In respect of global environment protection and efficient utilization of energy, co-generation systems, which have greatly higher efficiency than the other generations, have been developed and put to practical use. Assuming that the co-generation system would be operating in Park Hotel, this paper calculates the difference between the heat and electricity rates by the conventional method and the co-generation system, considers the cost of new investment and analyzes introduction economics based on the return on investment. The introduction is turned out to be recommendable, since the return of investment for co-gen oration equipment is about ten years when the co-generation profits in heat and electricity rate. Additionally, accounting for interest rate drop, improvement of environmental matters or electricity rate increase, it is shown to be even more economical.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.16
no.4
/
pp.92-100
/
2002
In respect of global environment protection and efficient utilization of energy, co-generation systems, which have greatly higher efficiency than the other generations, have been developed and put to practical use. Assuming that the co-generation system would be operating in H-Department of Kwang-ju city, this paper calculates the difference between the heat and electricity rates by the conventional method and the co-generation system considers the cost of new investment and analyzes introduction economics based on the return on investment. The introduction is turned out to be recommendable, since the return of investment for co-generation equipment is about five years when the co-generation profits in heat and electricity rate. Additionally, accounting for interest rate drop, improvement of environmental matters or electricity rate increase, it is shown to be even more economical.
Chun, Dong-Hyuk;Kim, Sang-Do;Rhim, Young Joon;Lee, Si Hyun
Korean Chemical Engineering Research
/
v.49
no.5
/
pp.639-643
/
2011
Fry-drying of coal slurry is one of the upgrading low rank coal processes. It consists of slurry mixing, slurry dewatering, solvent recovery and briquetting. Cost estimation and economic feasibility are examined for the upgrading low rank coal process based on capacity of 1 million ton/yr. In case that investment costs are $100,000,000, discount rate is 12%, and service life is 20 years, the results of economic analysis are enough to satisfy the evaluation criteria of investment such as IRR, B/C ratio, NPV and discounted payback period. According to sensitivity analysis, investment value are very sensitive to raw material cost and product price. Since the bituminous coal price is currently soaring, it is expected that the investment value will increase more and more.
Journal of Advanced Marine Engineering and Technology
/
v.38
no.9
/
pp.1057-1063
/
2014
Concerning $CO_2$ reduction from International Societies, lots of laboratories and relevant societies suggest many reports on how to reduce fuel consumption from their specific ways. Undoubtedly, cutting costs is the final desired destination for owner outcome, but many questions there are on the way yet: how is this measure working? how efficient is it? On what size of ship would it work best and be the most effective? etc. Fuel cost is one of the major cost elements for ship owners and/or operators. And by reducing fuel consumption owners and/or operators will reduce both their costs and the environmental impact from their ship. This paper is aim to address how the measures work for saving fuel consumption through improve propulsion efficiency, installation cost and benefit can be calculated easily in the return on investment for estimated one year operation, and finally their compatibility with other fuel saving measure devices.
Geothermal-energy has been getting popular as a natural energy source for green buildings these days. As a result Geothermal Source Heat Pump System (GSHPs) was being recognized effective alternative systems to conventional heating and cooling systems owing to their higher energy utilization efficiency. But GSHPs has not been popularized thereby the large amount of initial cost of the system and insufficiency of studies for economic estimation. Therefore GSHPs are being developed to make up for the weak points that are the large amount of initial cost of the system and much annual electricity consumption. In this paper, economic estimation was conducted by payback period method and it shows that the pay back period of Heat Storage Type GSHPs was calculated 6.8 years compared with the absorption Chiller-Heater system and 8.2 years compared with the Ice storage-Boiler system. Heat Storage Type GSHPs also has the lower annual source energy consumption than the conventional heating and cooling systems because of using nighttime electricity.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.143-148
/
2008
This study is VE LCC case analysis on two school BTL projects which is constructed by Private sector and rented to government. Then private sector payback their initial cost and profit by rental fee from government. The VE in Korea, revised by the method of the Construction Technique - Enforcement Ordinance in 2005 is applicable to construction business which size is over 10 billion won. The VE well known as a way of productivity elevation is already proven and outstanding management method In construction industry inside and outside of the courtly. As its unique personality of BTL business, VE workshop period is too short. There is a few accomplished BTL project and data base, because BTL business begun from year of 2006. So we are trying to proof effect of VE LCC through case study of school BTL projects.
