• Title/Summary/Keyword: 프로젝트 위험관리

Search Result 191, Processing Time 0.028 seconds

A Study on the Potential Risk Analysis for the Safety Management in the Formwork (거푸집공사 안전관리를 위한 잠재적 위험 분석에 관한 연구)

  • Shin, Yoon-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.121-128
    • /
    • 2021
  • Due to the increase of size and complexity of construction project, the frequency of serious accidents in construction industry has been increased. Especially, the proportion of accidents in formwork of building construction site is very high, and many previous studies have been conducted to preventing them in the viewpoint of the diverse approaches. However, their effectiveness on accidents prevention was poor, and as a result, it is limited to consider the potential risks because many workers and managers tend not to be concerned with unsafe factors in formwork. Therefore, in this study, a realistic and proactive way for analyzing these potential risks was proposed in the manner of quantitatively assessing the potentials resulted from the unsafe factors in formwork. To verify the applicability of the proposed methodology, group survey was carried out, and the results were compared with those of the traditional importance-performance analysis(hereafter IPA) technique. Through the use of the proposed methodology, unsafe factors that were not found in the IPA but have potential risk were identified. Eventually, this study is expected to contribute to the proactive prevention of construction serious disaster accidents in formwork by enabling a more efficient management.

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

Development of Railway Tunnel Fire Risk Assessment Program and its Application (철도터널 화재 위험도 평가 프로그램의 개발 및 적용사례)

  • Yoon, Sungwook;Park, Jong-heoun
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.1
    • /
    • pp.57-64
    • /
    • 2009
  • With the increase in construction of long railway tunnel, social interest in the railway tunnel fire risk has also increased. However, quantitative fire risk research on this topic is still lacking, especially in terms of consideration of uncertainty of each variables used in risk analysis. Hence, in this study, to improve the overall performance of fire risk analysis technique for railway tunnel, Monte-Carlo simulation method is added to the traditional probabilistic risk analysis based on event tree approach and its validity is investigated by applying it to the real railway tunnel project.

  • PDF

The Effect of Cloud Service Risks on the Intention of Purchasing Real Options: Focusing on Public Cloud Service of Small and Medium-sized Enterprises (클라우드 서비스 위험이 실물옵션 채택의도에 미치는 영향: 중소기업의 퍼블릭 클라우드 서비스를 중심으로)

  • Kim, Jeong-eun;Yang, Hee-dong
    • Information Systems Review
    • /
    • v.17 no.1
    • /
    • pp.117-140
    • /
    • 2015
  • Cloud Computing has drawn attention as one of 10 IT strategic technology trends and has various advantages such as cost reduction and enhancing business flexibility. However, corporations hesitate to adopt the service because of unexpected risks. Especially compared to large firm, medium and small ones use public cloud that security risk is high. Meanwhile, real option strategy has drawn attention as the method to hedge uncertainty in IT projects. Therefore, in this study causal relationships among technical, security, relational, and economic risks of cloud service will be investigated. Eventually, this study investigates how those risks influence the intention to choose the real option about the cloud service. For this study, five hypotheses is drawn, and a survey is conducted about the medium and small firms which are currently using cloud service to examine hypotheses. Since the study is at organizational level, 287 questionnaire replies are recalculated to 120 firms. For statistical analysis, Smart PLS and SPSS Statistics18 are used. As a result, technical risk of cloud service has significantly positive influence on security risk. Second, security risk and relational risk of cloud service has significantly positive influence on economic risk. Third, economic risk of cloud service has significantly positive influence on the intention to purchase the delay option or abandon option. Based on this result, this research discussed practical and academic implications and the limitations.

Study on Development of Construction Management Module based on Risk factor classification system at Construction Phase (시공단계 위험요소 분류체계 구축을 통한 건설 프로젝트 관리모듈 개발에 관한 연구)

  • Lee, Joo-Sung;Moon, Sung-Kon;Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.199-202
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this research, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, CMr manages risks to control the procedure of project. So, potential risk factors can constitute the database, and that database can be matched to following activity. And construction manager can forecast measures of risk using the result of matching. This chain of activities increase efficiency in roles of CMr on CMR(CM at Risk). Furthermore this study will propose one of the solution of Construction Management Module.

  • PDF

Proposes the Total Management Model by using Directory Service and through the development HR Solution (Directory Service와 HR 솔루션 개발을 통한 IT 통합 관리 모델 제안)

  • Lee, Sung-jun;Kim, Min-Soo
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.05a
    • /
    • pp.684-689
    • /
    • 2013
  • The reality is that many security and administrative issues with the expansion of the IT assets in accordance with the abrupt change in the business environment, most companies today are struggling. Information within an organization is a party through external hackers and viruses that are increasingly intelligent risk, and the risk of internal data spills occur through an unauthorized party and internal information in accordance with the co-operation of the outsourcing company and the employee wants to see a sense of security and due to the frequent project asset outflows the risk is increasing gradually. In this paper, in preparation for such a growing security risk management and the increasing of problems, proposes the Total Management Model by using Microsoft's Directory Service & HR Solution that is an integrated management model that can take low-cost, high-efficiency.

