Recent increase in the interest and adoption of BIM for infrastructure projects has created a need for formal BIM guidelines in the civil engineering domain. Currently a BIM guideline has been developed in Korea exclusively for the road sector. However, the guideline has gaps in the specification of how BIM models should be generated, managed and applied for maximum effect in projects. This study reviewed the guidelines and tender documents of Singapore to determine potential improvements to adopt in Korea. Results showed that Korea's guideline should focus more on process integration as to stipulating BIM deliverables, encourage a common data environment, clearly distinguish between compulsory and selective BIM applications, and require data and models that can be leveraged in the operation phase of the facility.
Lee, Jiseop;Lee, Jeonghun;Han, Seung Heon;Kang, Sin Young
KSCE Journal of Civil and Environmental Engineering Research
/
v.38
no.6
/
pp.1021-1028
/
2018
As entering the international construction market became more difficult than the past, ODA projects can be a breakthrough for domestic engineering companies to enter the international market. However, since many companies compete for limited projects, it is necessary to reinforce the competitiveness of bidding success. The competitiveness is the result of accumulating experience, reputation, and networking through partnering. Therefore, depending on which partnering strategy has been taken over a long period, the bidding success is decided. The objective of this study is to identify the effective partnering strategy for bidding success. For this, the World Bank bid results, focusing on consulting projects in Vietnam, are collected. Using the bid results, inter-firm network representing the partnering relationship is constructed and the Social Network Analysis is conducted. After then, by conducting the Logistic Regression Analysis, effective partnering strategies are suggested. The result shows that the diversification strategy is advantageous for transportation and city development projects and the concentration strategy is advantageous for water projects. The partnering strategy for the consulting project proposed in this study will be used as a reference for the domestic engineering companies to enter the Vietnam construction market in the future.
Korean Journal of Construction Engineering and Management
/
v.18
no.3
/
pp.105-116
/
2017
In recent years, large Korean construction companies have suffered serious losses in their overseas business. Many practitioners and researchers have analyzed causes of cost overrun in these projects. However, these arguments have not been empirically verified based on acutal project cases. This study investigated cost overrun rate, contingency, allowance, predicted risk before bidding, and actual and residual risk after award in the 67 international infrastructure projects conducted by 13 large construction companies. The causes of cost overruns are derived as follows. First, they identified the possibility of cost overrun to some extent before the bidding, but did not reflect the enough risk money to bid price. In particular, this behavior was more severe in badly cost-overrun projects. Second, the causes of cost overrun were more influenced by external environmental risk than internal capability risk. However, the internal risk in badly cost-overrun projects was relatively high compared to cost-underrun projects. Third, badly cost-overrun projects failed to mitigate risk. However, cost underrun projects were affected more by low exterior risk conditions than by well mitigated risk. This study provides more informed knowledge in controlling project costs in international infrastructure projects.
원자력발전소의 건설은 부존 에너지원이 한정되어 있는 한국의 현실에서 볼 때 당연히 필요하다 할 것이다. 원자력발전소 건설의 특징은 높은 건설비와 장기간의 건설기간으로 설명 될 수 있 는데 이러한 건설사업을 순조롭게 운영관리하고 고도의 기술과 지식을 활용하여 원자력발전소의 안전성을 확보하기 위해서는 필수적으로 전문용역업체인 A/E회사의 사임운영과 설계엔지니어 링에 적극 개입하도록 하여야 한다. A/E회사는 사업의 운영관리에서부터 시작하여 설계 및 엔지 니어링과 구매관리등 전분야에 걸쳐 전문기술자들을 동원하여 전력회사의 요구에 상응하게 일을 처리할 뿐 아니라 발전소 소유주인 전력회사에 부당성과 가치성을 평가하여 줌으로써 적절한 사업계획과 목표관리를 수행하도록 돕는다. 특히 원자력발전소 설계 및 엔지니어링은 광범위한 기술분야가 합쳐서 이루어지는 결정체로써 기계, 전기, 토목, 건축, 핵공학등의 관련기술자들이 사업책임자(P.M)와 기술책임자(P.E)의 통솔하에 일관성 있게 일을 수행해 나간다. 본 해설에서는 이러한 A/E의 복잡하고 다양한 설계 및 엔지니어링의 내용을 상술하였으며 현재 원자력발전소 A/E회사의 기능과 역할을 알리고 이러한 기술업무의 조속한 국산화를 위해 경주되고 있는 노 력들을 단편적으로 소개하였다.
