A Study on the Industrial Safety Health Criteria Application of Construction Accident prevention -(Steel Structure Construction standard Safety Work Guide) (건설 재해예방을 위한 산업안전보건기준 적용에 관한 연구(철골 공사 표준안전 작업지침 중심으로))

  • 장봉정;임재동;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.39-46
    • /
    • 2003
  • 산업재해의 직접적인 원인은 작업자의 불안전한 행동과 작업과정에서의 안전시설 설치미흡으로 인한 불안전한 상태로와 기술적, 교육적, 관리적 원인의 복합적인 형태로 발생되는데 그 가운데 산업안전보건법상의 건설공사 각 공종 별 기술적인 안전시설설치 기준이 건설업 종사자에게 쉽게 적용하기가 현행 법기준에는 문제점이 있으며 이러한 복잡한 법기준을 분석하여 안전사고 예방 기법에 적용하고자 제시하고자하며, 향후에 이를 바탕으로 산업안전보건법상의 안전기준을 체계적으로 분석하여 제시하고자 한다.

  • PDF

Classifications of Work Sections for Modernized Hanok (신한옥 시방서 개발을 위한 공종분류)

  • Kang, Mi-Yeon;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.121-123
    • /
    • 2013
  • Research on the "Modernized Korean traditional housing" (Hanok) has been actively studied in succeeding to Korean traditional housing and providing the public with housing that required for modernized life style. The purpose of this study is to classify work sections for Hanok specifications. This paper analyzed the concepts and characteristics of existing specifications. It was found that the absence of standard classifications is one of the causes of missing work items and mixed scopes. Also, the contents of carpentry works have low level of details. Therefore, Hanok specifications, in this study, are required to have upper level standards and to encompass traditional and new construction methods. Further research will develop standard classifications, standard codes, and automated systems of Hanok specifications for improving quality and effectiveness.

  • PDF

The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.

A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance (도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구)

  • Jung, Dae-Kwon;Tae, Yong-Ho;Ahn, Bang-Ryul;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.85-94
    • /
    • 2009
  • In cost estimation of construction, several methods including quantity-per-unit costing, job costing, unit cost estimation and lumpsum estimation are being utilized in Korea. Among them, a Quantity-per-unit Costing Method is used as a standard of cost estimation in public and private works. This paper presents the realistic job-costing method on all road construction tasks through statistical analyses with field survey data to solve the problems induced by the existing quantity-per-unit costing method. Furthermore, it was found that the newly developed job costing method is able to produce a simple costing procedure and a more actual construction cost estimation by a case study, which was performed to compare particular construction costs produced by two different methods, existing quantity-per-unit costing and newly developed job costing. These methods is compared by Case-study about sub-base. In the case of Job costing method, the estimate is shorter than the other case about 50% and can make up for the weak point about instrument in the current Standard of cost estimation. And it can be depict by Job Costing method about progress of work for using by a plan about construction management.

  • PDF

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.219-224
    • /
    • 2007
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan(2004${\sim}$2006) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, l,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

  • PDF

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

A Study on Vulnerability Function of Residential Building Using Expert Opinion (전문가의견을 활용한 주거건물 손상함수 개발)

  • Kim, Gilho;Choi, Cheonkyu;Hong, Seungjin;Kim, Kyungtak
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.339-339
    • /
    • 2017
  • 손상함수란 건물, 차량, 농작물 등과 같은 피해대상물에 재난강도에 따른 취약도(vulnerability)를 정량화한 함수로, 재난리스크 모델에서 널리 사용되는 개념이다. 홍수재난에서 손상함수는 일반적으로 피해지역에서 조사된 경험적 피해자료(empirical data)를 활용하거나, 표준화된 피해대상물에 대한 손상성을 전문가의 의견(expert opinion)을 참고하여 개발된다. 이때, 취약도를 설명하는 설명변수는 일반적으로 침수심(inundation depth)이 사용되며, 그에 따른 취약도는 손상률(percent damage)로서 상대함수 형태가 일반적이다. 본 연구는 주거건물(residential building)에 대한 손상함수 개발을 위해 자연재난 손해사정 경력자(8인)를 대상으로 표준화된 주거건물(단독주택, 아파트, 연립/다세대주택)에 대해 침수에 따른 건물 손상성을 조사하였다. 주거건물 손상성을 설명하는 최대범위는 건물내부 바닥고를 기준으로 침수심 3m까지이며, 침수심 변화에 따른 손상성을 건물신축 공종에 따라 질의하고 이를 종합하였다. 조사과정은 (1) 표준건물에 대한 정의, (2) 공종별 침수에 따른 손상여부 질의, (3) 공종별 최대 손상률 평가 및 주요 피해내역 토의, (4) 공종별 침수심에 따른 손상률 평가, (5) 결과종합의 단계로 진행되었고, 이를 통해 주거건물 유형에 따른 손상함수를 개발할 수 있었다. 본 연구에서 개발된 손상함수는 다양한 침수높이에서 주거건물에 대한 취약도를 설명하는 데 장점이 있으나, 그 결과는 향후 홍수피해지역을 대상으로 수집된 다양한 피해조사 결과와 비교하여 보완될 필요가 있다.

  • PDF

A Study on the Process management Methodology of Spatial Database Standard Construction (공간데이터 표준구축공정의 관리방법론 연구)

  • Choi, Byoung-Gil;No, Young-Woo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.3
    • /
    • pp.331-345
    • /
    • 2009
  • This study aims to standardize the work classification system in spatial data. Up to now, a systematic standard for constructing process and quality management has not yet been established in Korea, thus, it is possible for the national budget to be wasted. The regulations related to constructing spatial data are also obscure, and absurd for feasible application to reality, which results in a lack of reliability of the quality of spatial data. This study was conducted by investigating and analyzing regulations related to spatial data quality and various literature, including studies on spatial data quality conducted by the NGII. And also, the study was conducted by investigating and analyzing the constructing processes and working methods of major firms that have experience in constructing a GIS for a local governing body. Based on the analyzed data, we standardized work classification and management methodology for control point surveying using GPS, leveling, aerial photographing, digital mapping, topographic mapping, digital elevation modeling, aerial photographic DB construction, digital orthophotomap.

A Method for the Effective Implementation of a Consignment Contract in Road Constructions (도로 수탁공사의 효과적 수행을 위한 방법론)

  • Bak, Gwon-June;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.153-161
    • /
    • 2010
  • The city planning of a local government is a continuous process that does not end with the creation of a plan but proceeds through decision-making, monitoring and evaluation phases. As a new city planning is changed and confirmed, there is a chance to construct a large scale road that is connected with an under constructed road. In this case, the expansion of the width and length of road, the addition of bridges or tunnels, and the change of the size and location of interchanges lead to many changes on road design and construction. In the past, the consignment contracts for a road construction have been made in limited numbers and for limited civil works. Now, it is growing in numbers and is making for large scale multi-works. However, the standard process and guidelines for the consignment contracts have not been suggested yet, so there is difficulty in performing the consigned road construction effectively. In this paper, the important factors for the consignment contracts are determined by construction document reviews and expert interviews. Based on these results, a standard process for the consigned contracts and a guideline for agreeing on construction cost are suggested. The costs that should be paid by a consignor are also defined.