In this article, I have summarized and reviewed the concepts and terms surrounding the stamped construction technique, focusing on earthen walls in the Three Kingdoms period. This is because confusion is caused by defining the nature of the earthen walls by using various concepts and terms for each researcher regarding the substance and construction method of the earthen walls. The stamped earth method is a representative ancient civil engineering or construction technique in which a frame is made of plates to form a fortress wall, a fence, and the base of a building, and then soil or sand is poured into it layer by layer and then stamped with a bat to make it solid. Therefore, in order to prove that the earthen wall was built by the stamped earth method, evidence such as a narrow plate, a column for fixing it, long horizontal and vertical wood pieces to support the narrow plate, and traces of pounding the soil must be detected. However, in Korea, there are very few cases where such evidence has been fully excavated, so it is necessary to agree on how strictly the standards for the stamped earth method will be applied. The terms related to the stamped technique mobilized for the construction of the earthen walls were explained with actual examples by dividing the terms related to the concept into terms related to the principle and unit of the stamped plate, and the specific stamped technology. In particular, in Pungnabtoseong Earthen wall, a variety of typical and diverse methods of building the ancient stamped earthen wall were identified so that decisive data could be secured to understand the principles and techniques of the stamped earthen wall. In the future, a more general understanding of the stamped technique will be possible only when more evidence related to it is found in relics other than Pungnabtoseong Earthen wall.
This study investigated about the Panchuk Earth Wall that is the Hardened-Heaped Earth Wall, which was surveyed in the South Korea area. The Panchuk Earth Wall was classified into the 2 types depending on the existence and nonexistence of Seok-yeol(石列), t
This paper examined the construction techniques of the earthen fortifications in the Hanseong Period of Baekje Kingdom, which has been researched most frequently among the Three Kingdoms. The construction processes of the Earthen Fortifications were reviewed and dividing into 'selection of location and construction of the base', 'construction of the wall', and 'finish, extension and repair'. The results show that various techniques were mobilized for building these earthen fortifications. Techniques which were adequate for the topography were utilized for reinforcing the base, and several other techniques were used for constructing the wall. In particular, techniques for wall construction may be clearly divided into those of the fill(盛土) and panchuk(版築) techniques. The fill method has been assumed since the 2000s to have been more efficient than the panchuk technique. This method never uses the structure of the panchuk technique and is characterized by a complex soil layer line, an alternate fill, use of 'earth mound(土堤)'/'clay clod(土塊)', and junctions of oval fill units. The fill method allows us to understand active technological sharing and application among the embankment structures in the period of the Three Kingdoms. The panchuk technique is used to construct a wall using a stamped earthen structure. This technique is divided into types B1 and B2 according to the height, scale, and extension method of the structure. Type B1 precedes B2, which was introduced in the late Hanseong Period. Staring with the Pungnap Earthen Fortification in Seoul, the panchuk technique seems to have spread throughout South Korea. The techniques of the fill and panchuk techniques coexisted at the time when they appeared, but panchuk earthen fortifications gradually dominated. Both techniques have completely different methods for the soil layers, and they have opposite orders of construction. Accordingly, it is assumed that both have different technical systems. The construction techniques of the earthen fortifications began from the Hanseong Period of Baekje Kingdom and were handed down and developed until the Woongjin-Sabi Periods. In the process, it seems that there existed active interactions with other nations. Recently, since studies of the earthen fortifications have been increasing mainly in the southern areas, it is expected that comparative analysis with neighboring countries will be done intensively.
The stamped earth method is a typical ancient engineering technique which consists of in-filling wooden frame with layers of stamped earth or sand. This method has been universally used to construct earthen walls and buildings, etc. The purpose of this article is to understand the construction method and principles of the stamped earthen wall through analysis of various construction techniques of Pungnaptoseong Fortress(Earthen Fortification in Pungnap-dong). First of all, the ground was leveled and the foundations for the construction of the earthen wall were laid. The underground foundation of the earthen walls was usually constructed by digging into the ground and then in-filling this space with layers of mud clay. Occasionally wooden posts or paving stones which may have been used to reinforce the soft ground were driven in. The method of adding layers of stamped earth at an oblique angle to either side of a central wall is the most characteristic feature of Pungnaptoseong Fortress. Even though the traces of fixing posts, boards, and the hardening of earth - all signatures of the stamped earth technique - have not been identified, evidence of a wooden frame has been found. It has also been observed that this section was constructed by including layers of mud clay and organic remains such as leaves and twigs in order to strengthen the adhesiveness of the structures. The outer part of the central wall was constructed by the anti-slope stamped earth technique to protect central wall. In addition a final layer of paved stones was added to the upper part of the wall. These stone layers and the stone wall were constructed in order to prevent the loss of the earthen wall and to discharge and drain water. Meanwhile, the technique of cementing with fire was used to control damp and remove water in stamped earth. It can not be said at present that the stamped earth method has been confirmed as the typical construction method of Korean ancient earthen walls. If we make a comparative study of the evidence of the stamped earth technique at Pungnaptoseong Fortress with other archeological sites, progress will be made in the investigation of the construction method and principles of stamped earthen wall.
