• Title/Summary/Keyword: 프로젝트 수행

Search Result 1,712, Processing Time 0.028 seconds

The Needs Analysis on Science Literacy Required for Koreans in the Future Society (미래 사회 한국인의 과학소양에 대한 요구 분석)

  • Jeon, Seung-Joon;kwak, Youngsun;Koh, Hun Yeong;Lee, Young Sik;Choi, Sung-Youn
    • Journal of The Korean Association For Science Education
    • /
    • v.37 no.3
    • /
    • pp.441-452
    • /
    • 2017
  • The goal of this study is to explore categories and components of science literacy and investigate the trend in the importance of each category of science literacy required for Koreans living in a future society in 2050 through survey analyses with the public. This study, as a preliminarily research, is a part of a larger project called 'developing science for all Koreans,' which investigates science literacy for all Koreans. According the survey result, the definition of science literacy should include scientific thinking and working methods, application of science, etc. in addition to existing science knowledge. We also suggested science literacy including knowledge and competencies, as well as organization of science subjects in 2050 future school education, and analyzed trends in the importance of science literacy domains. Based on the results, we suggested the scientific method, science knowledge, and science application as domains of science literacy. Discussed in the conclusion are implications and directions for developing 'science for all Koreans' living in a future society in 2050.

Trend Analysis of Labor Input Ratios by Work Types in Apartment Housing Constructions (공동주택 건설공사에서 공종별 실투입 노무비율의 추이분석)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.97-104
    • /
    • 2015
  • Apartment Housing 25 in the field of construction since 2000 collected by types of labor: reinforced concrete, plaster, internal, equipment, electrics communication, the other work. And the performance of labor input was collected in the amount of construction work performed on a monthly basis. After changing the construction period in the standardization work that is 100% of the construction period, the amount was converted into labor ratio by type. Analysis of the input flow rate and the amount of labor conclusions were as follows: (1) The size of the labor rate is reinforced concrete work (38.25%), plastering work (5.10%), internal work (5.67%), equipment work (9.10%), electrics communication (8.76%), the other works (33.12%) and the size of labor rate is the largest work in reinforced concrete work. (2) The peak of labor input ratio was from 52.5% month to 62.5% month. This was when the labor rate of 3.6%. (3) The period month of the largest labor ratio% is 35% month by reinforced concrete construction, and this time it was 2.12% per month labor rate, and reinforced concrete construction is finishing from 65% month to 80% month. This showed the greatest congestion of mutual interference between each works is being continue. The results of this study are the greatest congestion in apartment housing construction has informed the high period(%months), which is essential to a successful project.

Multi-dimensional Quality Model for Value Engineering in Planning Phase of Public Construction Program (공공 건설 프로그램의 기획단계 VE를 위한 다차원 품질모델)

  • Hyun, Chang-Taek;Kim, Jong-Hyeob;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.61-69
    • /
    • 2013
  • In the mixed-use development program, several conflicts occur due to the characteristics of construction program, such as large-scale, variety of stakeholders, long periods of time, etc. In particular, since the characteristics of the construction program having various complex projects lead to different requirements depending on stakeholders, it is crucial to plan the appropriate type and size of facilities. Therefore, it is necessary to derive solutions suitable for the needs of owner by conducting VE in the planning phase. In this study, a multi-dimensional quality model is developed to present proper facilities necessary for the construction program by clearly identifying the owner's requirements in performing VE in the planning phase. Through the development of the multi-dimensional quality model, the characteristics distribution of 15 major facilities by 12 performance indicators for mixed-use development programs is presented. The deduction method of appropriate facilities based on the requirements of owner and the multi-dimensional synthesis method among the performance indicators are also suggested. This study is significant as a basic research for the application of VE in the planning phase of construction program. It is expected that the multi-dimensional quality model proposed in this study could facilitate presentation and review of appropriate facilities based on the analysis of requirements of various stakeholders in the early stage of the construction program.

Analysis of Building Emergency Evacuation Process with Interactions in Human Behaviors (화재 시 재실자 행동의 상호 작용을 고려한 건물 피난 행태 분석)

  • Choi, Minji;Park, Moonseo;Lee, Hyun-Soo;Hwang, Sungjoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.49-60
    • /
    • 2013
  • Evacuation process has been considered as one of the most important elements to be managed in public facilities. Although the importance is highlighted through numerous literatures, disaster evacuation planning, particularly fire accidents, faces a number of human behavior related limitations for a similar application to different types of facilities/occupants. To overcome the obstacles including complexity in human behaviors, a number of simulation techniques with limited consideration on human behaviors are utilized to predict foreseeable problems in evacuation process. Therefore, this research aims to propose system dynamics models incorporating human behaviors considering different types of occupants under disaster evacuation events. Analysis on emergent human behaviors such as group forming and interactions under urgent situation are conducted based on the main stream theories in social science field. The results suggest the influences of human behavior factors including cooperative intention, information sharing, and mobility change to evacuation behavior. The implications are expected to provide safety consideration at planning/designing phase of buildings and help facility safety managers for evacuation planning with more realistic management approaches.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

Cost Estimation of Case-Based Reasoning Using Hybrid Genetic Algorithm - Focusing on Local Search Method Using Correlation Analysis - (혼합형 유전자 알고리즘을 적용한 사례기반추론 공사비예측 - 상관분석을 이용한 지역탐색 기법을 중심으로 -)

  • Jung, Sangsun;Park, Moonseo;Lee, Hyun-Soo;Yoon, Inseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.50-60
    • /
    • 2020
  • Estimates of project costs in the early stages of a construction project have a significant impact on the operator's decision-making in important matters, such as the site's decision or the construction period. However, it is difficult to carry out the initial stage with confidence because information such as design books and specifications is not available. In previous studies, case-based reasoning was used to predict initial construction costs, and genetic algorithms were used to calculate the weight of the inquiry phase among them. However, some say that it is difficult to perform better than the current year because existing genetic algorithms are calculated in random numbers. To overcome these limitations, correlation numbers using correlation analysis rather than random numbers are reflected in the genetic algorithm by method of local search, and weights are calculated using a hybrid genetic algorithm that combines local search and genetic algorithms. A case-based reasoning model was developed using the weights calculated and validated with the data. As a result, it was found that the hybrid GA-CBR applied with local search performed better than the existing GA-CBR.

