• Title/Summary/Keyword: 프로젝트 정보관리 시스템

Search Result 564, Processing Time 0.041 seconds

A Study of Test Method and Implement Continuous Integration System using Open Source Tools (공개소프트웨어를 활용한 지속적인 통합 (CI)시스템 구축 및 테스트 방안)

  • Lee, Sang-Bok;Song, Gi-Pyeong;Shin, Seck-Kyoo
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2011.10a
    • /
    • pp.669-671
    • /
    • 2011
  • In this paper propose open source software the tools to build and continuous integration environment that can be used to improve software quality testing.

  • PDF

Blog-based Schedule Risk Management System (블로그 기반 공정리스크 관리시스템)

  • Jin, Soo-Myeong;Yoon, You-Sang;Jang, Myung-Hoon;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.47-56
    • /
    • 2009
  • As contemporary society becomes information-oriented, major construction companies have recently invested in information management, but small and medium ones have not. Though the small and medium companies recognize the information management is necessary and important, they don't have an ability to possess technical expertises. The purpose of this study is to develop a Schedule Risk Control System based on blogs using IT and web technologies for construction managers in small and medium construction companies. The system makes a chance to identify risk factors and prepare for responses to settle risks happened in preconstruction phases, and enables the managers and headquarters to predict and handle schedule risks by sharing information about risks on the blogs.

Implementing SPEM-based Methodology Support Tool, PRiME(Process innovation & Methodology Enhancement) (SPEM 기반 개발방법론 지원도구, PRiME)

  • Choi, Yoon-Jung;Ha, Su-Jung;Kim, Jin-Sam
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.05a
    • /
    • pp.285-288
    • /
    • 2005
  • 개발방법론 지원도구는 개발 프로세스 정의, 방법론 참조 등의 기본적인 기능을 지원해 주는 도구가 출시되어 있으나, 최신 기술을 바로 적용하거나 프로젝트의 수행 결과 획득된 지식을 전사적 차원에서 공유하거나 조직의 개발 프로세스 향상을 위한 정량적인 관리 활동을 지원하는 기능은 전반적으로 미흡한 형편이다. 이러한 사실에 근거하여 본 연구에서는 시스템 개발자 자신이 개발해야 하는 제품, 자신의 조직, 자신이 해결해야 하는 문제 등과 같은 상황적 요소에 기반하여 다양한 시스템 개발 체계를 쉽게 정의, 조정 및 적용할 수 있도록 지원하는 도구(PRiME)를 개발하고자 한다. 즉, 방법론 관리, 프로젝트 관리 및 자산 관리를 개발방법론 지원도구의 기본 기능으로 하며 이에 기반하여 시스템 개발 지식의 재사용을 위한 체계적인 지식관리 기능을 갖출 수 있도록 지원하고자 한다.

  • PDF

SI Project Success and Failure in Korea thru Standish CHAOS Report (Standish CHAOS Report로 본 한국 SI Project의 성공과 실패에 관한 분석 연구)

  • Yoon, Hyeong-Seok;Lee, Seouk-Joo;Lee, Dong-Hyun;Kim, Neung-Hoe;In, Hoh Peter
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2009.11a
    • /
    • pp.827-828
    • /
    • 2009
  • 매년 국내 많은 기업 및 공공기관에서 정보시스템 관련 프로젝트를 수행하고 그 결과는 성공이라고 발표되고 있으나, 2009년 Standish 보고서에서 성공 32%, 도전 44%, 실패 24%이라고 발표되었다.[1] 프로젝트를 수행하는 업체나 발주 업체는 그 성패에 따라서 기업의 운명이 달라진다. 본 연구에서는 실제 공급자(개발업체)가 수행한 프로젝트 사례(A사 282건)를 Standish CHAOS 보고서에 명시된 성패 기준으로 하여 조사 및 통계 분석한 결과는 Standish 보고서에 비교해서 실패 11%( A사 실패 35%) 높게 나왔다. 그 이유는 프로젝트에 대한 관리 프로세스 미정착되어 있으며, PM의 역량에 의해서 좌우 되어진다. 따라서 실패율을 낮추기 위한 지속적인 프로젝트 관리 프로세스가 필요하다. 본 연구의 목적은 국내 IT환경에 개발업체에서 수행한 프로젝트 성공과 실패에 관한 연구로서 (1)기존 문헌을 통하여 프로젝트의 성패에 대한 기준을 정립하고, (2)이를 Standish와 비교하고, (3) 프로젝트 계획 및 관리 프로세스의 중요성을 인식하여 성공을 높이는데 기여하고자 한다.

