• Title/Summary/Keyword: 프로젝트 계획

Search Result 712, Processing Time 0.027 seconds

Quality-Based Software Project Staffing and Scheduling with Project Deadline (제한된 프로젝트 기간을 고려한 품질 기반 소프트웨어 프로젝트 계획 생성 기법)

  • Seo, Dongwon;Shin, Donghwan;Bae, Doo-Hwan
    • Journal of KIISE
    • /
    • v.42 no.7
    • /
    • pp.878-888
    • /
    • 2015
  • Software project planning includes several processes for estimating the effort required to complete software project tasks, allocating human resources to tasks, and creating a project plan. Because software planning is becoming more complicated as the size of software projects grow, it is difficult for project managers to decide on a reasonable project plan. To help them, many automatic software project planning approaches have been proposed. The approaches all focus on minimizing project duration. But if the plan is simply to minimize the duration, without considering software quality, the plan can harm the eventual software quality. In our research to create a reasonable project plan, we consider software quality as well as duration of the project, by defining a software quality score. The project manager can plan the project to maximize software quality for a specific project duration.

Case studies in software development projects apply EVM(Earned Value Management) (소프트웨어개발 프로젝트에서의 획득가치관리(EVM: Earned Value Management) 적용 사례 연구)

  • Jun, Sung-Chul;Kim, Ja-Hee
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.260-265
    • /
    • 2008
  • 소프트웨어 개발 프로젝트 초기단계에 수립한 일정 및 비용 등의 계획은 수행 중 발생하는 많은 불확실성을 반영하고 있지 않기 때문에 진행되고 있는 프로젝트는 초기에 계획한 일정과 비용에 많은 차이를 보이는 경우가 발생한다. 이에 따라 본 연구에서는 진행 중인 소프트웨어 개발 프로젝트의 상황을 분석하고 예측할 수 있는 방법으로 일정과 비용을 통합 관리할 수 있는 획득가치관리(EVM: Earned Value Management)를 활용하는 방안을 제시하였다. 획득가치관리(EVM)을 적용하기 위해 일정과 비용의 통합관리하기 위해 예상되는 투입 인력과 비용 등을 감안하여 작업분할 구조(WBS)와 연계하여 계획을 수립하고 측정하는 방법을 구축 중인 프로젝트의 사례를 통하여 적용 방안을 제시하였다. 사례 분석한 각각의 프로젝트 진행 단계에 따라 예측한 값이 실제 계획 대비 일정과 비용에 대한 예측 오차 변화 추이를 분석하였으며, 향후 진행되는 프로젝트의 일정 및 비용 등의 계획을 체계적으로 수립하고, 진행되는 프로젝트의 일정 및 비용 등에 대해 분석하고 예측하는데 활용할 수 있도록 연구하였다.

