• Title/Summary/Keyword: 프로젝트 성과평가

Search Result 242, Processing Time 0.028 seconds

A Study of Project Characteristics and Project Performance Level of difficulty (건설 프로젝트 특성과 프로젝트 성과 난이도 도출에 관한 연구)

  • Cho, Young-Seon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.78-88
    • /
    • 2010
  • Since the larger and complex construction projects are performed, project performance measurement is highlighting the importance to eliminate inefficiencies and plan to reasonable management practices. So many researchers are conducting research about the project critical sucess factor. But, these factors are mixed both management practices to improve performance and native project characteristics. Therefore performance measurement data couldn't apply to another project successfully. And the project characteristics affect project performance. But contractor couldn't change characteristics. This study provides a project characteristics's definition and classification. This study provides a quantitative level of performance improvement difficulty through out project manager survey. The contractor can estimate a level of performance difficulty through initial project information. With this, project contractor can more efficiently manage project.

A Case Study of Course-Embedded Assessment for Program Outcomes in Computer Science & Information Engineering (컴퓨터·정보공학 분야의 교과기반 학습성과 평가 사례연구)

  • Cho, Soosun
    • Journal of Internet Computing and Services
    • /
    • v.17 no.1
    • /
    • pp.73-81
    • /
    • 2016
  • This paper deals with the practical experience and lessons to develop a method of course-embedded assessment for program outcomes in Computer Science & Information Engineering. In engineering education, ABEEK(Accreditation Board for Engineering Education of Korea) has been nominated as an official accreditation from Korean government under some conditions of fulfillment. One of the conditions is enforcement of course-embedded assessment for program outcomes. In this paper, a method of course-embedded assessment in Computer Science & Information Engineering is suggested. The case study was done in a basic project course which includes the special assessment methods in project courses. The case study of course-embedded assessment in a basic project course was given with consideration for each step, that is, set up of program outcomes which are highly related to the course, selection of assessment tools such as written examination and project-based assessment, set up of assessment criteria, implementation of course-embedded assessment, and analysis of results. The proposed method is expected to be a good example to construct the whole strategy for course-embedded assessment in Computer Science & Information Engineering.

An Exploratory Study on Project Quality Certification System and Organizational Culture for Project Quality Improvement (프로젝트 품질 인증 제도와 기업의 문화에 따른 프로젝트 품질 향상에 관한 탐색적 연구)

  • Moon, Song-Chul;Kim, Hyun-Soo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.705-712
    • /
    • 2003
  • 소프트웨어 개발 프로젝트가 복잡, 대형화되어 프로젝트 품질이 매우 중요해짐에 따라 소프트웨어 개발 업체의 개발 능력 수준을 객관적으로 평가하기 위하여 CMM모형이 참조되고 있다. 소프트웨어 개발 업체들은 과다한 비용을 투자하며 CMM등급을 인증받기 위하여 노력하고 있으나 CMM 인증의 신뢰성에 대하여 문제가 제기되고 있는 상황에서 CMM등급 인증이 프로젝트 품질 성과에 차이를 나타내는지의 연구와 CMM등급 인증과 기업 문화의 적합이 프로젝트 성과에 차이를 나타내는지에 대하여 적합 구조 이론을 참조하여 연구하였다. 연구 결과, CMM인증 등급별로 해당 조직에서 수행한 프로젝트의 품질 성과에 유의한 차이가 존재하고, 특히 CMM인증과 기업 문화 수준이 적합되어질 때 프로젝트의 품질 성과에 유의한 차이가 있음이 밝혀졌다.

  • PDF

Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit (성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안)

  • Kang, Namhee;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.42-51
    • /
    • 2017
  • Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.

An Evaluation Model of IT PMO Performance Using Pentagon Model (Pentagon Model을 활용한 정보화 프로젝트 PMO의 성과평가 모형 제시)

  • Kim, Ki-Hyun;Park, Geun-Wan;Hwang, Seung-June
    • The Journal of Society for e-Business Studies
    • /
    • v.21 no.4
    • /
    • pp.119-136
    • /
    • 2016
  • Precedent studies revealed that success of IT project strongly depends on the competency of PMO(project management offices), however, there are only few studies which show the importance of PMO competency. In this study, we will suggest an evaluation model of IT PMO competency using the Pentagon Model which is a tool to assess the performance of project organization, and the Analytic Hierarchy Process. We classified effect factor of PMO competency into 25 items in 5 fields such as Structure, Technology, Culture, Interaction, Social Relations and Networks based on pentagon model, also analysis of criticality between the effect factors was conducted by AHP. The study result shows 3 factors of Structure were included in the top 10, while 2 factors of Technology, Culture, Interaction were included separately. In terms of Social Relations and Networks, only 1 factor was included in the top 10. Therefore Structure of PMO should be aggressively considered for the successful IT project.