KSCE Journal of Civil and Environmental Engineering Research
/
v.35
no.4
/
pp.1007-1013
/
2015
Desertification in China, one of the source regions of yellow dust, has been worsen by industrialization and extreme land development, which increases the damage caused by yellow dust in Korea. Because the yellow dust from China affects not only their own country, but also neighboring countries, it is becoming an international problem, and China has been started afforestation projects to prevent excessive desertification with the help of the international community. However, it is only possible for identifying the results of afforestation projects to check afforestation result reports from National Bureau of Statistics of China, which makes it difficult to check out tangible results. Therefore, this study was conducted by using remote sensing technique for monitoring afforestation status of Yulin, shaanxi, China. in which an afforestation project has been carried out steadily. MODIS imagery was used as remote sensing data and it was confirmed that vegetation has been increased through vegetation indices from 2000 to 2014 and afforestation areas were estimated as same trend of ground reference data.
KSCE Journal of Civil and Environmental Engineering Research
/
v.31
no.3D
/
pp.375-381
/
2011
This study presents an analysis of $CO_2$ emission reduction effect on bus information system (BIS) which is operated to improve various services of bus transit such as rapid and on-time service. Although the Intergovernmental Panel on Climate Change (IPCC) released three methodological types of models for analyzing the amount of greenhouse gas reduction, this study used the Tier 3 method that is the most concrete one. A case study was performed to a 8.3 km section of Daejun-Chungjoo BIS system, and dataset required to the Tier 3 method was obtained from ITS-based surveillance systems. The study result showed that the reduction effect of $CO_2$ on BIS operation was yearly $39.45tCO_2/km$. Therefore, such effect can be potentially useful to a measurement of effectiveness (MOE) of BIS projects hereafter.
Proceedings of the Korea Water Resources Association Conference
/
2015.05a
/
pp.563-567
/
2015
우리나라 하천관리의 패러다임은 1990년대 이후 기존의 치수 및 이수능력을 고려함과 동시에 하천환경의 보전 및 복원을 새로운 목표로 설정한 자연친화적 방식으로 변화되었다. 하천법령 및 제도적 측면에서도 수자원 장기종합계획 및 유역 종합 치수계획은 하천의 환경보전 및 다목적 이용계획을 포함하도록 규정하고 있으며, 국내 하천법에 따르면 하천기본계획 수립 또한 자연친화적 하천조성 및 이와 관련된 보전지구 지정 등을 포함하도록 규정하고 있다. 하천설계기준, 자연 친화적 하천관리에 관한 통합지침, 또는 수자원 장기종합계획에서 적용하고 있는 하천환경조사 및 평가지표는 서로 다를 뿐만 아니라 과학적인 근거가 명확하지 않는 등 국가차원의 표준화가 이루어지지 못한 상태라 할 수 있다. 1990년대 이후 미국, 독일, 영국, 호주 등 선진국들은 하천환경 복원사업의 추진과정에서 복원사업의 타당성 제고 및 성공적인 사업수행을 위하여 그들 국가의 하천특성에 적합한 하천환경 평가 체계를 구축한 바 있으며, 이들 평가체계는 새로운 과학적 지식과 기술의 축적에 힘입어 지속적으로 발전되고 있다. Fujita의 유형화(Segment 분류)법에 의하면, 하천구간(Segment)은 하상경사, 하상재료, 식생, 생태 등이 통계적으로 동질인 하천 구간으로서, 하도 특성과 하천생태계 공간을 구분하는 단위이다. 자연하천에서 동일한 경사를 갖는 하천구간은 하상재료, 소류력, 저수로 폭, 수심 등이 대체로 동일한 값을 나타내고 있으며, 하도 특성을 지배하는 주요 인자로 각 하천의 평균 연최대유량, 하상재료의 대표입경, 하상경사 등을 설정하고 있다. 본 연구에서는 하천구간을 유형화하는 기준을 하상경사로 적용하여 평가단위를 분류하였으며, 평가체계는 미국의 USEPA를 한국형 하천환경에 맞도록 수정보완 하였다. 특히 미국의 USEPA의 지표 중 하안영역의 식생피복, 하반림 등은 생물분야 식생영역과 상충되어 제외하고 우리나라 특성에 적합한 하천횡단형상, 하천횡단 구조물 등의 평가기준을 재정립하여 내성천에 평가적용 분석하였다. 하천환경의 수리 및 하도 특성 평가기준 개발에 따라 평가체계의 개념적 틀을 토대로 통합적이고 표준화된 한국형 하천평가기준 개발을 위한 방법론을 정립하고, 나아가 하천환경의 지속가능성을 전제로 한 하천복원사업의 장 단기적 성공 여부를 평가할 수 있는 실무지침의 과학적 근거를 제시하고자 한다.
Journal of the Korea Academia-Industrial cooperation Society
/
v.20
no.9
/
pp.133-141
/
2019
