• Title/Summary/Keyword: 토목.환경

Search Result 2,901, Processing Time 0.027 seconds

Sediment Discharge and Invasion of Plants on the Slope of the Forest Roads(II) - Invasion of Trees on the Banking Slope - (임도사면(林道斜面)의 토사유출(土砂流出)과 식생침입(植生侵入)에 관한 연구(硏究)(II) - 성토사면(盛土斜面)의 목본식물침입(木本植物侵入)을 중심(中心)으로 -)

  • Chun, Kun Woo;Oh, Jae Man
    • Journal of Korean Society of Forest Science
    • /
    • v.82 no.4
    • /
    • pp.354-365
    • /
    • 1993
  • The purpose of this investigation is to point out the physical fixation and stability of banking slopes of forest roads by invasion of trees. We investigated the situations of sediment discharge and coverage of invaded trees at banking slopes of forest roads. The coverage of invaded trees were calculated from crown injection based on the stable slope and was compared with length of slope, slope gradient, and passage years after construction of forest road. 1. We investigated on the sediment discharge and the invasion of trees at banking slopes, which were actually observed 8 forest roads of Kyonggi-Do and Kangwon-Do. 2. There was no physical stability of the banking slope due to the surface erosion and slope failure, but the tree invasions were active at the stable plots. 3. The length of slope was constructed to 4.0m to 61.0m and recent forest road was mainly constructed to the slopes longer than 30m. There was strong regional effect between the length of slope and the coverage of invaded trees and the above two factors were inversely proportional to each other. 4. There was no significant relationship between the slope gradient and the coverage of invaded trees and the slope constructed within the angle of repose showed the relatively high coverage of invaded trees. 5. There was no significant relationship between the passage years and the coverage of invaded trees in the same investigative region after the construction of forest road. But there was a gradually increasing relationship of tree invasion between above two factors. However, there was some limitation to expect the invasion of the tree species. 6. In the light of the above results, we suggest that the construction of forest road may need foundation work and vegetation work simultaneously for the physical stability to make the environment of tree plantation and that the reasonable increase of construction cost of forest road may be prior to the other factors.

  • PDF

Geo-surface Environmental Changes and Reclaimed Amount Prediction Using Remote Sensing and Geographic Information System in the Siwha Area (원격탐사와 지리정보시스템을 이용한 시화지구 일대의 지표환경변화와 토공량 예측연구)

  • Yang, So-Yeon;Song, Moo-Young;Hwang, Jeong
    • The Journal of Engineering Geology
    • /
    • v.9 no.2
    • /
    • pp.161-176
    • /
    • 1999
  • The objectives of this study are to analyze the changes of geo-surface topography in the Siwha embankment and the Ahsan city area by the image processing of Landsat Thematic Mapper data, and to estimate the reclaimed amount of the exposed tidal flat in the Siwha area using the GIS. False color composite, Tasseled cap, NVDI(normalized difference vegetation index), and supervised classification techniques were used to analyze the distribution of sediments and the aspect of topographical variations caused by artificial human actions. The total amount of the exposed tidal flat was estimated on the basis of the database snch as aerial photography, hydrographic chart, geological map, and scheme drawing in the Siwha area. The possible excavation regions for a seawall were predicted analyzing the supervised classification image of Landsat TM data. Tasseled cap images were used to observe the distribution of sediments. The difference of the NDVI images between spring and summer seasons indicates that deciduous and coniferous forests were distributed over the whole areas. The total fill-volume of the exposed Siwha tidal flat and the fill-volume of the construction planning seawall were calculated as $581,485,354\textrm{m}^3{\;}and{\;}3,387,360\textrm{m}^3$, respectively, from the digital terrain analysis. Daebu Island, Sunkam Island, and the part of Songsan-myeon were chosen as the cut area to make the seawall, and their cut-volumes were estimated as $5,229,576\textrm{m}^3,{\;}79,227,072\textrm{m}^3,{\;}and{\;}47,026,008\textrm{m}^3$, respectively. Therefore, the cut-volume of Daebu Island alone among three areas was sufficient to make the seawall.

