• Title/Summary/Keyword: 토목사업

Search Result 671, Processing Time 0.035 seconds

Analysis of Singapore's BIM tender documents for the development of infrastructure BIM guidelines in Korea (국외 BIM 발주지침 분석을 통한 국내 토목 분야 BIM 가이드라인 개발 방향 제시에 관한 연구 - 싱가폴 토목 사업 과업지시서를 중심으로-)

  • Koo, Bon-Sang;Ok, Hyun;Yu, Young-Su;Jung, Rae-Kyu
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.19-28
    • /
    • 2018
  • Recent increase in the interest and adoption of BIM for infrastructure projects has created a need for formal BIM guidelines in the civil engineering domain. Currently a BIM guideline has been developed in Korea exclusively for the road sector. However, the guideline has gaps in the specification of how BIM models should be generated, managed and applied for maximum effect in projects. This study reviewed the guidelines and tender documents of Singapore to determine potential improvements to adopt in Korea. Results showed that Korea's guideline should focus more on process integration as to stipulating BIM deliverables, encourage a common data environment, clearly distinguish between compulsory and selective BIM applications, and require data and models that can be leveraged in the operation phase of the facility.

Partnering Strategy for Bidding Success in World Bank's Vietnam Consulting Project (ODA 컨설팅 사업 낙찰을 위한 기업의 협업 전략 도출 - 세계은행의 베트남 사업을 중심으로 -)

  • Lee, Jiseop;Lee, Jeonghun;Han, Seung Heon;Kang, Sin Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.6
    • /
    • pp.1021-1028
    • /
    • 2018
  • As entering the international construction market became more difficult than the past, ODA projects can be a breakthrough for domestic engineering companies to enter the international market. However, since many companies compete for limited projects, it is necessary to reinforce the competitiveness of bidding success. The competitiveness is the result of accumulating experience, reputation, and networking through partnering. Therefore, depending on which partnering strategy has been taken over a long period, the bidding success is decided. The objective of this study is to identify the effective partnering strategy for bidding success. For this, the World Bank bid results, focusing on consulting projects in Vietnam, are collected. Using the bid results, inter-firm network representing the partnering relationship is constructed and the Social Network Analysis is conducted. After then, by conducting the Logistic Regression Analysis, effective partnering strategies are suggested. The result shows that the diversification strategy is advantageous for transportation and city development projects and the concentration strategy is advantageous for water projects. The partnering strategy for the consulting project proposed in this study will be used as a reference for the domestic engineering companies to enter the Vietnam construction market in the future.

Cause Analysis of Cost Overruns in International Infrastructure Project Conducted by Korean Contractors (해외토목 원도급사업의 원가상승 원인에 관한 연구)

  • Jung, Wooyong;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.105-116
    • /
    • 2017
  • In recent years, large Korean construction companies have suffered serious losses in their overseas business. Many practitioners and researchers have analyzed causes of cost overrun in these projects. However, these arguments have not been empirically verified based on acutal project cases. This study investigated cost overrun rate, contingency, allowance, predicted risk before bidding, and actual and residual risk after award in the 67 international infrastructure projects conducted by 13 large construction companies. The causes of cost overruns are derived as follows. First, they identified the possibility of cost overrun to some extent before the bidding, but did not reflect the enough risk money to bid price. In particular, this behavior was more severe in badly cost-overrun projects. Second, the causes of cost overrun were more influenced by external environmental risk than internal capability risk. However, the internal risk in badly cost-overrun projects was relatively high compared to cost-underrun projects. Third, badly cost-overrun projects failed to mitigate risk. However, cost underrun projects were affected more by low exterior risk conditions than by well mitigated risk. This study provides more informed knowledge in controlling project costs in international infrastructure projects.

원자력發電所의 設計와 엔지니어링

  • 신기조
    • Journal of the KSME
    • /
    • v.20 no.5
    • /
    • pp.340-352
    • /
    • 1980
  • 원자력발전소의 건설은 부존 에너지원이 한정되어 있는 한국의 현실에서 볼 때 당연히 필요하다 할 것이다. 원자력발전소 건설의 특징은 높은 건설비와 장기간의 건설기간으로 설명 될 수 있 는데 이러한 건설사업을 순조롭게 운영관리하고 고도의 기술과 지식을 활용하여 원자력발전소의 안전성을 확보하기 위해서는 필수적으로 전문용역업체인 A/E회사의 사임운영과 설계엔지니어 링에 적극 개입하도록 하여야 한다. A/E회사는 사업의 운영관리에서부터 시작하여 설계 및 엔지 니어링과 구매관리등 전분야에 걸쳐 전문기술자들을 동원하여 전력회사의 요구에 상응하게 일을 처리할 뿐 아니라 발전소 소유주인 전력회사에 부당성과 가치성을 평가하여 줌으로써 적절한 사업계획과 목표관리를 수행하도록 돕는다. 특히 원자력발전소 설계 및 엔지니어링은 광범위한 기술분야가 합쳐서 이루어지는 결정체로써 기계, 전기, 토목, 건축, 핵공학등의 관련기술자들이 사업책임자(P.M)와 기술책임자(P.E)의 통솔하에 일관성 있게 일을 수행해 나간다. 본 해설에서는 이러한 A/E의 복잡하고 다양한 설계 및 엔지니어링의 내용을 상술하였으며 현재 원자력발전소 A/E회사의 기능과 역할을 알리고 이러한 기술업무의 조속한 국산화를 위해 경주되고 있는 노 력들을 단편적으로 소개하였다.

