• Title/Summary/Keyword: 품질보증업무

Search Result 45, Processing Time 0.03 seconds

A Study on method of EAI solution testing (EAI 시스템 테스트 방법에 관한 연구)

  • Lim, Sung-Joon;Koo, Ja-Kyung;Shin, Seok-Kyoo
    • Annual Conference of KIPS
    • /
    • 2005.11a
    • /
    • pp.1511-1514
    • /
    • 2005
  • 최근 부각되고 있는 기업 업무 프로세스 통합을 위해 EAI(Enterprise Application Integration) 시스템을 도입하고 있다. 하지만 아직 EAI 시스템의 품질을 보증하기 위한 테스트 방법이 제공되고 있지 않는 실정이다. 본 논문에서는 EAI의 기능을 이루는 요소별로 분리하고, 각각 분리된 기능별로 테스트를 수행하는 방법을 제시하고자 한다.

  • PDF

The Voluntary Assurance of Quality by Contractors in the Construction Phase (건설 공사단계에서 수급자 중심의 품질확보방안)

  • Cha, Sang-Ho;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.292-300
    • /
    • 2011
  • The construction industry in Korea has seen significant improvements in quality management techniques, driven by the dramatic development of new technology through Manhattanization and enlargements, but compared with technical development, the level of building quality improvement is still lagging behind. In the meantime, as the interest in construction quality soars due to changes in user consciousness, the level of quality that is being demanded is rising. The government has reinforced quality systems by implementing responsible supervision requirements and granting overseas companies permission to enter the supervision business in Korea, and private sector companies also are attempting quality improvement through quality assurance approaches like the preliminary qualification screening system and ISO 9000 series. But currently, building constructions are done only according to the construction specifications of project owners, whose design, materials and construction methods are already decided, and do not leave any necessity or opportunity for technical developments for the quality improvement of contractors. Therefore, in this study, a work process and system improvement plan for payment regulations is proposed, with which contractors can secure quality voluntarily in the building construction phase.