  • PDF

PERT와 CPM을 이용한 인공위성 개발 프로젝트 일정계획에 관한 연구

  • Kim, Hyeong-Wan;Choe, Jeong-Su;Park, Jong-Seok
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.174.1-174.1
    • /
    • 2012
  • 현재 인공위성 개발 프로젝트들을 계획하고 일정계획을 수립하기위해 간트차트가 널리 활용되고 있다. 간트차트는 프로젝트의 각 작업들이 언제 시작하고 종료되는지에 대한 작업 일정을 막대 도표를 이용하여 표시하는 프로젝트 일정표로 다양한 형태로 변경하여 사용할 수 있으나 작업경로를 표시할 수 없으며 계획의 변화에 대한 적응성이 약한 단점이 있다. 또한 일목요연하게 눈으로 보여줄 수 있으나 효과적인 프로젝트 관리에 중요한 활동 사이의 어떤 관계에 대한 정보를 주지 못한다. 인공위성개발과 같은 복잡한 프로젝트에 대해 간트차트와 더불어 PERT(Program evaluation and review technique)와 CPM(critical path method)과 같은 네트워크 도(Network Diagram)와 함께 사용될 수 있도록 그 이론과 활용방안에 대해 기술하고자 한다. PERT와 CPM은 큰 프로젝트를 계획하고 조정하기 위해 폭넓게 사용되는 두 가지 기법이다. PERT와 CPM을 사용하면 프로젝트 활동에 대한 그래프를 통한 도시, 프로젝트 소요시간 추정, 프로젝트 완료시간 준수를 위해 중요한 활동의 식별, 전체 프로젝트에 대한 지연 없이 가능한 각 활동의 지연시간 추정과 같은 이점이 있다. PERT와 CPM은 독립적으로 개발되었지만, 많은 공통점이 있다. 더 나아가서 둘 사이에 원래 존재했던 차이점은 많은 부분은 서로의 특징을 도입하면서 거의 사라졌다. 실제적으로 볼 때, 두 기법은 지금 같은 기법이며, 기술된 특징과 절차는 PERT분석 뿐 아니라 CPM 분석에도 적용될 수 있을 것이다.

  • PDF

Automatic Project Planning Technique and Tool Based on Software Industry Requirements (소프트웨어 산업체 요구사항을 반영한 자동화된 프로젝트 계획 생성 지원 기법 및 도구)

  • Park, Jihun;Shin, Donghwan;Hong, Gwangui;Seo, Dongwon;Hwa, Jimin;Bae, Gigon;Seo, Yeong-Seok;Bae, Doo-Hwan
    • Journal of Software Engineering Society
    • /
    • v.26 no.4
    • /
    • pp.77-92
    • /
    • 2013
  • To plan a software project, the manager (1)make a work breakdown structure (WBS), (2) estimate efforts for each task, (3) assign employee to each task, and (4) estimate overall schedule. When software project becomes complicated, the possible combination of WBS, effort, and employee assignments dramatically becomes larger. Software planning tool can help software project managers to deal with this complexity. In this research, we discuss with a group of experts who work in software industry, to elicit practical requirements that should be considered in the software planning technique. Considering these requirements, we develop a software project planning tool APP (Automatic Project Planner) which provide effort estimation based on historical knowledge data and automatic human resource allocation. Our technique can be the basis of reasonable and practical software project planing.

  • PDF

Data-driven Interactive Planning Methodology for EPC Plant Projects (EPC 플랜트 프로젝트의 초기 공정계획을 위한 통합 데이터 활용 방안)

  • Wang, Hankyeom;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.95-104
    • /
    • 2019
  • EPC plant projects are large and complex, requiring systematic working methodologies, accumulated data, and thorough planning through communications between the entities. In this study, the method of extracting the process planning information using asset data of the plant project and using it to present the initial process plan is presented through the concept of IAP(Interactive Planning). In order to carry out the effective IAP at the early stage of the project, this study extracted the schedule element information from the asset data, created the process plan for each work package, and applied it to the sample project case. Through the proposed IAP methodology, it is possible to promote the utilization of asset data, to identify schedule risks, and to develop countermeasures, which can form the basis for establishing the process management strategy to successfully complete the project.

Improved Effort Estimation Process for Work Load Balancing in SM Project. (SM 조직의 Effort Estimation 프로세스 개선을 통한 업무 Load Balancing 방안 연구)

  • Kim, Suk-Yong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.11a
    • /
    • pp.397-400
    • /
    • 2005
  • SM 프로젝트는 SI 프로젝트와 달리 고객의 요청 사항(CSR)이 있을 때 마다 개발 계획을 세우고 관리를 하여야 하며 동시에 고객의 개발 요청 내용 외에도 운영업무에 대한 계획도 같이 세워 져야 한다. 하지만 대부분의 SM 프로젝트에서는 한 두 사람의 경험이나 판단으로 계획이 작성, 할당되며 운영업무에 대한 계획의 정확도도 떨어져 업무 load balancing 이 잘 되지 않는다. 본 논문에서는 이러한 문제 해결을 위해 효과적인 SM 프로젝트에서의 EFFROT ESTIMATION 프로세스를 제안하여 업무 load balancing 을 이루는 방안을 제시하고자 한다.