  • PDF

Afforestation Effect Analysis Using MODIS Imagery: Yulin, Shaanxi, China As a Case Study (MODIS 영상을 이용한 중국 산시성 위린시의 조림 효과 분석)

  • Jang, Hyo-Seon;Kim, Sang-Pil;Kim, Mi-Kyeong;Sohn, Hong-Gyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.1007-1013
    • /
    • 2015
  • Desertification in China, one of the source regions of yellow dust, has been worsen by industrialization and extreme land development, which increases the damage caused by yellow dust in Korea. Because the yellow dust from China affects not only their own country, but also neighboring countries, it is becoming an international problem, and China has been started afforestation projects to prevent excessive desertification with the help of the international community. However, it is only possible for identifying the results of afforestation projects to check afforestation result reports from National Bureau of Statistics of China, which makes it difficult to check out tangible results. Therefore, this study was conducted by using remote sensing technique for monitoring afforestation status of Yulin, shaanxi, China. in which an afforestation project has been carried out steadily. MODIS imagery was used as remote sensing data and it was confirmed that vegetation has been increased through vegetation indices from 2000 to 2014 and afforestation areas were estimated as same trend of ground reference data.

Reduction Effect of CO2 Emission on BIS Using Tier 3 Methodology - A Case Study on Daejun-Chungjoo Project - (Tier 3 방법론을 활용한 BIS 사업의 CO2 저감효과 분석 - 대전-청주 간 광역BIS 사업을 중심으로 -)

  • Chung, Younshik;Song, Taijin;Kim, Jeongwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.375-381
    • /
    • 2011
  • This study presents an analysis of $CO_2$ emission reduction effect on bus information system (BIS) which is operated to improve various services of bus transit such as rapid and on-time service. Although the Intergovernmental Panel on Climate Change (IPCC) released three methodological types of models for analyzing the amount of greenhouse gas reduction, this study used the Tier 3 method that is the most concrete one. A case study was performed to a 8.3 km section of Daejun-Chungjoo BIS system, and dataset required to the Tier 3 method was obtained from ITS-based surveillance systems. The study result showed that the reduction effect of $CO_2$ on BIS operation was yearly $39.45tCO_2/km$. Therefore, such effect can be potentially useful to a measurement of effectiveness (MOE) of BIS projects hereafter.

Application of Physical River Assessment System in Naeseongcheon (내성천에 대한 물리적 하천 평가시스템 적용)

