• Title/Summary/Keyword: 터널 그라우팅

Search Result 148, Processing Time 0.02 seconds

A Study on Application of Improved Tunnel Water-Sealing Grouting Construction Process and the Inverse Analysis Material Selection Method Using the Injection Processing Results (개선된 터널 차수그라우팅 시공 프로세스 적용 및 그 주입시공결과를 이용한 역해석 재료선정방법 연구)

  • Kim, Jin Chun;Yoo, Byung Sun;Kang, Hee Jin;Choi, Gi Sung;Kim, Seok Hyun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.101-113
    • /
    • 2022
  • This study is planned with the aim of developing a systematic construction process based on the scientific and engineering theory of the water-sealing grouting construction applied to the tunnel excavation process during the construction of the downtown underground traffic network, so that the construction quality of the relatively backward domestic tunnel water-sealing grouting construction is improved and continuously maintained no matter who constructs it. The main contents of the improved tunnel water-sealing grouting can be largely examined in the classification of tunnel water-sealing grouting application and the definition of grouting materials, the correlation analysis of groundwater pressure conditions with groundwater inflow, the study of the characteristic factors of bedrock, and the element technologies and injection management techniques required for grouting construction. Looking at the trends in global research, research in the field of theoretical-based science and engineering grouting is actively progressing in Nordic countries (Sweden, Finland, Norway, etc.), Japan, Germany, and the United States. Therefore, in this study, the algorithm is established through theoretical analysis of the elements of tunnel water-sealing grouting construction techniques to provide an integrated solution including a construction process that can effectively construct tunnel water-sealing grouting construction.

A study on the correlation between the rock mass permeability before and after grouting & injection volume and the parameters of Q system in a jointed rock mass tunnel (절리 암반터널 내 그라우팅 전·후의 암반 투수계수 및 그라우팅 주입량과 Q 시스템 항목들과의 상관관계 연구)

  • You, Kwang-Ho;Jie, Hong-Keun;Seo, Kyoung-Won;Kim, Su-Jeong;You, Dong-Woo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.6
    • /
    • pp.617-635
    • /
    • 2012
  • In this study, correlations between the rock mass permeability before and after grouting & injection volume and the parameters of Q system were investigated on a grouted rock mass tunnel corresponding to rock class 4 and 5 in terms of Q classification system. As a result, it appears that the lower the Q value is, the higher the before-grouting permeability becomes and the smaller the injection volume of grouting becomes. Also RQD and Jn are the most influencing factors to the permeability of rock mass and the injection volume of grouting. In addition, it turned out that it was very difficult to lower the permeability of rock mass smaller than $1.0{\times}10^{-8}$ m/sec with the ordinary portland cement grout.

Case Study of a Shallow Tunnelling Through Complex Strata of Sand-Gravel and Rock Mass (모래자갈과 암반의 복합지층에 시공한 저심도 터널의 사례연구)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.25 no.3
    • /
    • pp.244-254
    • /
    • 2015
  • The tunnel is excavated through the alluvial layer composed of sand and gravel with groundwater deposited on rock. A portion of upper part of the tunnel is located in the alluvial layer and there are several buildings just above the curved section of the tunnel. It is necessary to prevent from sand-flowing into the tunnel due to low strength of the alluvial, high groundwater level and shallow depth of the tunnel from the ground surface. For this, the alluvial around the tunnel is pre-reinforced by umbrella arch method with multi-stage grouting through large diameter steel pipes or jet grouting before excavating the tunnel. The effect of the pre-reinforcement of the tunnel and the safety of the buildings are monitored by measurement of ground deformation occurred during tunnelling.

Application of the SASW Method to the Evaluation of Grouting Performance for a Soft Ground of a Tunnel (터널 원지반의 그라우팅 보강 평가를 위한 SASW 기법의 적용)

  • 조미라;강태호
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.273-283
    • /
    • 2003
  • Fissured rock and soft ground always suggest, problems in the construction of the underground space. The stress release of the weak underground material by opening the underground space with a soft ground, fissures and joints can lead to the failure of the opening. Grouting of the weak rock and the soft ground, which is a process of injecting some bonding agents into the soft ground, is one of the measures to reinforce the soft ground and to prohibit the failure of the underground construction due to the stress release. The proper installation of the grouting is essential to ensuring the safety of the tunneling operation, so that the evaluation of the grouting performance is very significant. The general procedure of evaluating the grouting is coring the grouted section and measuring the compression strength of the core. However, sometimes when the grouted section is at the crown of the tunnel and the grouting is installed at a wide section, the coring is not good enough. This study is oriented to propose a new and a non-destructive procedure of evaluating the grouting performance. The proposed method is based on the wave propagation of elastic waves, and evaluates the shear stiffness of the ground and investigates the anomalies such as voids and cracks. The SASW ( Spectral-Analysis-of-Surface-Waves) method is one of the candidate s to make the inspection of the pouting performance, and is adopted in this study. The practical grouting activity was monitored by SASW method, and the proposed method was applied to the inspection of the grouting performance to check the verification of the proposed method.