  • PDF

Effective Project Planning based on CMM and XP (CMM과 XP를 적용한 효율적인 프로젝트 계획 수립)

  • 이화연;최호진;이도재
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2004.04b
    • /
    • pp.415-417
    • /
    • 2004
  • SPI 전문가들은 CMM과 XP의 양립 가능성에 대해서 긍정적인 의견을 보이고 있으며, 두 방법론이 동시에 적용되었을 때 시너지 효과를 얻을 수 있다고 주장한다. 그러나 국내 기업의 SPI 활동 수준은 아직 초보적인 수준에 있고 CMM과 XP 방법론을 동시에 적용하기 위한 가이드라인이 부족한 형편이다 본 논문에서는 CMM과 XP를 함께 적용하는 방안의 하나로 XP의 프로젝트 계획 짜기 게임의 절차에 CMM이 요구하는 프로젝트 계획 활동을 포함시키는 프로젝트 계획 수립을 제안한다.

  • PDF

An Application Case on Project Management Technology in LPG Storage Cavern Project (프로젝트관리기법의 LPG Storage Cavern Project 적용사례)

  • 신용훈;김호영;이철욱
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.4 no.3
    • /
    • pp.23-37
    • /
    • 2002
  • 프로덕트 관리를 통하여 발주자에게 제공해야 하는 산출물에 대한 구체적인 특성 및 제원이 규명되면, 프로젝트 관리를 통하여 발주자에게 제공해야 하는 산출물에 대한 구체적인 작업 및 자원이 규명된다. 또한 프로젝트 관리는 설정된 공기, 공사비, 품질 등의 프로젝트 목표를 만족시킴으로써 그 역할을 수행하게 된다. 최근 국내외 프로젝트의 입찰 과정을 볼 때 발주자의 요구사항이 점점 까다로워지고 제약 조건은 더욱 강화되고 있는 추세이다. 따라서 몇몇 사람의 특화된 감각이나 과거 수행된 계획의 답습만으로는 이러한 추세에서 제대로 대응하여 프로젝트 목표를 달성하는 것은 매우 힘든 실정이다. 본 기술보고에서는 프로세스를 통하여 프로젝트 계획을 개발함으로써 과학적이며 체계적인 프로젝트 관리가 이루어질 수 있음을 보여주고자 한다.

  • PDF

TRON 프로젝트중 마이크로 프로세서

  • 최윤석
    • 전기의세계
    • /
    • v.37 no.8
    • /
    • pp.45-50
    • /
    • 1988
  • 일본의 독자적인 운영 체제 개발 계획인 TRON(The Real time Operating system Necleus) 프로젝트는 지금껏 미국에 의존해 온 일본의 컴퓨터 업계가 독자적인 운영 체제의 개발과 아울러 유저가 퍼스컴을 기종에 관계없이 통일 규격에 의해 쉽게 사용할 수 있는 90년대에 요구되는 새로운 컴퓨터를 탄생시키기 위한 계획이다. TRON 프로젝트는 크게 5가지의 보조 프로젝트로 그중 4개는 여러 응용에 적합한 운영 체제의 개발을 위한 것이고 나머지는 이러한 운영 체제가 효과적으로 동작할 수 있는 마이크로 프로세서의 개발을 위한 것이다. 본고에서는 TRON 프로젝트중 마이크로 프로세서의 개발 계획에 관하여 소개한다.

  • PDF

A Knowledge-based Approach to Plant Construction Process Planning (지식 기반 플랜트 건설 공정 계획 시스템의 개발)

  • 김우주
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.81-95
    • /
    • 2001
  • Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.

  • PDF