The Mireuksaji stone pagoda is constructed Baekje Period in the 7th century which is located in Iksan, Korea. This stone pagoda designated by National Treasure No. 11 is the only remaining pagoda. This pagoda has lost the original form in part and the whole stonework wase dismantled. Work for the restoration is currently in progress. This study was divided into soil strata such as construct layer of the temple site, foundation layer of the pagoda basement, and construct layer of the stylobate by stratum to interpretation the skill of rammed earth and making techniques. The of physical, mineralogical and geochemical characteristics of soil samples were identified. Five pieces of soil in and around the Mireuksaji temple site was selected for the comparative study to interpretate the mutual homogeneity among soil stratum. As a result, artificial addition has not been identified in all soil samples using rammed earth. The soils used for the basement of the stone pagoda (construct layer of the temple site, foundation layer of the pagoda basement, construct layer of the stylobate) were confirmed to be the same origin as soil in and around Mireuksaji temple site. Thus these results indicate that the basement of the pagoda was constructed using soils in and around the Mireuksaji temple site without work as careful selection.
After excavation work of relics, historical site which has historically meaningful, are preserved using the various methods. There are three method in the relocation methods that are original relocation method, the remaining structure-peel method, and soil peel method. The original relocation method is restored after relocating in historical site such as residential site, iron foundry site, kiln site, old mound. The remaining structure-peel method are restored only the feature of exposed remaining structure using polymeric resin, when it is difficult to relocate the entire remaining structure. And soil-peel method is exhibited after peeling in case when soil layers such as grave of old mound, foundation of building site, sedimentary deposit layer, shell heap, and etc. Soil-peel method becomes important historical data of changes according to environment at that time, that is, flooding by storm, traces of fire and living features of that time such as heaps of shells discarded after eating shellfish and living wastes. In particular, in case of soil layer for preparing foundation sites of building by compacting in turn soils with different components such as clay soil, rough sand soil and etc, it becomes important data which can judge foundation technology of that time. It can be said to be an important data preservation method for utilizing these historical data as historical data as well as for the purpose of education, exhibitions and public relations which can be shared not only by experts but also by general public. In this paper, we present the reliable definition of soil-peel method in various preservation methods and explain the using polymer in this method. So, we will come up with the accurate index about this method that is used the eminent analysis method for soil layer.
Chae, Joon;Park, Seok Tae;Cho, Ji Hyun;Lee, Chan Hee
Journal of Conservation Science
/
v.37
no.6
/
pp.748-766
/
2021
The Iksan Ssangneung (twin tombs), a pair of tombs comprising the Daewangneung (large royal tomb) and the Sowangneung (small royal tomb), were constructed in the typical style of stone tunnel and chamber tombs in the Baekje Kingdom during the Sabi period (538 to 660 AD) of ancient Korea. Soil layers exposed during excavation of Sowangneung in a trench east of the tomb are: the bottommost layer, the ground level layer, the Panchuk (rammed earth) layer of the Baekje, the layer created by a grave robbery, and soil recovered during the Japanese colonial period. Soil samples were obtained by segmenting an easy stratigraphic horizon into sub categorized soil layers, and their material properties were analyzed; they are composed mainly of sandy loam based on the particle size distributions. In the site foundation, loamy sand is packed in the bottommost layer, and sandy loam with high sand and silty sand fills most of the overlying layer. The central and topmost portion of the Baekje layer is composed of loam with high clay content. All soil layers show geochemical behaviors similar to those of the bottommost layer. X-ray diffraction analysis verified kaolinite in all layers, also observed in soil layers displaying high crystallinity. Kaolinite and halloysite were identified by scanning electron microscopy. Thus, we conclude that the Baekje layer of the Sowangneung is composed of sandy loam containing kaolin procured from near the site. An impermeable middle to upper layer was created using viscous loam. The top of the tomb was closed tightly.
Choi, Hee Soo;Lee, Chan Hee;Han, Seong Hee;Lee, Seong Min
Journal of Conservation Science
/
v.32
no.4
/
pp.561-570
/
2016
This research was a technical case study for the authentic restoration of the seven-storied Simgoksa stone pagoda after disassembly and reconstruction using three-dimensional image analysis. During disassembly and reconstruction, the pagoda's properties were analyzed in terms of the overall modification and displacement of the pagoda. Distortion was minimized by ensuring structural stability during the reconstruction process. Also, the original site of the pagoda was examined in order to utilize it fully during rebuilding. Before reconstruction of the pagoda, moss and lichen on the stone surfaces were removed by scientific surface cleaning. The foundation of the pagoda was reinforced with rammed earth than was similar to the original foundation using a mixture of soil and quicklime. The results are expected to provide valuable data for the reconstruction of other stone pagodas.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2004.05a
/
pp.150-152
/
2004
We have studied contrast ratio of a homogeneously aligned nematic liquid crystal (LC) display as a function of the angle between the polarizer axis and LC director. The results show that a cell configuration in which a polarizer axis facing a light source coincides with a short LC axis has a better process margin in terms of high contrast ratio than that of the cell coinciding with a long LC axis.
The examples of developing a building site after the Woongjin period are mainly found in temple sites, tile-roofed building sites of unidentified features, and palace remains including the pavilion site with the river in the front(임류각지) inside the Castle of Gongsan, Gongjoo. In case of the Hanseong period, a glimpase of the features has gained in Poongnab mud castle and Mongchon mud castle, but the excavated relics are not yet enough to make some date out of them. After the Woongjin period of Baejae, the earth-ramming development method was used mostly to construct a building site, which is divided into horizontal and slant raising of the ground level. Both are used simultaneously, but there are the significant differences in the way of raising the ground level between them. Particularly, in case of the Wanggoong-ri relics in Iksan, the ground level was raised in a narrow line slantly, which is differentiated from other slant raising of the ground level, and its time of construction also is after that of others. In addition, the board-building development method used for narrow space is usually found in the remains since the seventh century. However, there are not enough the relics of Baekjae to reveal the whole aspect of building site development. It should be studied later through the subsequent excavation and research.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.