지역 특성을 반영한 R&D 프로젝트 평가 관리 시스템 개발

  • Park, Seong-Taek;Gyeong, Won-Hyeon;홍정유, Jeong-Yu;Go, Seok-Ha
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2006.12a
    • /
    • pp.237-255
    • /
    • 2006
  • 국내 정부부처 및 지역자치단체에서 수행하고 있는 연구개발 프로젝트의 선정과 평가에 관한 연구는 광범위하게 이루어지고 있다. 그러나 각 정부 부처별로 실시하는 평가프로세스와 지표의 경우 부처별 특성과, 과제의 특성을 반영하기 위한 프로세스와 지표를 개별적으로 보유하고 있으나, 과제의 평가를 수행하는 조직의 규모나 지역적 특색을 반영하기 어렵다.본 연구는 C 지역의 테크노파크(TechnoPark) 사업자가 수행하는 지역 자치단체 중심 R&D 프로젝트의 특성과 지역적인 특색을 반영한 평가관리 시스템을 개발하고자 한다. 본 연구에서는 먼저 국내 출연연구기관 및 정부부처에서 수행하는 평가시스템의 특성을 파악하고, 각 기관에서의 평가프로세스와 평가지표들을 조사하여 공통적/개별적 특성을 분류하였다. 분류된 프로세스와 지표들과 C 지역의 지역/산업적 특색을 분석하고 C 지역에서 수행한 3년간의 모든 과제에 대한 분석을 수행하여 지역적인 특색을 반영한 평가프로세스와 지표를 도출하였다. 또한 연구개발 프로젝트의 선정평가를 위한 사전 기술성 평가를 위한 기술가치평가와, 프로젝트의 수행결과 이후 나타나는 부가적인 효과를 분석하기 위하여, 프로젝트단위의 균형성과지표를 적용하여 프로젝트의 사후/추적관리 방안을 제시하고자 한다.

  • PDF

An Analysis of Learning Achievements in Team Project-Based Computer Programming Classes (팀 프로젝트 기반 컴퓨터 프로그래밍 수업의 학습 성과 분석)

  • Ahn, You Jung
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2020.01a
    • /
    • pp.257-258
    • /
    • 2020
  • 팀 프로젝트 기반 컴퓨터 프로그래밍 수업에서 팀의 동료 학습자들은 공동의 성과물을 얻기 위해 다양한 팀 활동을 하게 되며 그 과정에서 여러 학습 능력이 향상될 수 있다. 본 연구에서는 팀 프로젝트에 참여하는 학습자들이 팀 구성, 주제 선정, 프로젝트 계획서 작성, 역할 분담, 팀 단위의 프로그래밍 개발 활동 및 평가에 참여하는 과정에서 얻게 되는 학습 성과를 분석해보고자 한다. 팀 프로젝트 수행과 관련 있는 창의력, 협동 능력, 의사소통 능력 그리고 문제해결 능력에 대해 학습자들 스스로 얼마나 향상되었다고 느끼는지 조사분석하여 다음 학기 수업 운영 시 교수법 개선에 반영하고자 한다.

  • PDF

Analyzing the Structural Relationships between Project Manager's Creative Thinking, Entrepreneurship, and Project Performance (프로젝트 담당자의 창의적 사고, 기업가정신, 프로젝트 성과 간의 구조적 관계 분석)

  • Lee, Seol Bin
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.12 no.1
    • /
    • pp.87-99
    • /
    • 2017
  • This study is intended to look into the structural relationships between project manager's creative thinking, entrepreneurship, and project performance. To achieve this, research model and hypothesis were established to carry out statistical analysis based on the results of an empirical sample survey. The findings showed that project manager's creative thinking didn't improve project satisfaction directly, but it improved project satisfaction through the mediating effects of project manager's entrepreneurship. While it had a direct effect on perceived project performance, project manager's entrepreneurship was not mediated in this process. This suggests that even if project managers have a high expertise, thinking skill and motivation as creative thinking in working on the project, they have the limitation in leading to customer satisfaction from a personal perspective.

  • PDF

Key Performance Indicators of Building Project (건축 프로젝트의 경영성과지표 선정 연구)

  • Choi, Jae-Hwi;Sohn, Hyo-Won;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.61-72
    • /
    • 2011
  • Management performance of a construction company can be the sum of management performance of each different project. Therefore, the measurement of management performance following construction projects is essential for securing the competitiveness of a company. However, most research has been related to the performance measurement of the construction industry and companies and little has been conducted on individual project's performance. In particular, building projects have various characteristics depending on construction orderer, type and commissioning entity but no performance indicators have been selected based on this classification. This study aims to select performance indicators for subdivided areas based on project characteristics as well as those which can be commonly used to measure management performance at construction and trial run stages of building projects. In the future, those indicators proposed in this study can be used for developing methodology to evaluate them and later applied to actual building projects to generate quantitative data. In addition, they are expected to be used as reference for selecting indicators to measure management performance of plant and civil engineering projects.

The Effects of User Attitude and System Management level on the System Performance (사용자태도와 시스템 관리수준이 성과에 미치는 영향)

  • Han, Gyeong-Il
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.249-255
    • /
    • 2007
  • 본 연구의 목적은사용자 태도와 정보시스템 관리수준이 어떻게 조합되었을 때 정보시스템 성과에 영향을 주는가는 알아보기 위한 것이다. 시스템 관리변수로는 정보시스템의 평가기준관리와 프로젝트관리로 정의하였다. 정보시스템을 평가하기 위하여 시스템개발과 운영과정에서 개발자들이 중요하다고 생각하는 효과성, 생산성, 사용자 친숙성, 생산성 등 25개 항목을 조사하였고, 프로젝트 관리활동은 규모, 노력 기간, 결점등이 조사되었다. 연구목적을 달성하기 위하여 실증연구가 이루어졌다. 연구 결과는 보면, 사용자의 태도가 호의적이면 시스템 성과가 높은 것으로 나타났다. 그리고 비호의적인 집단에서도 평가기준관리와 프로젝트관리를 철저히 하면 성과가 높아지는 것으로 나타났다.

  • PDF