건설산업경쟁력 강화와 부실방지대책(안)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.54 s.71
    • /
    • pp.185-206
    • /
    • 1996
  • 1.건설제도의 국제화와 경쟁기반 구축 $\bullet$건설산업을 기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$사후관리 등 전 분야에 걸쳐 경쟁력 있는 산업으로 육성-기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$유지관리 등 건설산업 전반에 관한 기본사항을 법제화-대규모 공사의 경우 발주자를 대신하여 건설공사의 기획$\cdot$설계$\cdot$발주$\cdot$감리$\cdot$시공관리 등 업무의 전부 또는 일부를 종합적으로 조정$\cdot$관리하는 $\lceil$건설사업관리$\rfloor$제도를 도입 $bullet$건설공사 $\lceil$현장실명제$\rfloor$도입을 통한 하도급제도의 정비-전문건설업자로부터 하도급, 위탁, 고용 등의 형태로 공사에 참여하는 현장근로자를 신고 받아 권익을 보호하고 시공책임도 부과하는 $\lceil$현장실명제$\rfloor$도입 $\bullet$공사완성보증제, 손해배상보증제도를 도입하고, 신용상태 $\cdot$시공능력에 따라 보증 요율 등을 차등화 하여 부실업체를 배제 $\bullet$건설공사관련 각종 계약서와 시방서 등 제기준을 정비하여 발주자$\cdot$시공자 등 건설주체간의 역할과 책임을 명확화$\bullet$건설분쟁을 신속하고 객관적으로 조정$\cdot$중재하기 위하여 $\lceil$건설분쟁중재원$\rfloor$으로 확대 개편 2. 건설인력의 육성과 고용안정$\bullet$경쟁력 제고의 관건인 우수인력 확보를 위하여 대학교육 제도의 개선을 포함한 건설 인력 수급대책을 추진 - 대학의 건설관련 학과 정원을 2000년까지 매년 일정규모로 증원하여 고급기술 인력을 배출 현재 50$\%$에 불과한 건설관련 국가기술자격자를 2000년에 70$\%$까지 제고 - 감리 등 전문인력을 양성하고, 선진외국 감리 회사를 활용하여 국내 업계와의 경쟁을 유도 $\bullet$건설현장의 최일선에서 품질을 담당하고 있는 건설기능공의 고용안정과 복지향상을 위한 획기적인 대책을 마련 - 건설기능공의 자긍심과 사회적 책임의식을 고취하기 위해 기능공이 여러 현장을 전전하여 근무하더라도 경력관리, 공제금 등의 합산 관리가 가능하도록 $\lceil$건설 근로자 복지카드$\rfloor$제도를 도입 *$\lceil$건실시연구단$\rfloor$을 구성$\cdot$구체적인 운영방안을 수립 - 건설 업체 실정에 맞는 현장위주의 기능검정제도 도입 $\cdot$자격증이 현장에서 요구되는 기능수준과 숙련도를 제대로 반영할 수 있도록 검정방법을 현장 실기위주로 개선하고 자격검정업무도 건설협회 등의 자격 검정능력을 향상시켜 위탁$\cdot$시행하는 방안을 검토 3. 공사시행기관의 전문성과 책임성 제고 $\bullet$시장이 개방되어 건설공사가 국제적인 관행에 따라 이루어질 것에 대비하여 시행기관에 계약$\cdot$공사관리 등 전문직공무원을 집중 교육하여 양성 $\bullet$ 조달청이 대행하여 공사계약을 하는 경우라도 설계변경은 발주기관이 자체적으로 할 수 있도록 허용 $\bullet$ 기술직 공무원의 기술향상을 위하여 관련 공무원의 확충, 해외연수, 현장교육 강화 등을 지속적으로 추진 $\bullet$ 충분한 사전조사를 거쳐 사업계획을 수립하도록 $\lceil$건설공사 시행절차$\rfloor$를 규정 $\bullet$ 공사기간 3년 이상의 공사에 대하여는 최대한 계속비사업으로 편성토록 계속비제도의 운영을 활성화 4. 건설현장의 품질관리체제 구축 $\bullet$ 현장배쳐플랜트 설치를 확대하여 레미콘의 품질관리를 일원화하고 현장에서 레이콘을 배합하는 건식공법을 채택 - 현장레미콘생산시설(B/P)설치 확대로 콘크리트 하자에 대한 책임한계 일원화 유도 - 레미콘 재료인 골재$\cdot$시멘트$\cdot$물을 공장에서 혼합하여 공급하는 현행 습식배합 대신에 물만을 현장에서 혼합하는 건식 배합방식을 도입 $\bullet$철강재$\cdot$철구조물의 품질을 보증하기 위하여 일정기술을 갖춘 공장에서만 제작토록 하는$\lceil$공장인증제$\rfloor$를 도입 - 제작시설과 품질관리 등을 심사하여 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 사후관리를 일괄 책임질 수 있도록 $\lceil$시공 및 유지관리 일괄계약제도$\rfloor$를 도입 - 대형교량$\cdot$소각로$\cdot$하수처리장 등 유지관리에 전문성이 요구되는 분야부터 시범적으로 도입 $\bullet$건설자재의 표준화$\cdot$정보화사업을 조속히 추진 5. 건설업체에 대한 지원 강화 $\bullet$일부 공공사업자의 경우 관행화되어 있는 대금일부의 어음 또는 채권지급방법을 단계적으로 축소 $\bullet$매월 감독이나 감리원의 기성확인에 의하여 시공자에게 공사대금을 직접 지급토록 하는 등 대금 지급절차를 간소화 6. 민간 건축물에 대한 안전확보 $\bullet$충실한 설계가 이루어지도록 제도를 개선 - 설계도서 작성기준을 제정하고 다중이용시설에 대하여는 건축심의단계에서 구조검토 등 설계심의를 의무화 $\bullet$대형다중이용시설에 대한 감리 강화 - 감리전문회사 수준의 감리체제로 전환하고 감리대가도 공공수준으로 인상하고 적용요율대로 지도$\cdot$감독 강화

  • PDF

Game Fun QA(Quality Assurance) Process and Design to improve user satisfaction (사용자 만족도 향상을 위한 게임 Fun QA 프로세스와 설계)

  • Yoon, Seon-Jeong
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.24 no.11
    • /
    • pp.1451-1456
    • /
    • 2020
  • Depending on the size and complexity of the game, interest in game quality control is increasing. The quality of the game can be evaluated through fun and stability tests, and the player's satisfaction varies greatly accordingly. For the quality control of the game, Fun QA is in charge of testing to increase the fun and give satisfaction to the players. In this study, we first looked at software quality improvement techniques and game QA work. And in order to improve game quality, we analyzed Fun QA, which is relatively unstructured compared to Technical QA, which is mainly responsible for stability testing. Based on this, the Fun QA process was proposed and an example of Fun QA design was presented using real games. It is expected that this study will be one of the pillars of the game quality management area pursuing quality improvement by guaranteeing fun. Furthermore, it is expected to help QA workers expand their work area.