  • PDF

A Risk Assessment Counterplan for Reducing the Accident Rates in Medium and Small sized Construction Sites (중·소규모 건설현장의 재해율 감소를 위한 위험성평가 방안)

  • Jang, Yun-Ra;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.90-100
    • /
    • 2018
  • Government needs a risk assessment method that is effective in preventing accidents as a part of the three principal projects of the government for protecting the people's lives for establishing preventative measures to prevent accidents in the construction sites, which accounted for more than half of all accidental mortality accidents, and promote the safety-oriented culture for making fundamental changes. Accidents at the medium and small sized construction sites accounted for 88.9% of the total construction accidents. The data indicates that improper management and lack of advanced safety measures due to the absence of a safety supervisor are the biggest problems. It is believed that active measures to evaluate and prevent risks at construction sites are necessary for preventing accidents in the medium and small sized construction sites. The objectives of this study is to identify the key risk items of common accident causes and propose a practical, preemptive, and improved risk assessment method by evaluating the problems in the safety management of construction sites for reducing the accident rate in the medium and small sized construction sites.

위험관리정보 2: 응급 의사소통 시스템(ECS)에서 명료한 음성 전달을 위한 10가지

  • Jeong, Jeong-Ho
    • 방재와보험
    • /
    • s.140
    • /
    • pp.30-37
    • /
    • 2011
  • 응급 의사소통 시스템(ECS)은 세심한 계획, 설계시공 및 사용이 요구된다. 음성으로 메시지를 전달하는 시스템은 수많은 사용자, 관계당국, 종사자 및 전문가와 관련된 수많은 도전에 직면해 있다. 관련 당사자와 전문가가 결정되고 응급 의사소통 시스템(ECS) 프로젝트의 초기 설계 단계부터 포함되도록 하는 것이 중요하다. 음성 전달 시스템은 통상적인 화재 경보 시스템과는 많이 다르기 때문에, 엔지니어는 새로운 기술을 적용하고 새로운 설계 기법 또는 경험이 있는 새로운 전문가를 찾아 협력해야 한다. 관계 당국과 건물주는 응급 의사소통 시스템(ECS)의 설계에 적극 참여해야 한다. 응급 의사소통 시스템(ECS)의 음성 메시지를 무시하거나 부분적으로만 전달하는 것은 응급 상황 시 음성을 이용한 의사소통의 효과와 품질을 위태롭게 하는 것이다.

  • PDF

Practical Approach to Requirements Engineering Process (실무적 요구공하가 공정)

  • Park, Su-Yong;Hwang, Man-Su;Park, Su-Jin;Seo, Seong-Suk;Na, Ho-Yeong
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.1-8
    • /
    • 2003
  • 시스템 개발환경이 대형화, 복잡화됨에 따라 개발 생명주기의 각 단계에서 발생하는 요건은 기술적, 관리적 측면에서 많은 영향을 받게 되었다. 즉, 개발 생명주기의 초기단계에서 요건에 대한 잘못된 이해나 분석, 개발 영역에 대한 충분한 이해와 관리의 부재 및 계속적인 변경 요구는 부정확성하고 불완전한 요건을 발생시키고, 다른 요건과의 충돌 및 일관성 결여 등을 발생시킬 수 있다. 이러한 결과는 전체적인 시스템의 완전성과 성능 등에 커다란 영향을 주고 유지보수에 많은 비용과 노력을 요구한다. 본 연구에서는 이러한 문제점을 해결하기 위하여 실무 프로젝트 개발에 적용할 수 있도록 요건관리와 관련된 프로세스와 활동을 요구공학을 기반으로 완전성과 일치성을 가진 요구사항의 생성 및 관리 등을 포함하는 총체적인 활동과 원칙에 대한 공학적 접근을 제시하여 전체 소프트웨어 개발비용과 위험부담을 경감시키며 품질향상을 이룰 수 있도록 한다. 또한, 각 업무 도메인과 개발 환경에 따라 적절하게 적용할 수 있도록 프로세스와 활동을 커스터마이징 및 컴포넌트화하고 요구사항 관리 도구의 프로토타입을 제시한다.

  • PDF

The Effects of IT Project Risk Management Factors on Project Performance (IT 프로젝트 위험관리요인이 프로젝트 성과에 미치는 영향)

  • Jang, Sung-Bong;Kwahk, Kee-Young
    • Korean Management Science Review
    • /
    • v.28 no.2
    • /
    • pp.31-51
    • /
    • 2011
  • Many companies have considered IT outsourcing as one of strategic alternatives in order to rapidly respond to changing business environment and strengthen their competitiveness. Despite its strategic role, however, IT outsourcing project has been plagued by a high failure rate and difficulty in realizing the promised project performance because of its inappropriate risk management. This study examines the effect of IT project management risk factors on project performance. We propose that project risk management factors(communication, technology sharing, and project control) influence project performance(process performance and product performance). Based on the empirical results, theoretical and practical implications of the study are discussed along with its limitations.