A Case Study of Requirements Management with MaRMI-III (마르미-III에서의 요구사항 관리 적용 사례)

  • Cho, Jin-Hee;Park, Kyung-Min;Lim, Choon-Bong;Kim, Jin-Sam
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2003.11c
    • /
    • pp.1661-1664
    • /
    • 2003
  • 본 논문에서는 마르미-III 개발방법론을 기반으로 하여 시스템 개발 프로젝트를 수행함에 있어, 프로젝트 초기 "요구획득(requirement)" 단계에 어떻게 하면 보다 효과적으로 고객의 요구사항을 관리하여 요구관리(requirements management) 목표를 달성하고, "아키텍처(architecture)" 단계의 원활한 진행을 보장할 수 있을지 그 적용 사례를 소개하고자 한다.

  • PDF

A Case Study on Information Strategy Plan of the Web Based on Project Management Information System for Construction Company (전사 웹기반 사업관리시스템 구축을 위한 정보화전략계획에 관한 사례연구)

  • Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.2D
    • /
    • pp.259-267
    • /
    • 2008
  • Nowadays PMIS (Project Management Information System) based on web is widely applied to communication, collaboration and community in construction jobsite for various organization such as subcontractors, general contractor, engineering company, supervisors and client. However, individual PMIS in jobsite is prone to be troublesome issue for integration and exchange of information regarding project management in corporate and may result in conflict of data application. The main reason should be lack of information strategy plan such as company master plan for information. This research shows a critical success factor that a big construction company of Korea establishes procedure and method for information strategy plan. In addition, It is to suggest how to be implemented PMIS architecture and execute business process innovation in corporate level. This research expects contribution that many construction companies reduce mistakes to be implemented management information system and to optimize system in corporate level.

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.

A Study of Development of Change Process for Configuration Management in Construction Project Management (건설사업관리에서 형상관리에 관한 변경 프로세스 개선에 관한 연구)

  • Ko, Ho-Un;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.81-89
    • /
    • 2009
  • CM(Configuration Management) is a field of management that focuses on establishing and maintaining consistency of a product's performance and its functional and physical attributes with its requirements, design, and operational information throughout its life. Recently upcoming concept of CM, regardless of various definitions, consists of the organization and the process for value creation through project change management, value preservation by Risk, Project Management implementation by Change management. The CM provide a basis for, and a record of, the project's performance in meeting the scope, time, cost. Overseas international companies have already adopted the CM system and enjoyed the benefits arising from such systems. And the CM provides perspectives and insights applicable to all types of projects. This study presents the review on the current systems now in use at jobsites and known to be efficient, and the introduction and application of configuration systems now at big issue. Hereby indicates the connective system consisted of work process, change control and knowledge referring to the methods and actual cases as an effective promotion of CM.

A Study on the Introduction and Application of the Standardized Management Software for Local Government (지방자치단체의 범용프로그램 도입 및 활용방안에 관한 연구)

  • Hong, Sang-Ki;Shin, Dong-Bin;Ahn, Jong-Wook
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.12 no.3 s.30
    • /
    • pp.3-12
    • /
    • 2004
  • Facilities Management(FM) System is widely spread GIS applications introduced in local governments. Over the last few years many local governments in Korea have developed facilities management systems, especially for underground facilities(drinking water and sewerage) and road management systems. The concept of Standardized Facilities Management Software(SFMS) was developed to minimize the duplication of efforts in local governments. Recently local governments try to change their direction to Urban Information Systems(UIS) which can comprehensively manage their information project carried out by each sector. Therefore this study suggests a method for introducing a Standardized Facilities Management Software to help constructing urban information system. This method is expected to prevent double investment, reduce project time, minimize the risk of project failure, and activate information projects.

  • PDF

A Study on the Improvement of Historical Data For Knowledge Management in Construction Project (지식관리(KM)를 위한 건설공사 실적자료관리 개선방안 연구)

  • Lee Tai Sik;Song Jae Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.468-471
    • /
    • 2001
  • The importance of early project planning is broadly recognized for construction projects. From the planning step, If extensive historical data related with the project is applied effectively, It can be major resource for estimating cost and project scope. However, The accumulation, analysis, and application of historical data is not sufficient in Korea. So useful information of construction project has disappeared. In order to solve the problems, Project Historical Data Management Systems is need to be developed. The purpose of this study is to analyze current problems and to find the method to utilize historical data in similar project.

  • PDF