A Study on the Applicability of FMEA and it's Results for Hand Grenade in Government Quality Assurance Planning (군수품 정부품보활동계획에 FMEA 분석결과의 적용방안 및 적용결과의 고찰)

  • Lee, YoungWoo;Kwon, InKyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.2
    • /
    • pp.252-258
    • /
    • 2016
  • Risk identification based on the government quality assurance activity for military goods is being conducted to determine the risks to be reflected in a government quality assurance plan. On the other hand, current risk evaluation method focuses mainly on the functional requirements of the product specifications, which is a lack of reflection and identification of risks considering the process and the method is determined from a personal opinion, for example experience and know-how, which results in a lack of objectivity. Therefore, a standard of judgment according to quantitative data, which includes the present process control data using the FMEA method is required to improve the objectivity and dependability. This paper proposes useful suggestions for a government quality planning method to apply the results of FMEA to hand grenades.

A Research for effect on the audit quality and project performance by the service quality of information system audit (정보시스템감리의 서비스품질요인이 감리충실도와 프로젝트성과에 미치는 영향 연구)

  • Kim, Dong-Soo;Kim, Hyun-Soo;Yang, Kyung-Sik;Kang, Jae-Hwa
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.05a
    • /
    • pp.380-387
    • /
    • 2006
  • 정보화가 급격히 확산되면서 정보화로 인한 파급효과와 더불어 정보화의 위험과 역기능 방지와 정보시스템의 품질을 제고하기 위한 최적의 방법중 하나로서 정보시스템 감리에 대한 중요성과 그 수요가 증가하고 있다. 더불어 감리내실화와 신뢰성제고를 위한 기술연구와 제도연구도 지속적으로 수행되어왔다. 많은 감리의뢰기관이 감리자체를 시업성공을 위한 품질보증 및 생산성 향상을 도모하기 위해 실시하는 중간평가로 보지 않고 있고, 감리인의 학력.경력.자격수준 및 신기술에 대한 이해도, 숙련도 부족과 감리대상업무파악 미흡으로 현장감각이 부족하여 실제보다 형식에 치우쳐 있다. 따라서, 정보시스템 감리의 서비스품질이 상대적으로 취약하여 감리의뢰기관이나 피감리 기관으로부터 신뢰를 얻지 못하고 있다. 본 연구에서는 마케팅분야의 서비스품질평가모형을 일부 도입하여 감리서비스 품질요인과 감리품질 또는 감리충실도간의 관계를 규명하고, 나아가서 감리충실도에 영향을 끼치는 요소는 외적서비스요인과 내적서비스요인으로 구분하였으며, 이요인들이 감리충실도에 미치는 영향을 규명코자 하였다, 더불어 감리충실도가 감리효과 및 만족도와 프로젝트성과에 미치는 영향을 규명코자 하였다.

  • PDF

A Study on Efficient Game QA Project Management based on JIRA (JIRA 기반의 효율적인 게임 QA 프로젝트 관리에 관한 연구)

  • Kim, Ji-Eun;Kim, Hyo-Nam
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2021.07a
    • /
    • pp.151-154
    • /
    • 2021
  • 본 대학에서 게임 개발 프로젝트를 진행할 때 개발팀에서는 프로젝트 관리를 위해 프로젝트 관리 툴을 사용하고, QA팀에서는 버그 관리를 위해 BTS 툴을 사용한다. 본 논문에서는 BTS 툴을 소개하면서, 개발팀과 QA팀이 게임 개발 과정의 QA 프로젝트에서 프로젝트 관리와 버그 관리를 효과적으로 수행하는 방법에 대해서 연구하였다. 프로젝트 관리와 버그 관리 기능을 모두 가지고 있는 JIRA라는 툴을 선정하여 집중적으로 연구하였으며, 업무에서 JIRA를 사용할 때 효율적으로 사용할 수 있는 방법을 제시하고자 한다.