  • PDF

Optimal Designs of Urban Watershed Boundary and Sewer Networks to Reduce Peak Outflows (첨두유출량 저감을 위한 도시유역 경계 및 우수관망 최적 설계)

  • Lee, Jung-Ho;Jun, Hwan-Don;Kim, Joong-Hoon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.2
    • /
    • pp.157-161
    • /
    • 2011
  • Although many researches have been carried out concerning the watershed division in natural areas, it has not been researched for the urban watershed division. If the boundary between two urban areas is indistinct because no natural distinction or no administrative division is between the areas, the boundary between the urban areas that have the different outlets (multi-outlet urban watershed) is determined by only designer of sewer system. The suggested urban watershed division model (UWDM) determines the watershed boundary to reduce simultaneously the peak outflows at the outlets of each watershed. Then, the UWDM determines the sewer network to reduce the peak outflow at outlet by determining the pipe connecting directions between the manholes that have the multi-possible pipe connecting directions. In the UWDM, because the modification of the sewer network changes the superposition effect of the runoff hydrographs in sewer pipes, the optimal sewer layout can reduce the peak outflow at outlet, as much as the superposition effects of the hydrographs are reduced. Therefore, the UWDM can optimize the watershed distinction in multi-outlet urban watershed by determining the connecting directions of the boundary-manholes using the genetic algorithm. The suggested model was applied to a multi-outlet urban watershed of 50.3ha, Seoul, Korea, and the watershed division of this model, the peak outflows at two outlets were decreased by approximately 15% for the design rainfall.

Development of Rainfall-runoff Analysis Algorithm on Road Surface (도로 표면 강우 유출 해석 알고리즘 개발)

  • Jo, Jun Beom;Kim, Jung Soo;Kwak, Chang Jae
    • Ecology and Resilient Infrastructure
    • /
    • v.8 no.4
    • /
    • pp.223-232
    • /
    • 2021
  • In general, stormwater flows to the road surface, especially in urban areas, and it is discharged through the drainage grate inlets on roads. The appropriate evaluation of the road drainage capacity is essential not only in the design of roads and inlets but also in the design of sewer systems. However, the method of road surface flow analysis that reflects the topographical and hydraulic conditions might not be fully developed. Therefore, the enhanced method of road surface flow analysis should be presented by investigating the existing analysis method such as the flow analysis module (uniform; varied) and the flow travel time (critical; fixed). In this study, the algorithm based on varied and uniform flow analysis was developed to analyze the flow pattern of road surface. The numerical analysis applied the uniform and varied flow analysis module and travel time as parameters were conducted to estimate the characteristics of rainfall-runoff in various road conditions using the developed algorithm. The width of the road (two-lane (6 m)) and the slope of the road (longitudinal slope of road 1 - 10%, transverse slope of road 2%, and transverse slope of gutter 2 - 10%) was considered. In addition, the flow of the road surface is collected from the gutter along the road slope and drained through the gutter in the downstream part, and the width of the gutter was selected to be 0.5 m. The simulation results were revealed that the runoff characteristics were affected by the road slope conditions, and it was found that the varied flow analysis module adequately reflected the gutter flow which is changed along the downstream caused by collecting of road surface flow at the gutter. The varied flow analysis module simulated 11.80% longer flow travel time on average (max. 23.66%) and 4.73% larger total road surface discharge on average (max. 9.50%) than the uniform flow analysis module. In order to accurately estimate the amount of runoff from the road, it was appropriate to perform flow analysis by applying the critical duration and the varied flow analysis module. The developed algorithm was expected to be able to be used in the design of road drainage because it was accurately simulated the runoff characteristics on the road surface.

A Study on the Estimation of Compression Index in the East-Southern Coast Clay of Korea (동남해안 점토의 압축지수 추정에 관한 연구)

  • Park, Choon-Sik;Kim, Sung-Su
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.8
    • /
    • pp.43-56
    • /
    • 2019
  • This research has been conducted to suggest an estimation equation of compression index to be practically applied to the southeastern areas by finding out physical and mechanical characteristics of 229 points on the southeastern coast areas (Busan area: 78 points, Gimhae area: 103 points, Geoje area: 18 points, Changwon area: 30 points) through indoor tests and analyzing its relation to the compression index. From the results, we could not only find out correlation between natural water content, liquid limit and initial void ratio versus compression index for soft ground on each of the southeastern coast areas, but also an integrated correlation equation of the southeastern coast areas. In addition, we have performed a comparative analysis of the existing estimated equation of compression index and that found in this paper. As a result, the existing estimated equation suggested by foreign researchers has shown considerable error to be applied to the soft ground on the southeastern coast areas in Korea. The estimated equation of compression index with the water content out of the existing estimated equations has shown minimum 10.8% to maximum 48.1% of error rate, minimum 13.4% to maximum 288.5% of error rate with liquid limit or minimum 9.4% to maximum 211.4% of error rate with initial void ratio. On the other hand, error rates calculated with the estimated equations of compression index from this research have shown minimum 10.5% to maximum 13.4% with water content, minimum 11.6% to maximum 21.3 with liquid limit or minimum 7.1% to maximum 11.7% with initial void ratio, for better results than those with existing estimated equations. In addition, relation between compression index and expansion index has shown Cs = (1/5 ~ 1/12)Cc similar to the existing relation of Cs = (1/5 ~ 1/10)Cc.