Development of Workbench for Analysis and Visualization of Whole Genome Sequence (전유전체(Whole gerlome) 서열 분석과 가시화를 위한 워크벤치 개발)

  • Choe, Jeong-Hyeon;Jin, Hui-Jeong;Kim, Cheol-Min;Jang, Cheol-Hun;Jo, Hwan-Gyu
    • The KIPS Transactions:PartA
    • /
    • v.9A no.3
    • /
    • pp.387-398
    • /
    • 2002
  • As whole genome sequences of many organisms have been revealed by small-scale genome projects, the intensive research on individual genes and their functions has been performed. However on-memory algorithms are inefficient to analysis of whole genome sequences, since the size of individual whole genome is from several million base pairs to hundreds billion base pairs. In order to effectively manipulate the huge sequence data, it is necessary to use the indexed data structure for external memory. In this paper, we introduce a workbench system for analysis and visualization of whole genome sequence using string B-tree that is suitable for analysis of huge data. This system consists of two parts : analysis query part and visualization part. Query system supports various transactions such as sequence search, k-occurrence, and k-mer analysis. Visualization system helps biological scientist to easily understand whole structure and specificity by many kinds of visualization such as whole genome sequence, annotation, CGR (Chaos Game Representation), k-mer, and RWP (Random Walk Plot). One can find the relations among organisms, predict the genes in a genome, and research on the function of junk DNA using our workbench.

A Case Study of the Risk Identification in Construction Project (건설사업의 리스크 식별에 관한 사례연구)

  • Ahn, Sanghyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.15-23
    • /
    • 2015
  • In the construction industry, risk management has gained constant attention as the factor not only to evaluate global competitiveness of the country but also to secure competitiveness of public institutions and private companies. For effective construction risk management, the specific work process improvement that can be employed in the field in terms of risk management of the entire corporation such as financial, insurance and safety management is necessary. To manage construction risks, what is important is the step to identifying inherent risks in the construction project. The identification of risks will be followed by the step to seeking ways to establish and manage strategies responding to the risks. This study suggests ways and processes to make a checkslit to identify risks through case studies. To that end, the focus will be placed on working process improvement of risk identification among stages to manage construction risks such as risk identification and analyses, planning to respond to risks, risk monitoring and management. The case study checklists show that setting up the system to classify risks by stage is helpful to figure out causes of risks to reduce or eliminate risk factors. The checklist making process that considers features of the project is expected to contribute to successful completion of the project by enabling effective risk identification and systematic risk management.

Growth Model for Korean CM Firms based on 2012 Statistics (CM기업의 단계별 발전 전략 모델: 2012년 실적자료 기반 분석)

  • Jung, Youngsoo;Shin, Dongwoo;Kang, Seunghee;Kim, Namjoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.92-104
    • /
    • 2014
  • CM services have been increasingly practiced over the two decades in the Korean construction industry, and recent efforts focus on further development in advanced CM capabilities and expansion to overseas market. However, there has been lack of holistic research to investigate current status and future direction of CM industry in Korea. In this context, the purposes of this study are 1) to analyze current status of Korean CM industry in terms of owners, market, CM firms, contracts, and work scopes, 2) to define different types of CM practices, and 3) to propose growth models for Korean CM firms based on the defined CM project types. An extensive literature review and statistical analysis of 2012 CM contracts were performed in order to analyze the CM status. Based on the analyses, ten different CM types are defined, and growth paths of CM firms are illustrated. Implications and lessons learned during the statistical analysis and workshops are briefly introduced as well.

The Publicness of Public Art : Focused on the "Golden market, Golden Age" Public Art Project (공공미술의 공공성과 주체간 관계의 특성 -<황금시장 황금시대> 공공미술 사업 사례를 중심으로-)

  • Nahm, Kee-Bom;Nam, Miyoung
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.16 no.1
    • /
    • pp.118-134
    • /
    • 2013
  • This paper analyzes the pubic nature of New Genre Public Arts. It is very sensitive to the social issues and supports democracy and communities with the diverse civic participation. Therefore, it is be widely known without doubt that new genre public arts is more public in nature compared to the previous public arts. This research observes the practices of new genre public art and focuses on the problems of the revealing nature of new genre public art through the analysis of the interrelations among government, artists, and the residents by through observation on the , Seoul City Gallery project from October 2008 to January 2009. The implementation of the project is divided into three constituent parts: local government for funding, artists for planning and implementing, and residents. Local government supports and commands the public art works to create more competitive and harmonious city. Artists emphasize the revitalization of community and take the residents as the passive objects of enlightenment. Whereas, the residents hope to use the funds to improve economic conditions. Artists accept the top-down commands of government, whereas residents tend to passively participate and become objects for enlightenment by artists, after all, might be alienated by the project. These kinds of communications and relationships raise the issue of the possibility of failure of public arts projects.

  • PDF