  • PDF

국외 원자력 연구기간의 TQM 분석

  • 이영건;권혁일;장호일;김성기;김종숙;남지희;임갑순
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.05d
    • /
    • pp.555-560
    • /
    • 1996
  • 막대한 연구재원이 소요되는 원자력 개발분야에서 세계 초일류수준을 유지하고 있는 선진 원자력 연구개발사업기관들은 하나같이 종래에 도입한 "원자력 품질보증체제"를 확대시켜 "품질 무한경쟁시대"에 부응하는 "종합적 품질경영체제"를 도입하고 있다. 본 연구에서는 효율적인 연구소 경쟁력제고 방안도출을 위한 노력의 일환으로 현재 Total Quality Management(TQM) 체제를 도입하고 있는 해외의 ORNL(Oak Ridge National Laboratory), AECL(Atomic Energy of Canada Limited), ABB CE(Asea Brown Boveri Combustion Engineering), DNA(Defense Nuclear Agency)등을 방문한 결과를 토대로 연구소적 TQM체제 성공과 실패의 원인을 분석하여 도입당시의 추진조직, 추진전략, 추진효과에 대해 체계적으로 비교 분석하여 한국정서에 부합된 연구소적 성공 TQM체제 모델을 도출코져 시도하였다. 분석결과 이들 기관들은 TQM 추진을 위하여 먼저 단계별로 단기, 중기, 장기 계획을 수립하고, TQM 실무위원회를 구성하여, 최고경영자가 직접지휘하는 Top-down 방식의 TQM 추진으로 품질문제를 사전에 예방하고 있었다. TQM 도입 초기 실무부서로 부터의 적잖은 저항과 애로사항이 도출되어 많은 시행착오를 거쳤으며 지금은 TQM 정착단계에 있었다. 이러한 과정에서 원자력 선진기관들은 전사적인 TQM 교육을 통해 철저한 TQM 마인드를 고취시켰고 전 부서의 업무가 전사적 TQM 차원에서 수행되었다. 우리나라 원자력기관에서의 바람직한 TQM 도입 모델로서 첫째, 전직원 대상 TQM 교육실시를 통한 TQM 인식고취, 둘째, TQM 성공체제로서 "경영품질"에 초점을 맞춘 관리시스템 확보, 셋째, 동서문화 차이를 고려한 Bottom-up '||'&'||' Top-down 혼합방식을 제시하였다.ottom-up & Top-down 혼합방식을 제시하였다.

  • PDF

Strategies for developing the Appropriation Method of the Construction Quality Cost (건설공사 품질관리비용의 구성요소 및 현실화를 위한 계상방법에 대한 고찰)

  • Park, Kyeong-Geun;Park, Yun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.101-111
    • /
    • 2011
  • Clients ought to Appropriate the cost of quality management for contractors based on Construction Technology Management Act. The costs of safety management and environment reservation are separately estimated. and the quality management cost is added up to secure the construction quality required on sites. However, the sufficient cost for quality management was not allowed to the contractors, due to the viewpoints of the clients that the quality management should be one of the duties of contractors. In addition, an Account-related legislation enacted a provision of the labor cost of quality management as the one that should be included in the indirect labor cost. From the continuous survey the quality management cost is currently estimated by 0.2% of the total project cost and the contractors protest the portion of the quality management cost is insufficient. Thus, this paper aimed to provide the bases of estimation of the actualized quality management cost considering the viewpoint of contractors.

A Study on Improving Plan of the Evaluating System for Efficient Defense M&S Accreditation Work (효율적인 국방M&S 인정업무 수행을 위한 평가시스템 발전방안 연구)

  • Han, Seung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.42-48
    • /
    • 2021
  • Recently, the defense industry has been improving high technology by developing convergence technology through the 4th industrial revolution. On the other hand, it is very difficult to guarantee the performance of high-tech weapon systems because the test for weapon systems has many risks and cannot perform in an actual operating environment. Therefore, M&S resources are needed to make sound weapon systems, but many people demand reliable M&S resources. Owing to the continuous demand and execution of the VV&A work, related rules have developed significantly, but tools and techniques for performing the work have not been developed. Hence, there are inefficient parts in the performance of work due to the absence of a systematic system. Accordingly, many risks may cause various safety accidents, such as security. This paper suggests a direction for the development of VV&A work procedures by improving efficiency and reducing risk.