A Development of Tunnel Grouting Programme using A Research of Grouting Construction Process (터널 차수 그라우팅 시공 프로세스 연구를 통한 프로그램 개발)

  • Kim, Jin-Chun;Yoo, Byung-Sun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.11 no.1
    • /
    • pp.23-30
    • /
    • 2018
  • The purpose of this study is to provide an integrated solution which includes construction process that allows effective tunnel grouting and to develop a tunnel grouting programme by establishing an algorithm through theoretical analysis on tunnel grouting construction technique factors. In order to verify the developed tunnel grouting procedure and the effectiveness of the programme, they are applied on certain work sites. Values after the application are Lu = 0.31 and ground-water inflow = 0.191/min where as the pre-application value of ground-water inflow is 6.691/min which is approximately 35 times larger. This shows that Tunnel grouting construction effect is significant and suggests the possibility of the application of the process and the programme on future tunnel grouting construction.

Relation of Groundwater Flow Rate and Fracture System Associated with Waterway Tunnel Excavation (도수로터널 굴착에 따른 지하수 유출량과 단열의 관련성)

  • 이병대;조병욱;성익환;함세영;이춘오
    • The Journal of Engineering Geology
    • /
    • v.11 no.3
    • /
    • pp.327-337
    • /
    • 2001
  • To verify the characteristics of groundwater inflow accompanied by the tunnel excavation, the flow rate was measured before and after primary grouting. The relationship between the flow rate and fracture system was also analyzed. The initial flow rate was estimated as 120,990 m$^3$/day through six zones, which were characterized by a large amount of inflow before the primary grouting. After the primary grouting, although considerable amount of inflow was still recognized at the six zones, the flow rate was greatly reduced as 42,844 m$^3$/day. However, great recovery of water levels was not observed. Groundwater flow into the tunnel by excavation of the tunnel is mainly controlled by the fracture system that include faults and joints developed in the host rocks. Four sets of discontinuities affecting on the network of grondwater inflow in the study area were identified as follows: N60-85$^{\circ}C$ W.25$^{\circ}$SW/80$^{\circ}$SW(TSet 1), N40-50$^{\circ}$E.85$^{\circ}$SE/85$^{\circ}$NE(TSet 2), N10-20$^{\circ}$E.85$^{\circ}$SE(TSet 3), and N70-80$^{\circ}$E.80SE(TSet 4).

  • PDF

Recovery Execution in Collapsed Face of Soil-Tunnel Entrance When One-Way Driving (토사터널 1방향 굴진 시 발생한 갱구부 막장 붕락 보강사례)

  • Woo, Sang-Baik;Park, Jong-Ho;Lee, Hong-Sung;Choi, Yong-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.536-549
    • /
    • 2005
  • 국내 대부분을 차지하고 있는 NATM의 주요원리는 주변지반의 지보효과를 활용하는 터널굴착공법이다. 따라서 실제 지반조건이 원설계조건 보다 역학적으로 불량한 경우 보강공법의 적용은 필수적이라 할 수 있으나, 합리적인 설계변경은 현실적으로 쉽지 않은 실정이다. 또한 현실적인 이유로 양방향으로 터널을 관통하는 설계법과 달리 종종 1방향 굴진으로 터널을 관통하는 경우가 있다. 그러나 이러한 1방향 굴진은 불가분 굴진 종점부에서 저토피 갱구를 향하게 되므로, 지반이 연약한 경ㅇ우 막장 붕괴의 위험이 매우 높은 것으로 알려져 있다. 본 터널은 설계 시 갱구부 지반을 풍화암과 연암으로 보고 설계 하였으나, 실제 굴착 시 확인된 지층은 핵석을 포함한 실트질모래(SP-SM)로 판명되었다. 더구나 터널굴진 방향에 있어서도 양방향 굴착이 아닌 저토피 갱구를 향한 1방향 굴진을 실시하였으며, 이러한 시공 중에 터널관통을 불과 19m 남겨둔 갱구부에서 막장부괴와 동시에 상부사면 함몰이 발생하였다. 본 연구는 토사터널 갱구부 1방향 굴진 시 발생한 막장붕괴 보강사례로서, 지상보강(시멘트밀크 그라우팅)과 갱내보강(방사상 FRP보강그라우팅) 그리고 인버트폐합을 실시하여 성공적으로 터널시공을 완료한 사례연구이다. 본 사례는 향후 토사터널 갱구부의 설계와 시공에 유용한 참고자료가 될 것이다.

