Journal of the Korea Institute of Building Construction
/
v.21
no.2
/
pp.121-128
/
2021
Due to the increase of size and complexity of construction project, the frequency of serious accidents in construction industry has been increased. Especially, the proportion of accidents in formwork of building construction site is very high, and many previous studies have been conducted to preventing them in the viewpoint of the diverse approaches. However, their effectiveness on accidents prevention was poor, and as a result, it is limited to consider the potential risks because many workers and managers tend not to be concerned with unsafe factors in formwork. Therefore, in this study, a realistic and proactive way for analyzing these potential risks was proposed in the manner of quantitatively assessing the potentials resulted from the unsafe factors in formwork. To verify the applicability of the proposed methodology, group survey was carried out, and the results were compared with those of the traditional importance-performance analysis(hereafter IPA) technique. Through the use of the proposed methodology, unsafe factors that were not found in the IPA but have potential risk were identified. Eventually, this study is expected to contribute to the proactive prevention of construction serious disaster accidents in formwork by enabling a more efficient management.
Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
KIPS Transactions on Software and Data Engineering
/
v.12
no.11
/
pp.471-480
/
2023
The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.
With the increase in construction of long railway tunnel, social interest in the railway tunnel fire risk has also increased. However, quantitative fire risk research on this topic is still lacking, especially in terms of consideration of uncertainty of each variables used in risk analysis. Hence, in this study, to improve the overall performance of fire risk analysis technique for railway tunnel, Monte-Carlo simulation method is added to the traditional probabilistic risk analysis based on event tree approach and its validity is investigated by applying it to the real railway tunnel project.
Cloud Computing has drawn attention as one of 10 IT strategic technology trends and has various advantages such as cost reduction and enhancing business flexibility. However, corporations hesitate to adopt the service because of unexpected risks. Especially compared to large firm, medium and small ones use public cloud that security risk is high. Meanwhile, real option strategy has drawn attention as the method to hedge uncertainty in IT projects. Therefore, in this study causal relationships among technical, security, relational, and economic risks of cloud service will be investigated. Eventually, this study investigates how those risks influence the intention to choose the real option about the cloud service. For this study, five hypotheses is drawn, and a survey is conducted about the medium and small firms which are currently using cloud service to examine hypotheses. Since the study is at organizational level, 287 questionnaire replies are recalculated to 120 firms. For statistical analysis, Smart PLS and SPSS Statistics18 are used. As a result, technical risk of cloud service has significantly positive influence on security risk. Second, security risk and relational risk of cloud service has significantly positive influence on economic risk. Third, economic risk of cloud service has significantly positive influence on the intention to purchase the delay option or abandon option. Based on this result, this research discussed practical and academic implications and the limitations.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.05b
/
pp.199-202
/
2009
Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this research, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, CMr manages risks to control the procedure of project. So, potential risk factors can constitute the database, and that database can be matched to following activity. And construction manager can forecast measures of risk using the result of matching. This chain of activities increase efficiency in roles of CMr on CMR(CM at Risk). Furthermore this study will propose one of the solution of Construction Management Module.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2013.05a
/
pp.684-689
/
2013
The reality is that many security and administrative issues with the expansion of the IT assets in accordance with the abrupt change in the business environment, most companies today are struggling. Information within an organization is a party through external hackers and viruses that are increasingly intelligent risk, and the risk of internal data spills occur through an unauthorized party and internal information in accordance with the co-operation of the outsourcing company and the employee wants to see a sense of security and due to the frequent project asset outflows the risk is increasing gradually. In this paper, in preparation for such a growing security risk management and the increasing of problems, proposes the Total Management Model by using Microsoft's Directory Service & HR Solution that is an integrated management model that can take low-cost, high-efficiency.