A Study on the Landscape Planning and Landscape Architecture Construction Principles by the Type Outside Relics (발굴유적 외부공간의 유형별 경관계획 및 조경시공 원칙 연구)

  • Shin, Hyun-Sil
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.36 no.4
    • /
    • pp.58-69
    • /
    • 2018
  • The purpose of this study was to present specific standards for landscape planning and construction applicable to landscaping areas in various historical sites. The results are as follows: First, the types of historical sites are classified according to their preservation status and processing techniques, and the classification according to their status is divided into those that have been buried underground, such as those that have been exposed to the ground, such as buildings and structures, and those that have a reputation or a record of the sites. The classification according to the wartime processing technique was classified by such techniques as closures that isolate the site, penetration that can be seen on the site, and overlays where a separate protection facility is installed on the site. Second, the principles of landscape planning for display of historical sites are divided into the items that make up the historical site, surface treatment of the sites, tree planting, and installation of facilities. If the site is not a circular space, the area separating the space by different materials between the components is required. In the event that preservation of the historical site is required, it is deemed desirable to use the soil, and to do so, the use of grasses and shrubs is effectively considered to be effective. The introduction of plants and plants should be considered according to the nature of the space. Depending on the area and nature of the monument, the facility is required to take a cautious approach by reviewing its influence on the landscape and the additional excavation of the monument. Third, the readjustment method derived as a result of looking at the landscaping principle in the historical site space was classified as conservation of status, installation of protection facilities, burial, restoration, relocation, and reproduction. Preservation of the status quo is essential for limited landscape planning and should not affect the prototype of existing relics. The protection facility shall be installed where necessary to protect the relics, and when the soil is formed, the surface treatment shall be required to remove trees that could damage the site and prevent soil and soil oil from being lost after the site. The restoration shall establish a landscaping plan according to the circular preservation based on the clues to the circle. The transfer requires a landscaping plan to create an environment similar to the outer space of an existing site and should be able to highlight the value or location of the original site. The reenactment should have a landscaping plan to revive the landscape and atmosphere of the past for the now-defunct remains. Fourth, landscaping can simultaneously satisfy the preservation of excavation sites and the increase in exhibition effects. In order to protect the traces of the past and vitalize the site of the ruins today, specific measures are required, the creation of a park for historical sites that preserve the functions and value of the relics, and the formation of a shape of linked contents can be suggested as alternatives.

Preliminary Study on the Development of a Platform for the Selection of Optimal Beach Stabilization Measures against the Beach Erosion - Centering on the Yearly Sediment Budget of Mang-Bang Beach (해역별 최적 해빈 안정화 공법 선정 Platform 개발을 위한 기초연구-맹방해변 이송모드별 년 표사수지를 중심으로)

  • Cho, Yong Jun;Kim, In Ho
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.31 no.1
    • /
    • pp.28-39
    • /
    • 2019
  • In the design process of counter measures against the beach erosion, information like the main sediment transport mode and yearly net amount of longshore and cross shore transport is of great engineering value. In this rationale, we numerically analyzed the yearly sediment budget of the Mang-Bang beach which is suffering from erosion problem. For the case of cross sediment transport, Bailard's model (1981) having its roots on the Bagnold's energy model (1963) is utilized. In doing so, longshore sediment transport rate is estimated based on the assumption that longshore transport rate is determined by the available wave energy influx toward the beach. Velocity moments required for the application of Bailard's model (1981) is deduced from numerical simulation of the nonlinear shoaling process over the Mang-Bang beach of the 71 wave conditions carefully chosen from the wave records. As a wave driver, we used the consistent frequency Boussinesq Eq. by Frelich and Guza (1984). Numerical results show that contrary to the Bailard's study (1981), Irribaren NO. has non negligible influence on the velocity moments. We also proceeds to numerically simulate the yearly sediment budget of Mang-Bang beach. Numerical results show that for ${\beta}=41.6^{\circ}$, the mean orientation of Mang-Bang beach, north-westwardly moving longshore sediment is prevailing over the south-eastwardly moving sediment, the yearly amount of which is simulated to reach its maxima at $125,000m^3/m$. And the null pint where north-westwardly moving longshore sediment is balanced by the south-eastwardly moving longshore sediment is located at ${\beta}=47^{\circ}$. For the case of cross shore sediment, the sediment is gradually moving toward the shore from the April to mid October, whereas these trends are reversed by sporadically occurring energetic wind waves at the end of October and March. We also complete the littoral drift rose of the Mang-Bang beach, which shows that even though the shore line is temporarily retreated, and as a result, the orientation of Mang-Bang beach is larger than the orientation of null pont, south-eastwardly moving longshore sediment is prevailing. In a case that the orientation of Mang-Bang beach is smaller than the orientation of null pont, north-westwardly moving longshore sediment is prevailing. And these trend imply that the Mang-Bang beach is stable one, which has the self restoring capability once exposed to erosion.

