Cause Analysis of Cost Overruns in International Infrastructure Project Conducted by Korean Contractors (해외토목 원도급사업의 원가상승 원인에 관한 연구)

  • Jung, Wooyong;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.105-116
    • /
    • 2017
  • In recent years, large Korean construction companies have suffered serious losses in their overseas business. Many practitioners and researchers have analyzed causes of cost overrun in these projects. However, these arguments have not been empirically verified based on acutal project cases. This study investigated cost overrun rate, contingency, allowance, predicted risk before bidding, and actual and residual risk after award in the 67 international infrastructure projects conducted by 13 large construction companies. The causes of cost overruns are derived as follows. First, they identified the possibility of cost overrun to some extent before the bidding, but did not reflect the enough risk money to bid price. In particular, this behavior was more severe in badly cost-overrun projects. Second, the causes of cost overrun were more influenced by external environmental risk than internal capability risk. However, the internal risk in badly cost-overrun projects was relatively high compared to cost-underrun projects. Third, badly cost-overrun projects failed to mitigate risk. However, cost underrun projects were affected more by low exterior risk conditions than by well mitigated risk. This study provides more informed knowledge in controlling project costs in international infrastructure projects.

Development of SVM-based Construction Project Document Classification Model to Derive Construction Risk (건설 리스크 도출을 위한 SVM 기반의 건설프로젝트 문서 분류 모델 개발)

  • Kang, Donguk;Cho, Mingeon;Cha, Gichun;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • Construction projects have risks due to various factors such as construction delays and construction accidents. Based on these construction risks, the method of calculating the construction period of the construction project is mainly made by subjective judgment that relies on supervisor experience. In addition, unreasonable shortening construction to meet construction project schedules delayed by construction delays and construction disasters causes negative consequences such as poor construction, and economic losses are caused by the absence of infrastructure due to delayed schedules. Data-based scientific approaches and statistical analysis are needed to solve the risks of such construction projects. Data collected in actual construction projects is stored in unstructured text, so to apply data-based risks, data pre-processing involves a lot of manpower and cost, so basic data through a data classification model using text mining is required. Therefore, in this study, a document-based data generation classification model for risk management was developed through a data classification model based on SVM (Support Vector Machine) by collecting construction project documents and utilizing text mining. Through quantitative analysis through future research results, it is expected that risk management will be possible by being used as efficient and objective basic data for construction project process management.

Key Performance Indicators of Building Project (건축 프로젝트의 경영성과지표 선정 연구)

  • Choi, Jae-Hwi;Sohn, Hyo-Won;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.61-72
    • /
    • 2011
  • Management performance of a construction company can be the sum of management performance of each different project. Therefore, the measurement of management performance following construction projects is essential for securing the competitiveness of a company. However, most research has been related to the performance measurement of the construction industry and companies and little has been conducted on individual project's performance. In particular, building projects have various characteristics depending on construction orderer, type and commissioning entity but no performance indicators have been selected based on this classification. This study aims to select performance indicators for subdivided areas based on project characteristics as well as those which can be commonly used to measure management performance at construction and trial run stages of building projects. In the future, those indicators proposed in this study can be used for developing methodology to evaluate them and later applied to actual building projects to generate quantitative data. In addition, they are expected to be used as reference for selecting indicators to measure management performance of plant and civil engineering projects.

Development of a Scheduling Assistant Program for Usability Improvement of Construction Scheduling Solutions (건설 공정관리 솔루션의 활용성 증대를 위한 공정표 작성 지원 프로그램 개발)

  • Park, Sung Hwan;Lee, Si Wook;Woo, Sungkwon;Shin, Do Hyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.413-421
    • /
    • 2010
  • Scheduling management is one of the most important factors for the efficient performance of construction projects. Various computer-aided solutions for schedule management have been developed, but they are not commonly used in practice. This study conducted surveys on scheduling management methods and the related solutions to identify their status and problems in practice. Based on the results of the surveys, this study also developed a scheduling assistant program to improve the usability of scheduling management solutions. Through the developed program, the usability of scheduling management solutions will be improved in practice, thus enabling efficient scheduling management.

It's beautiful' 금호건설 - 주택 건축 시장의 트렌드 리더로 '우뚝'

  • 한국주택협회
    • 주택과사람들
    • /
    • s.224
    • /
    • pp.64-67
    • /
    • 2008
  • 토지와 건축 자재를 다루며 건축 공사를 하는 건설 회사가 예뻐졌다. 집과 건물에 색과 디자인을 입히고 앞선 트렌드를 추구하면 색다른 건축물을 탄생시킨다. 바로 40년간 주택 토목 건축 등 건설 전 분야에서 풍부한 경험과 우수한 시공력을 갖춘 금호건설이다. 변화하는 주택 시장을 리드하는 금호건설의 비전과 주요 프로젝트에 대해 알아보았다.