투자에 비해 자본회수 기간이 길고 설비건설에 많은 자본과 장기간이 소요되는 전력산업은 미래의 전력수요 성장에 대한 정확한 예측과 합리적인 설비계획 수립을 통한 설비확충이 매우 중요하다. 우리나라는 지리적 특수성으로 인하여 독립된 형태의 전력계통으로 구성되어 있어 타 국가와 전력융통이 불가능해 자급자족을 위한 충분한 전력공급능력 확보가 필요하다. 전력수요는 서울 인천 경기도의 수도권에 43%(2005년 최대수요기준)가 집중되어 있고 발전소는 중 남부에 편재되어 있어 지역간 전력 수급불균형의 문제가 크다. 특히, 비수도권에서 유입되는 북상조류가 수도권 전력수요의 약 50%(2005년 최대수요기준)를 담당하고 있다. 또한 현재 수도권의 경우, 인천지역에 발전설비가 집중되어 있으며 이러한 인천지역 집중 현상은 수도권 발전설비 유인 정책에 따라 미래에 보다 더 가속화 될 것으로 예상되어, 또 다른 어려움을 야기 시키고 있다. 따라서 이러한 문제점에 대한 분석 및 대책을 검토하였다.
A detailed database of waste heat is built to propose energy exchange networks to recover waste energy in Pohang Steel Industrial Complex. A visualized technique is used to figure out the status of waste heat energy and to suggest potential energy exchange networks. Several energy networks are proposed in terms of temperature level, the amount of available energy, distance, and construction cost. A simple economical assessment is applied to the energy exchange networks which have higher economic potential. Their average payback period is estimated to be 2.8 years. The total amount of energy saving by constructing the proposed energy exchange networks is 4,778 TOE per year. It corresponds to 11,160 ton $CO_2$ reduction with the assumption that the recycled waste energy replaces the use of LNG in energy-demanding companies.
LNG 냉열 활용에 대한 관심은 유가의 고공행진과 더불어 고조되고 있다. 본 연구는 생산기지 내에서 LNG 냉열의 이용현황 및 활용 가능량에 대한 분석을 토대로 LNG를 사용하는 6대 냉열사업에 대한 타당성 연구를 수행하였다 하절기 생산기지 내에서 냉열의 활용 가능량은 전체 냉열량의 30%로 LNG kg당 약 60kcal 정도로 매우 적다. 또한 생산기지 내에서 천연가스 송출량이 시간대별로 크게 차이가 발생되기 때문에 실질적으로 활용 가능한 양은 이것보다 적은 것으로 나타났다. 6대 냉열사업은 공기액화분리, 냉열발전, 저온분쇄, 액화탄산 및 드라이아이스, 냉동 및 냉장창고, 지역냉방사업이고, 사업화 가능성에 대한 타당성 연구를 수행하였다. 본 결과 전체 냉열사업의 투자비 회수기간이 15년 이상 상회하는 것으로 나타났다. 현시점에서 냉열사업 자체의 외국기술 의존도 때문에 막대한 초기투자비가 필요하고, 생산품의 부가가치가 낮으며 기존 시장에서 경쟁력을 확보하기가 어려운 것으로 평가되었다.
Water usage for cleaning the toilet bowl accounts for 27% of the total water usage. Water-saving valve that can select the amount of water for cleaning toilet bowl can be reduced expenditure. After installing water-saving valve, analysed the economic effects. Water-saving valves compared with flush valves, and researched the amount of water usage. Then analyzed fort he economic effects. Water-saving valve was used 5.6 ${\ell}/time$ for cleaning toilet bowl. In contrast, flush valve was consumed 8.4 ${\ell}/time$. Water-saving valve's water-saving rate was 33.3%. The initial payback period for Water-saving valve was 459.5 days. By a small investment in water saving valve, the economic benefits can be obtained.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.