project - focus on CMMi and PMBOK - (SI 개발 프로젝트 생산성 향상을 위한 프로젝트 관리 방법론 구축에 관한 연구)

  • Lee, Don-Hee;Kim, Jong-Eun
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.453-458
    • /
    • 2009
  • 정보화가 기업 경쟁력의 핵심 요소로 부각되고 있으며 기업 및 정부기관은 앞 다투어 정보화에 투자하고 있는 상황이다. 정보시스템 개발 프로젝트도 이제는 대형 프로젝트 수가 급증하고 있다. 최근 소프트웨어 CMMi 수준에 관한 인증 여부는 기업 경쟁력의 핵심적인 요인으로 그 중요성이 날로 강조되고 있다. 또한 PMI의 PMBOK는 프로젝트 관리의 바이블 격으로 업종 업태를 불문하고 광범위하게 적용되고 있는 상황이다. 프로젝트 관리자의 관점에서 볼 경우 CMMi 모델과 PMBOK 모델간의 중첩되는 부분, CMMi 프로세스를 실적용 시 관리영역에 대한 혼선 부분, 또한 PMBOK 상위지침의 구체성 미흡 부분에 대한 통합 및 조정이 필요하게 되었다. 현재 상용되는 개발방법론에는 관리적인 요소가 매우 미약하고, 국내에 아직까지 체계적으로 정립된 관리방법론이 없는 상황이다. 따라서, 본 논문에서는 프로젝트 관리자가 숙지해야 하는 프로젝트 관리영역, 프로젝트 관리단계, 제반 절차, 유관 정보시스템과의 연동(Interface) 등을 정보화 개발 프로젝트 생명주기(Life Cycle)에 맞춰 재구성 및 통합하여 프로젝트 관리자(Project Manager)에게 일관된 관점(Single Point of View)을 제시하여 프로젝트 생산성을 제고 하고자 한다.

  • PDF

A Study on Project Management and Collaboration in Ubiquitous Multi-Project Environment based on Agile Methodology (애자일 기반의 유비퀴터스 다중 프로젝트 관리 및 협업)

  • Lee, Jihyun;Hur, Sung Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2009.11a
    • /
    • pp.843-844
    • /
    • 2009
  • 유비퀴터스 멀티 프로젝트 환경에서 프로젝트 팀은 프로젝트 결과를 얻기 위해 필요한 업무를 도출하여 실행한다. 이를 위해 실질적인 팀 관리 및 요구 사항 정제가 이뤄져야 성공적인 제품 출시로 연결될 수 있다. 프로젝트 관리에서 중요한 부분은 프로젝트 진행 사항에 대한 가시적인 조회와 평가가 중요하다. 그러기 위해서는 협업과 공동 책임 업무에 대한 지원이 필요하다. 이 논문에서 애자일 개발 방법론에 기반한 프로젝트 관리 및 협업 지원 방법 및 시스템을 제안한다.

A Study on the Development of the Pilot Test Model to Examine the Applicability of the BIM Technology to PMIS (BIM 기술 기반 PMIS 개발에 관한 실험적 연구)

  • Choi, Jeong-Min;Ock, Jong-Ho;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.315-320
    • /
    • 2008
  • Construction industry have been occurred to the various demand of information. Also information quantity is increasing therefore, The role of information systems is important. Recently PMIS, an efficient decision-making support instrument of construction industry, is applied to various projects. However, its utility is still not enough. So this study suggests the concept model on the basis BIM to settle such a problem. Building the Pilot System was based on this study, and present the direction from Advanced PMIS.

  • PDF

Developing a Project Management Information System for Construction Claims (건설 클레임에 대비한 정보관리시스템 개발)

  • Wang, Hankyeom;Park, Junil;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.70-81
    • /
    • 2018
  • Claims in the construction industry can have a serious impact on the profitability of the project or can even result in project failure if it fails to take appropriate prevention. In order to properly prevent and respond to the potential claims and legal disputes throughout the project execution, it is necessary to continuously accumulate informations and clearly define the roles and responsibilities of the important activities systematically. Based on these needs, this study develops and verifies the project information management system(PMIS) that can prevent and respond possible claims for construction projects. Developed system includes such management modules as schedule, cost, PM/CM, design, collaboration, and claims. The system was validated by adopting it to the practical projects. The results showed that information systems tailored to the construction claim need to elevate users' familiarity to be more useful. Besides, the system can be more functional when used by both owners and contractors.

What Factors Make the Delay of the Information System Project Implementation? (무엇이 정보시스템 프로젝트 일정을 지연시키는가?)

  • Seoung, Byung Ook;Park, Sang Cheol;Koh, Joon
    • Knowledge Management Research
    • /
    • v.22 no.1
    • /
    • pp.1-19
    • /
    • 2021
  • Large-scaled hospital information system projects are often delayed than originally planned. Regarding project management, it is necessary to examine main factors triggering the schedule delay and to analyze the causality of such delay. This study tries to find the delay factors and causal relationship between them based on the case of the hospital information system development project by using the grounded theory method. It turned out that 'unrealistic scheduling' affects overall schedule delays like domino phenomenon, and 'poor analysis of existing systems' leads to poor quality of work analysis while 'poor subsystem integrated interface' triggers poor design quality. This study found out the factors affecting the delay of a project, analyzing cause-and-effect relationships between them in the academic side. From the practical view, it shows a solution to minimize delays in the project schedule for each of SI companies, hospitals and project managers.

정보시스템 프로젝트 관리

  • Jo, Min-Ho;Seol, Jeung-Ung
    • Digital Contents
    • /
    • no.8 s.75
    • /
    • pp.86-90
    • /
    • 1999
  • 지난 연재를 통하여 정보시스템 프로젝트의 성공적인 관리를 위한 성공요인과 실패요인, 그리고 관리요소와 프로젝트 관리 프로세스에 대해 살펴보았고, 이제 우리는 과거의 실사례를 되짚어 읽어 봄을 통해 반면교사(反面敎辭)하는 기회를 가져보고자 한다. 본 고에서 제시된 사례들은 저자들이 실제 가까이에서 경험한 것들도 있고 이미 널리 알려진 사례들도 있으나, 지금까지 제시한 성공 및 실패요인과 관리요소, 그리고 프로세스 관점에 따라 재해석해 보는 기회를 가져보는 것도 의미가 있다고 하겠다.

  • PDF

Project-Management Technics of System based on Web Service (웹 서비스 기반 시스템의 프로젝트 관리 기법)

  • Lee JongKook;Kim DongKu;Baek YonguKook;Baek JongHeon
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.11b
    • /
    • pp.295-297
    • /
    • 2005
  • 본 논문에서는 펩 서비스 기반 시스템에 대한 프로젝트 관리 기법을 소개한다. 먼저 웹 서비스 기반 시스템에서 발생할 수 있는 개발 복잡성이 무엇인지 설명한다. 발생 가능한 복잡성은 클라이언트와 서버 사이의 통신 프로토콜인 XML에서 발생한다. 또한 웹서비스의 갯수가 증가하면 WSDL의 관리도 중요해진다. 본 논문에서는 개발 복잡성을 줄이기 위한 웹 서비스 기반 시스템의 아키텍처는 무엇인지 소개한다. 또한 프로젝트 관리 도구를 사용하여 XML을 관리하는 방법을 소개한다. 마지막으로 이 관리 기법을 프로젝트에 도입하였을 때 어떤 생산성 증가 효과가 있었는지 소개한다.

  • PDF