Simplified Method for Estimation of Mean Residual Life of Rubble-mound Breakwaters (경사제의 평균 잔류수명 추정을 위한 간편법)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.34 no.2
    • /
    • pp.37-45
    • /
    • 2022
  • A simplified model using the lifetime distribution has been presented to estimate the Mean Residual Life (MRL) of rubble-mound breakwaters, which is not like a stochastic process model based on time-dependent history data to the cumulative damage progress of rubble-mound breakwaters. The parameters involved in the lifetime distribution can be easily estimated by using the upper and lower limits of lifetime and their likelihood that made a judgement by several experts taking account of the initial design lifetime, the past sequences of loads, and others. The simplified model presented in this paper has been applied to the rubble-mound breakwater with TTP armor layer. Wiener Process (WP)-based stochastic model also has been applied together with Monte-Carlo Simulation (MCS) technique to the breakwater of the same condition having time-dependent cumulative damage to TTP armor layer. From the comparison of lifetime distribution obtained from each models including Mean Time To Failure (MTTF), it has found that the lifetime distributions of rubble-mound breakwater can be very satisfactorily fitted by log-normal distribution for all types of cumulative damage progresses, such as exponential, linear, and logarithmic deterioration which are feasible in the real situations. Finally, the MRL of rubble-mound breakwaters estimated by the simplified model presented in this paper have been compared with those by WP stochastic process. It can be shown that results of the presented simplified model have been identical with those of WP stochastic process until any ages in the range of MTT F regardless of the deterioration types. However, a little of differences have been seen at the ages in the neighborhood of MTTF, specially, for the linear and logarithmic deterioration of cumulative damages. For the accurate estimation of MRL of harbor structures, it may be desirable that the stochastic processes should be used to consider properly time-dependent uncertainties of damage deterioration. Nevertheless, the simplified model presented in this paper can be useful in the building of the MRL-based preventive maintenance planning for several kinds of harbor structures, because of which is not needed time-dependent history data about the damage deterioration of structures as mentioned above.

Reliability Analysis on Stability of Armor Units for Foundation Mound of Composite Breakwaters (혼성제 기초 마운드의 피복재 안정성에 대한 신뢰성 해석)

  • Cheol-Eung Lee
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.35 no.2
    • /
    • pp.23-32
    • /
    • 2023
  • Probabilistic and deterministic analyses are implemented for the armor units of rubble foundation mound of composite breakwaters which is needed to protect the upright section against the scour of foundation mounds. By a little modification and incorporation of the previous empirical formulas that has commonly been applied to design the armor units of foundation mound, a new type formula of stability number has been suggested which is capable of taking into account slopes of foundation mounds, damage ratios of armor units, and incident wave numbers. The new proposed formula becomes mathematically identical with the previous empirical formula under the same conditions used in the developing process. Deterministic design have first been carried out to evaluate the minimum weights of armor units for several conditions associated with a typical section of composite breakwater. When the slopes of foundation mound become steepening and the incident wave numbers are increasing, the bigger armor units more than those from the previous empirical formula should be required. The opposite trends however are shown if the damage ratios is much more allowed. Meanwhile, the reliability analysis, which is one of probabilistic models, has been performed in order to quantitatively verify how the armor unit resulted from the deterministic design is stable. It has been confirmed that 1.2% of annual encounter probability of failure has been evaluated under the condition of 1% damage ratio of armor units for the design wave of 50 years return period. By additionally calculating the influence factors of the related random variables on the failure probability due to those uncertainties, it has been found that Hudson's stability coefficient, significant wave height, and water depth above foundation mound have sequentially been given the impacts on failure regardless of the incident wave angles. Finally, sensitivity analysis has been interpreted with respect to the variations of random variables which are implicitly involved in the formula of stability number for armor units of foundation mound. Then, the probability of failure have been rapidly decreased as the water depth above foundation mound are deepening. However, it has been shown that the probability of failure have been increased according as the berm width of foundation mound are widening and wave periods become shortening.