  • PDF

Masjed-e-Soleiman Hydroelectric Power Project (이란 카룬댐 프로젝트 콘크리트 공사)

  • 김종오;노승규
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.4
    • /
    • pp.72-81
    • /
    • 2002
  • 대림산업(주)는 이란 에너지성 산하의 수전력 개발공사가 발주한 이란내 최대의 토목공사로 관심을 끌어온 카룬댐 공사(Masjed-e-Soleiman Hydroelectric Power Project)를 미화 4억6천4백만 달러에 수주하여 1994년 12월 착공한 후 6년 반 동안의 공사 끝에 지난 2001년 4월 19일 완공을 하게 되었다.(중략)

Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners (토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략)

  • Kim, Changyoon;Moon, Hyoun-Seok;Nah, Heu-Suk;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7430-7437
    • /
    • 2014
  • Owing to the increase in large and complex construction projects, the design paradigm of architecture and civil engineering projects has changed from 2D CAD to 3D CAD. For this reason, to meet the strong requirements of project contractors, various efforts have been made to adopt a Building Information Modeling (BIM) technology for effective construction management. On the other hand, compared to architectural projects, only a few civil engineering project cases have been conducted in the perspective of public contractors. This is because the characteristics of civil project contractors and the negative pursuit of adopting BIM technology due to the lack of a current BIM system and technologies. Recently, positive changes in adopting BIM technology for public projects were anticipated by public owners, such as the Public Procurement Service and the Ministry of Land, Infrastructure and Transport. In this regard, this study analyzed the current BIM technology status of public owners in Korea to adopt the BIM policies and guidelines of the Korean government. Strategies for adopting BIM technologies for Korean public owners are also discussed based on an analysis of civil engineering BIM project cases.

A Study on Countermeasures for Risk Factors Through Risk Analysis of Earthwork (흙막이공의 리스크 분석을 통한 리스크 요인별 대응 방안에 관한 연구)

  • Jeon, Byung Ju;Isah, Muritala Adebayo;Kim, Hyun Bee;Lee, Yang Gyu;Kim, Byung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.681-688
    • /
    • 2022
  • According to a recent study, most construction companies in Korea do not manage risk effectively, and it is judged that the risk management system needs to be improved. In addition, most risk-related studies deal with risks from a macroscopic perspective, and there are few studies dealing with process risks at the project construction stage. Therefore, this study tried to suggest a risk response plan through analysis and classification of risk factors that may occur in retaining work among process risks. To this end, a workshop was held for risk experts to identify and analyze risks that may occur during the construction of retaining work for apartments. As a result of the study, it was expected that savings of KRW 4.97 billion would be possible in the 95 % confidence interval, and the maximum possible cost was reduced from KRW 15 billion to about KRW 10 billion. Based on the risk reduction ratio, it was found that risks that can be reduced without any special input cost, risks with large effects in response to risks, and risks with insignificant effects were found. Therefore, using the types and risk factors presented in this study as guides, it is expected that it will be helpful in successfully operating the project if an appropriate response strategy is prepared and systematically responded to the site conditions.

A Successful Beginning for Fiber Reinforced Polymer(FRP) Composite Materials in Bridge Applications (섬유보강폴리머(FRP) 복합재료의 교량 적용)

  • 김지상
    • Magazine of the Korea Concrete Institute
    • /
    • v.13 no.5
    • /
    • pp.77-81
    • /
    • 2001
  • 부식 열화는 교량 기술자들에게 있어서 지속적인 도전을 요구하는 문제가 되어왔는데, 스텔스 항공기를 개발하게 한 새로운 재료 기술은 교량의 부식을 해결할 수 있게 하였다. 즉, 경량의 고강도 재료로 높은 피로 저항성을 갖고 있고, 부식에 강한 복합체는 교량의 재료로서 아주 바람직한 성질을 갖고 있다 섬유 보강 폴리머(FRP) 복합재료를 교량의 건설에 이용하려는 프로젝트는 1998년 현재 80 여 개가 넘게 진행되고 있는데, 이 중 미국 내에서 31개의 프로젝트가 수행되고 있다. 이 글은 미국 내에서 FRP복합체를 교량 공학 분야에 적용하려는 초기의 성공적인 시도들에 관한 내용으로 복합체의 장점, 특성, 교량 적용시 고려 사항, 그리고 향후 복합재료에 관한 기술을 토목 구조물에 적용하는데 필요한 소요 기술 등에 관하여 정리한 것이다. 이 새로운 재료는 신설 구조물의 건설과 기존 교량의 보수 및 보강에 모두 적용할 수 있으며, FRP복합체 기술을 토목 구조물과 기반 시설물 건설 분야에 적용하는 것은 지금까지 성공적인 결과를 보여 주고 있다 미국연방도로국(FHWA, Federal Highway Administration)은 이 기술을 미국 내 교통 기반 시설물인 신규 교량의 건설은 물론 기즌 교량의 보수 및 보강에 활용하는 방안에 대하여 관심을 갖고 있다.

Formal Estimation Method for Optimal Budget Appropriation of Highway Construction Projects under Long-term Continuation Contracts (장기계속계약제도 하에서 고속도로공사 최적공사비 산출방안 정립에 관한 연구)

  • Koo, Bon-Sang;Yu, Jung-Ho;Park, Jong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1405-1412
    • /
    • 2015
  • In Korea, public infrastructure projects employ "long term continuation (LTC) contracts," which require budgets to be reevaluated and re-appropriated annually throughout the multi-year life of the project. However, such contracts also make it susceptible to frequently changing government policies, in which budgets required for existing projects are allocated to new projects and thus does not provide a consistent stream of capital to multi-year projects. Each year, the KEC needs to attain government funds for construction of its multiple highway construction sites. Because it is difficult to know the amount that may be actually appropriated to KEC in a given year, it is in turn difficult to anticipate and provide sufficient funds necessary for construction to run smoothly and continuously. The lack of a good logic for appropriation has resulted in projects having a skewed distribution of capital. To get better budget appropriations from the central government, the KEC first needs a systemized approach that rationalizes the annual construction capital optimally required for its individual sites. The goal of this research was to devise a way that allows the KEC to determine and calculate the optimal construction costs that would be required for its individual construction sites on an annual basis. Both the optimal progress rate and the essential work types were assessed through a workshop with 24 professionals (KEC employees and contractors) who had extensive experience in KEC projects and also were currently working in these projects.