Korean Journal of Construction Engineering and Management
/
v.19
no.5
/
pp.90-100
/
2018
Government needs a risk assessment method that is effective in preventing accidents as a part of the three principal projects of the government for protecting the people's lives for establishing preventative measures to prevent accidents in the construction sites, which accounted for more than half of all accidental mortality accidents, and promote the safety-oriented culture for making fundamental changes. Accidents at the medium and small sized construction sites accounted for 88.9% of the total construction accidents. The data indicates that improper management and lack of advanced safety measures due to the absence of a safety supervisor are the biggest problems. It is believed that active measures to evaluate and prevent risks at construction sites are necessary for preventing accidents in the medium and small sized construction sites. The objectives of this study is to identify the key risk items of common accident causes and propose a practical, preemptive, and improved risk assessment method by evaluating the problems in the safety management of construction sites for reducing the accident rate in the medium and small sized construction sites.
응급 의사소통 시스템(ECS)은 세심한 계획, 설계시공 및 사용이 요구된다. 음성으로 메시지를 전달하는 시스템은 수많은 사용자, 관계당국, 종사자 및 전문가와 관련된 수많은 도전에 직면해 있다. 관련 당사자와 전문가가 결정되고 응급 의사소통 시스템(ECS) 프로젝트의 초기 설계 단계부터 포함되도록 하는 것이 중요하다. 음성 전달 시스템은 통상적인 화재 경보 시스템과는 많이 다르기 때문에, 엔지니어는 새로운 기술을 적용하고 새로운 설계 기법 또는 경험이 있는 새로운 전문가를 찾아 협력해야 한다. 관계 당국과 건물주는 응급 의사소통 시스템(ECS)의 설계에 적극 참여해야 한다. 응급 의사소통 시스템(ECS)의 음성 메시지를 무시하거나 부분적으로만 전달하는 것은 응급 상황 시 음성을 이용한 의사소통의 효과와 품질을 위태롭게 하는 것이다.
Park, Su-Yong;Hwang, Man-Su;Park, Su-Jin;Seo, Seong-Suk;Na, Ho-Yeong
시스템엔지니어링워크숍
/
s.1
/
pp.1-8
/
2003
시스템 개발환경이 대형화, 복잡화됨에 따라 개발 생명주기의 각 단계에서 발생하는 요건은 기술적, 관리적 측면에서 많은 영향을 받게 되었다. 즉, 개발 생명주기의 초기단계에서 요건에 대한 잘못된 이해나 분석, 개발 영역에 대한 충분한 이해와 관리의 부재 및 계속적인 변경 요구는 부정확성하고 불완전한 요건을 발생시키고, 다른 요건과의 충돌 및 일관성 결여 등을 발생시킬 수 있다. 이러한 결과는 전체적인 시스템의 완전성과 성능 등에 커다란 영향을 주고 유지보수에 많은 비용과 노력을 요구한다. 본 연구에서는 이러한 문제점을 해결하기 위하여 실무 프로젝트 개발에 적용할 수 있도록 요건관리와 관련된 프로세스와 활동을 요구공학을 기반으로 완전성과 일치성을 가진 요구사항의 생성 및 관리 등을 포함하는 총체적인 활동과 원칙에 대한 공학적 접근을 제시하여 전체 소프트웨어 개발비용과 위험부담을 경감시키며 품질향상을 이룰 수 있도록 한다. 또한, 각 업무 도메인과 개발 환경에 따라 적절하게 적용할 수 있도록 프로세스와 활동을 커스터마이징 및 컴포넌트화하고 요구사항 관리 도구의 프로토타입을 제시한다.
Many companies have considered IT outsourcing as one of strategic alternatives in order to rapidly respond to changing business environment and strengthen their competitiveness. Despite its strategic role, however, IT outsourcing project has been plagued by a high failure rate and difficulty in realizing the promised project performance because of its inappropriate risk management. This study examines the effect of IT project management risk factors on project performance. We propose that project risk management factors(communication, technology sharing, and project control) influence project performance(process performance and product performance). Based on the empirical results, theoretical and practical implications of the study are discussed along with its limitations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.