Use reservoir stoage data for improvement of hydrological observation (수문관측에서 저수량 자료 활용하다)

  • Jaekyoung Noh;Jaenam Lee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.67-67
    • /
    • 2023
  • 수문관측의 핵심은 강우-유출 관계다. 하천유량 생산을 위해 수많은 지점에서 유량측정을 수행한다. 그러나 유량자료의 신뢰도는 높지 않다. 그리고 댐 유입량 산정에 아무 도움이 되지 않고 있다. 더구나 저수지의 경우는 유입량 자료도 없이 운영되고 있다. 저수지, 댐에 물이 고여 있는데 이를 활용하면 유입량을 계산할 수 있고, 그 지점에서 유량이 얼마인지 고품질로 생산할 수 있다. 여기서는 총저수량 260만m3, 유역면적 3.7km2인 감포댐에 적용하여 저수량 자료를 활용하여 유입량의 신뢰도를 얼마나 개선시킬 수 있는지 분석한 결과는 다음과 같다. 여기서 적용 기간은2020.9.1.~9.14., 2022.9.5.~9.6 등 2개 사상이고, ONE 모형에 의해 10분 단위로 유출량을 모의했다. 모의 방법은 총유량을 같게 하는 방법과 저수위 오차를 최소로 하는 방법 등 두 가지로 했다. 첫째, 2020.9.1.~9.14. 사상은 강우량은 10분 최대 19.0mm, 총 127.0mm였다. 총유량을 같게 하는 경우 유입량은 10분 최대 5.4m3/s, 총 40만m3로 모의돼, 유출률 85.5%로 나타났고, 관측은 10분최대 4.7m3/s, 총 40만m3, 유출률 85.3%로 나타났다. 유량 신뢰도는 RMSE 0.491mm, NSE 0.237, R2는 0.455로 나타났다. 이 경우 저수위 모의 신뢰도는 RMSE 0.600m, NSE 0.158, R2는 0.893로나타났다. 저수량 오차를 최소로 한 경우 유입량은 10분 최대 4.0m3/s, 총 28만m3로 모의돼, 유출률 59.4%로 나타났고, 관측은 10분 최대 4.0m3/s, 총 28만m3, 유출률 85.3%로 나타났다. 유량 신뢰도는 RMSE 0.425mm, NSE 0.430, R2는 0.507로 나타났다. 이 경우 저수위 모의 신뢰도는 RMSE 0.110m, NSE 0.972, R2는 0.995로 높았다. 둘째, 2022.9.5.~9.6. 사상은 강우량은 10분 최대 32.3mm, 총 196.0mm였다. 총유량을 같게 하는 경우 유입량은 10분 최대 64.5m3/s, 총 59만m3로 모의돼, 유출률 81.6%로 나타났고, 관측은 10분 최대 80.1m3/s, 총 59만m3, 유출률 81.6%로 나타났다. 유량 신뢰도는 RMSE 1.832mm, NSE 0.960, R2는 0.984로 나타났다. 이 경우 저수위 모의 신뢰도는 RMSE 0.323m, NSE 0.968, R2는 0.999로나타났다. 저수량 오차를 최소로 한 경우 유입량은 10분 최대 80.1m3/s, 총 66만m3로 모의돼, 유출률 91.6%로 나타났고, 관측은 10분 최대 80.1m3/s, 총 59만m3, 유출률 81.8%로 나타났다. 유량 신뢰도는 RMSE 2.120mm, NSE 0.947, R2는 0.949로 나타났다. 이 경우 저수위 모의 신뢰도는 RMSE 0.153m, NSE 0.993, R2는 0.997로 높았다. 종합하면 저수량 오차가 최소가 되도록 하천 유출량을 모의하면 결과적으로 하천유량의 신뢰도를 향상시키는 것이라 말할 수 있다.

  • PDF