• Title/Summary/Keyword: 통기수갱

Search Result 4, Processing Time 0.019 seconds

A Study on the Ventilation Effects of the Shaft Development at a Local Limestone Mine (국내 석회석 광산 수갱 굴착에 의한 통기효과 분석 연구)

  • Lee, Changwoo;Nguyen, Van Duc;Kubuya, Kiro Rocky;Kim, Chang O
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.609-619
    • /
    • 2018
  • This study was carried out at a local limestone mine to analyze the ventilation efficiency of the shaft equipped with a main fan. The results show that its ventilation efficiency is clearly verified for the natural as well as the mechanical ventilation. The airflow rate of $11.7m^3/s$ was induced by the natural ventilation force and the maximum quantity is almost same as the airflow rate estimated by monitoring the average temperatures in the upcast and downcast air columns. Meanwhile, the airflow rate exhausted by the main fan through the shaft was $20.3{\sim}24.8m^3/s$; variation of the quantity was caused by the upward shift of the mine ventilation characteristic curve due to the frequent movement of the equipment. This indicates efforts are required to reduce the ventilation resistance and raise the quantity supplied by the main fan. The turbulent diffusion coefficients along the 1912 m long airway from the portal to the shaft bottom was estimated to be $15m^2/s$ and $18m^2/s$. Since these higher coefficients imply that contaminants will be dispersed at a faster velocity than the airflow, prompt exhaust method should be planned for the effective air quality control. The ventilation shaft and main fan are definitely what local limestone mines inevitably need for better working environment and sustainable development.

ON THE TECHNICAL PROBLEM IN THE SHAFT WORKS(IV) (수갱공사의 기술적 문제에 대해서(IV))

  • 이융직
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1994.03a
    • /
    • pp.89-101
    • /
    • 1994
  • 기 발표된 보문에서, 정수두압이 작용하는 수갱측벽의 두께 산정과 수갱굴하의 특성을 간략하게 설명하였다. 이 두 부문에 대해서는 계속 다루어 나갈 예정이며, 본 회부터는 수갱굴하의 원론적인 문제도 다루기도 한다. 광산이나 탄광의 수갱은, 심부에 부존하는 광체 또는 탄층에서 채굴된 광물과, 갱도굴진에서 나온 버럭을 권양하고, 작업인원, 제반 자재, 압기동력원이 되는 전기, 급수 등을 공급하여 안전한 갱내작업을 유지하기 위한 통기회로를 형성시키고, 또한 갱내수를 배출하는 다목적의 대동맥과 같은 역할을 하는, 말하자면 광산의 가장 핵심체이다. (중략)

  • PDF

Numerical Analysis on Effect of Stemming Condition in Mine Ventilation Shaft Blasting (광산 통기수갱발파에서 전색조건이 발파효율에 미치는 영향에 관한 수치해석적 연구)

  • Kim, Jun-ha;Kim, Jung-gyu;Jung, Seung-won;Ko, Young-hun;Baluch, Khaqan;Kim, Jong-gwan
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.15-23
    • /
    • 2021
  • Ventilation shafts are pathways in mines and tunnels for the removal of dust or smoke during underground space construction and operation. In mines, blasting with long blast holes is preferred for the excavation of a ventilation shaft in the 10~20m long crown pillar section. In this case, the bottom part of the blast hole is completely drilled in order to determine the drilling error, and this causes a problem of lowering the explosive charge and blasting efficiency. It is possible to solve the problem of explosive loading and to increase the blast efficiency by covering the curb of the blasthole by using stemming material. In this study, simulations for the blasting of a ventilation shaft were performed with various stemming lengths and the blasthole diameters(45, 76mm) using AUTODYN 2D SPH(Smooth particle hydrodynamics) analysis technique. Also the optimal bottom stemming column was derived by checking the size of the boulder and burden line according to blasting. Analysis result, blasting efficiency is lessened in case of stemming length less than 30cm and the optimal length of the stemming material should be 30cm or higher to achieve high efficiency of blasting.

A Study on Mine Ventilation Network (광산 통기 네트워크 연구)

  • Kim, Soo Hong;Kim, Yun Kwang;Kim, Sun Myung;Jang, Yun Ho
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.217-229
    • /
    • 2017
  • This study focuses on the improvement of the working environment in domestic collieries where temperature is increasing due to heat of the earth that is caused by the long-term mining. In order to improve the working environment of the mine, a ventilation evaluation was carried out for Hwasoon Mining Industry. In order to increase the ventilation efficiency of the mine, numerical analysis of the effect on temperature was carried out by using climsim, a temperature prediction program. The analysis shows that A coal mine needs $6,152m^3/min$ for in-flow ventilation rate but the total input air flowrate is $4,710m^3/min$, $1,442m^3/min$ of in-flow ventilation rate shortage. The 93 m hypothetical ventilation shaft from -395 ML to -488 ML could result about $3^{\circ}C$ temperature drop in the coal mine of -488 ML far. As a result of predicting the $CO_2$ concentration at -523 ML development using artificial neural network, the emission of $CO_2$ increased as the amount of coal and coal bed thickness increased. The factors that have the greatest effect on the amount of $CO_2$ emissions were coal layer thickness and coal mining. And, as the air quantity increases, it has a great effect on the decrease of carbon dioxide concentration.