  • PDF

Applicability Analysis of an Improved Multistep Steel Pipe Grouting Method in Shallow Depth Railway Tunnels in Considering Safety and Constructability (저토피 철도터널구간의 안전 및 시공성을 고려한 개선된 강관다단 그라우팅 공법 적용성 분석)

  • Kim, Nakseok;Choi, Gisung;Kim, Seokhyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.1
    • /
    • pp.97-103
    • /
    • 2020
  • The newly improved multistep steel pipe grouting method was applied to an existing steel pipe-reinforced grouting method. It was applied in order to prevent a damage caused by ground failure from excessive grouting pressure in a tunnel construction. The tunnel goes under a highway and a ramp connected to a rest area on OO highway with 11.3~12.1 m depth cover and is a part of roadbed facility construction section ordered by OO public corporation. The improved grouting method provides pre-construction work condition assessment technique through new water injection limit test and grouting effect assessment technique by grouting type assessment. It also includes assessments on interval of joints, appropriate grouting pressure, and optimal operation time to be applied to current operations. Application of the grouting method allowed the smooth road management in shallow-depth grouting construction area located upper part of tunnel excavation. Moreover, the possibility of the application of the method not only to shallow-depth grouting construction but also to various steel pipe-reinforced grouting constructions was confirmed.

Pillar stability in very near-twin tunnels (초근접 병설터널의 필라 안정성 확보)

  • Kim, Donggyou;Koh, Sungyil;Lee, Jeongyong;Lee, Chulhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.699-714
    • /
    • 2022
  • The objective of this study is to suggest a safe and economical pillar reinforcement method when very near-twin tunnels with a minimum interval of 1 m passes through a soft zone such as weathered soil or weathered rock. A standard cross-sectional view of a two-lane road tunnel was applied to suggest a pillar reinforcement method for the very near-twin tunnels. The thickness of the pillar was 1 m. The ground condition around the tunnel was weathered soil or weathered rock. There were four reinforcement methods for pillar stability evaluation. These were rock bolt reinforcement, pre-stressed steel strand reinforcement, horizontal steel pipe grouting reinforcement, horizontal steel pipe grouting + prestressed steel strand reinforcement. When the ground condition was weathered soil, only the pillar reinforced the horizontal steel pipe grouting + prestressed steel strand did not failed. When the ground condition was weathered rock, there were no failure of the pillar reinforced the horizontal steel pipe grouting or the horizontal steel pipe grouting + prestressed steel strand. It is considered that the horizontal steel pipe grouting reinforcement played a role in increasing the stability of the upper part of the pillar by supporting the upper load applied to the upper part of the pillar.

A Case study on the construction of a long tunnel in the youngdong railroad (Mt. Dongbaek-Dokye) (영동선 동백산-도계간 장대터널 시공사례 연구)

  • Kim, Yong-Il;Yoon, Young-Hoon;Cho, Sang-Kook;Yang, Jong-Hwa;Lee, Nai-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.2
    • /
    • pp.155-165
    • /
    • 2002
  • This paper presents a case study on the construction of a long tunnel named as "Solan tunnel", which connects between Mt. Dongbaek station and Dokye station in the Youngdong Railroad. The tunnel will be the longest tunnel with length of 16.4 km in Korea when completed. The tunnel site is located in a complex geological region with faults, cavities and coal measures. In construction of adit No. 2, geophysical investigation methods such as electrical resistivity method and GPR(Ground Penetration Radar) were used to detect faults, cavities and coal measures in advance with some success. The geophysical investigation results and in-situ boring data were used as feedback to improve tunnel reinforcement design. Also, the tube umbrellas of grouted steel pipes were found to have a good reinforcement and grouting effects in zones of faults, cavities. In zones of coal measures, swellex rockbolts with mortar grouting were verified as successful.

  • PDF