Crew rostering in railway operations is usually done by arranging a crew diagram in accordance with working standards every month. This study was done to identify the problems related to the creation of crew rosters in railway operations and to suggest an optimum crew rostering method that can be applied in railway operations planning. To do this, the work standards of a railway company were identified, and a genetic algorithm was used to develop an optimal roster with equal working time while considering actual working patterns. The optimization process is composed of analysis of the input data, creation of work patterns, creation of a solution, and optimization steps. To verify the method, the roster derived from the proposed process was compared with a manually created roster. The results of the study could be used to reduce the deviation of business hours when generating a roster because the standard deviation of working time is the objective function.
KSCE Journal of Civil and Environmental Engineering Research
/
v.29
no.2D
/
pp.175-181
/
2009
Korean government has developed the 1st version of the National ITS Architecture in 1999 and utilized it as the framework for ITS planning, design, and standardization. The National Architecture now needs to be revised to accommodate environmental changes in ITS market and advancement of ITS core technologies. This study evaluates the current version of the architecture and suggests the directions for revision for a new national ITS architecture. The two most popular methodologies for architecture development-the process-oriented approach and the object-oriented approach-were reviewed, and the process-oriented approach was selected for new architecture development. The concept of the national architecture was then newly defined based on evaluation of the existing architecture. The new National ITS Architecture is suggested to be composed of ITS user services, logical architecture, physical architecture, and project architecture. This study must be followed by actual architecture development efforts and supporting policy actions for successful deployment of the new National ITS Architecture.
KSCE Journal of Civil and Environmental Engineering Research
/
v.44
no.2
/
pp.215-221
/
2024
The government is encouraging the expansion of renewable energy facilities through national renewable energy policy. However, the installation of renewable energy generation facilities has led to local resident complaints due to landscape degradation, electromagnetic wave emission, real estate devaluation, and environmental pollution. This creates conflicts between power project developers and residents, making the progress of projects more difficult. This study applies non-cooperative game theory to analyze eight cases of renewable energy projects where conflicts between developers and residents were resolved through resident's investment participation. By accepting investments from local stakeholders, residents achieved returns ranging from a maximum of 25 % to a minimum of 4.1 %. It was found through game theory analysis that a dominant strategy involves residents agreeing to the development of the project and the developers sharing a portion of the profits with the residents. The analysis results show that the point where dominant strategy meet forms a Nash equilibrium, and at the same time becomes the Pareto optimal point, benefiting both power generation operators and residents.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.