  • Jung, Hye Ryeon;Kim, Ki Heung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.563-567
    • /
    • 2015
  • 우리나라 하천관리의 패러다임은 1990년대 이후 기존의 치수 및 이수능력을 고려함과 동시에 하천환경의 보전 및 복원을 새로운 목표로 설정한 자연친화적 방식으로 변화되었다. 하천법령 및 제도적 측면에서도 수자원 장기종합계획 및 유역 종합 치수계획은 하천의 환경보전 및 다목적 이용계획을 포함하도록 규정하고 있으며, 국내 하천법에 따르면 하천기본계획 수립 또한 자연친화적 하천조성 및 이와 관련된 보전지구 지정 등을 포함하도록 규정하고 있다. 하천설계기준, 자연 친화적 하천관리에 관한 통합지침, 또는 수자원 장기종합계획에서 적용하고 있는 하천환경조사 및 평가지표는 서로 다를 뿐만 아니라 과학적인 근거가 명확하지 않는 등 국가차원의 표준화가 이루어지지 못한 상태라 할 수 있다. 1990년대 이후 미국, 독일, 영국, 호주 등 선진국들은 하천환경 복원사업의 추진과정에서 복원사업의 타당성 제고 및 성공적인 사업수행을 위하여 그들 국가의 하천특성에 적합한 하천환경 평가 체계를 구축한 바 있으며, 이들 평가체계는 새로운 과학적 지식과 기술의 축적에 힘입어 지속적으로 발전되고 있다. Fujita의 유형화(Segment 분류)법에 의하면, 하천구간(Segment)은 하상경사, 하상재료, 식생, 생태 등이 통계적으로 동질인 하천 구간으로서, 하도 특성과 하천생태계 공간을 구분하는 단위이다. 자연하천에서 동일한 경사를 갖는 하천구간은 하상재료, 소류력, 저수로 폭, 수심 등이 대체로 동일한 값을 나타내고 있으며, 하도 특성을 지배하는 주요 인자로 각 하천의 평균 연최대유량, 하상재료의 대표입경, 하상경사 등을 설정하고 있다. 본 연구에서는 하천구간을 유형화하는 기준을 하상경사로 적용하여 평가단위를 분류하였으며, 평가체계는 미국의 USEPA를 한국형 하천환경에 맞도록 수정보완 하였다. 특히 미국의 USEPA의 지표 중 하안영역의 식생피복, 하반림 등은 생물분야 식생영역과 상충되어 제외하고 우리나라 특성에 적합한 하천횡단형상, 하천횡단 구조물 등의 평가기준을 재정립하여 내성천에 평가적용 분석하였다. 하천환경의 수리 및 하도 특성 평가기준 개발에 따라 평가체계의 개념적 틀을 토대로 통합적이고 표준화된 한국형 하천평가기준 개발을 위한 방법론을 정립하고, 나아가 하천환경의 지속가능성을 전제로 한 하천복원사업의 장 단기적 성공 여부를 평가할 수 있는 실무지침의 과학적 근거를 제시하고자 한다.

  • PDF

Application of Genetic Algorithm for Railway Crew Rostering (철도 승무교번 배치를 위한 유전알고리즘 적용방안)

  • Park, Sang mi;Kim, Hyeon Seung;Kang, Leen Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.133-141
    • /
    • 2019
  • Crew rostering in railway operations is usually done by arranging a crew diagram in accordance with working standards every month. This study was done to identify the problems related to the creation of crew rosters in railway operations and to suggest an optimum crew rostering method that can be applied in railway operations planning. To do this, the work standards of a railway company were identified, and a genetic algorithm was used to develop an optimal roster with equal working time while considering actual working patterns. The optimization process is composed of analysis of the input data, creation of work patterns, creation of a solution, and optimization steps. To verify the method, the roster derived from the proposed process was compared with a manually created roster. The results of the study could be used to reduce the deviation of business hours when generating a roster because the standard deviation of working time is the objective function.

A Study on Revising the National ITS Architecture (국가 ITS 아키텍쳐 정비방안에 관한 연구)

  • Lee, Sibok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.175-181
    • /
    • 2009
  • Korean government has developed the 1st version of the National ITS Architecture in 1999 and utilized it as the framework for ITS planning, design, and standardization. The National Architecture now needs to be revised to accommodate environmental changes in ITS market and advancement of ITS core technologies. This study evaluates the current version of the architecture and suggests the directions for revision for a new national ITS architecture. The two most popular methodologies for architecture development-the process-oriented approach and the object-oriented approach-were reviewed, and the process-oriented approach was selected for new architecture development. The concept of the national architecture was then newly defined based on evaluation of the existing architecture. The new National ITS Architecture is suggested to be composed of ITS user services, logical architecture, physical architecture, and project architecture. This study must be followed by actual architecture development efforts and supporting policy actions for successful deployment of the new National ITS Architecture.

Case Analysis of Conflicts in Renewable Power Generation Projects Using Non-cooperative Game Theory (비협조적 게임이론을 활용한 신재생발전사업 갈등 사례분석)

  • Park, Jaehyon;Kim, Kyeongkuk;Kim, Kyeongseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.2
    • /
    • pp.215-221
    • /
    • 2024
  • The government is encouraging the expansion of renewable energy facilities through national renewable energy policy. However, the installation of renewable energy generation facilities has led to local resident complaints due to landscape degradation, electromagnetic wave emission, real estate devaluation, and environmental pollution. This creates conflicts between power project developers and residents, making the progress of projects more difficult. This study applies non-cooperative game theory to analyze eight cases of renewable energy projects where conflicts between developers and residents were resolved through resident's investment participation. By accepting investments from local stakeholders, residents achieved returns ranging from a maximum of 25 % to a minimum of 4.1 %. It was found through game theory analysis that a dominant strategy involves residents agreeing to the development of the project and the developers sharing a portion of the profits with the residents. The analysis results show that the point where dominant strategy meet forms a Nash equilibrium, and at the same time becomes the Pareto optimal point, benefiting both power generation operators and residents.