• Title/Summary/Keyword: 터널안전

Search Result 919, Processing Time 0.028 seconds

Evaluation of fire-proofing performance of reinforced concrete tunnel lining coated by newly developed material (신개발 내화재료에 피복된 철근콘크리트 터널라이닝의 내화성능평가)

  • Park, Hae-Genn;Kim, Jang-Ho Jay
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.4
    • /
    • pp.329-336
    • /
    • 2008
  • Efficient traffic network is required in urban area for good living condition. However, dense traffic network creates traffic jam and gives bad influences to the ground environment. Therefore, advanced use of underground and tunnel is required. But, in the last 20 years many tunnel fire accidents have occurred all over the world. Increase of tunnels and increase of traffics result in increase of tunnel fire. Tunnel fire creates damage to people and to the tunnel structure. Also, tunnel fire creates a big economical loss. In a mountain tunnel, the stability of the tunnel will not be disturbed by fire although the tunnel lining will get a severe damage. However, in a shield tunnel or immersed tube tunnel, cut and cover tunnel, there is a high possibility that tunnel itself will collapse by fire because their tunnel concrete lining is designed as a structural member. The aim of this experimental research is to verify the fire protection performance of newly developed cementitious material compared with the broadly used existing products in Europe and Japan. For the experiments, the general NATM tunnel concrete linings with the newly developed material were tested using fire loading curve of RABT (Maximum peak temperature is $1,200^{\circ}C$) and RWS (Maximum peak temperature is $1,350^{\circ}C$). From the test results, the newly developed fire protection material applied with 30 mm thickness showed good fire-proofing performance under RABT fire loading.

  • PDF

A evaluation study of a fire smoke diffusion delay device installed in a great depth underground double deck tunnel (대심도 복층터널에 설치 가능한 화재연기 확산지연장치 성능 평가 연구)

  • Shin, Tae-Gyun;Moon, Jung-Joo;Yang, Yong-Won;Lee, Yun-Taek
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.225-234
    • /
    • 2018
  • Domestic urban areas are experiencing serious traffic congestion problems due to continuous population growth and increased traffic volume. In order to solve the problem of traffic congestion, the study of great depth underground double deck tunnels using underground space is being actively carried out in the urban areas. The characteristics of great depth underground double deck tunnels are low in cross section, so the spread of fire smoke is expected to spread faster than the road tunnel in case of fire. Therefore, it is necessary to provide a fire smoke delay device which delays the spread of fire smoke when a fire occurs in a tunnels. In the previous study, the diffusion effect was analyzed according to the blocking area when the fire smoke spread delay device was operated through the 3D CFD in the study of preventing the smoke spread in the case of the tunnel fire. A study on fire smoke diffusion delay device using spring elasticity which is excellent in applicability to a tunnel and economical value is studied. In this study, fire smoke spread delay system was developed to fire smoke delay was experimentally analyzed. Fire smoke delay effect of fire smoke delay device appeared. Therefore, it is considered that the can minimize the damage of the victims when installed in the great depth underground double deck tunnels.

Comparative risk analysis of NATM and TBM for mixed-face large-diameter urban tunneling (도심지 대단면 복합지반 NATM 과 TBM 터널공법의 비교위험도 분석)

  • Kim, Young-Geun;Moon, Joon-Shik;Shim, Jai-Beom;Lee, Seung-Bok;Choi, Chang-Rim;Chun, Youn-Chul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.1
    • /
    • pp.19-32
    • /
    • 2011
  • The risk assessment is essential for tunnel design in order to minimize risks associated with uncertainty about geological conditions and tunneling method. This paper provides a comparative risk analysis of a large single bore TBM driven tunnel against sequentially excavated NATM tunnel for a mixed-face large-diameter urban tunnel project near or under a river. The focus of this assessment is on the risks associated with the tunnel excavation methods, in particular whether a TBM or NATM presents more or less risk to achieve the planned excavation duration and bring the project within the estimated bid price. First, the impacts and risks to tunnel construction under each method were discussed, and the risks were scored and ranked in the order of perceived severity and likelihood. Finally, the assessment from a risk based perspective was conducted to decide which alternate tunneling method is more likely to deliver the project with the least time and cost. It is very important to note that this study is only applied to this tunnel project with specific geological conditions and other contract requirements.

A study on the development of tunnel soundness evaluation system using artificial neural network (인공신경망을 이용한 터널 건전도 평가시스템 개발)

  • 김현우;김영근;이희근
    • Tunnel and Underground Space
    • /
    • v.9 no.1
    • /
    • pp.48-55
    • /
    • 1999
  • One of the major roles of concrete lining is the supplementary support of ground load. Therefore, if there are cracks or deformation found in the lining, the causes should be carefully examined. Tunnel Soundness Evaluation System (DW-TSES) was developed to meet such requirements. Main facility of the system was intended to find the probable causes on the basis of the apparent changes in lining and the environmental conditions. It also includes facilities for evaluating the soundness of a tunnel and indicating the method for repair or reinforcement. The characteristic feature of damages is used for reasoning in case of deterioration and leakage, and artificial neural network is used in external pressure. This process depends on the results of the case analyses and FDM, which have a collection of the typical features of different types of damages as well as the unusual changes caused by the external pressure. The comparison of the outputs of this system with those of expert's diagnoses draws the following conclusions. 1) Artificial neural network was a suitable tool to find to causes of damages by external pressure. 2) The environmental conditions improved the accuracy in reasoning. 3) The result of finding causes and evaluating soundness was helpful to suggest effective methods concerning tunnel maintenance.

  • PDF

A study on the program development for area optimizing of damper ports in road tunnels with transverse ventilation system (횡류식 도로터널의 급, 배기구 포트 개구면적 최적화 프로그램 개발 연구)

  • Jo, Hyeong-Je;Chun, Kyu-Myung;Min, Dea-Kee;Kim, Jong-Won;Beak, Jong-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.177-188
    • /
    • 2019
  • The purpose of the optimization of the installation of supply/exhaust ports for tunnels with transverse ventilation system is to supply fresh air from outside to inside of tunnels uniformly and exhaust pollutant from tunnels properly for creating safe and clean environment for tunnel users. For this purpose, a ventilation port area optimization program was developed to obtain a uniform supply or exhaust air volume inside a great depth double deck tunnel with transverse ventilation system. In order to area optimize the developed port sizing program, the wind velocity was measured in the duct of the currently operated tunnel with semi-transverse ventilation. Also 3D cfd was performed on the same tunnel and cfd results were compared to the measured value. As a result, the error rate between the predicted value from the program and measured value was 6.72%, while the error rate between the predicted value from the program and 3D cfd analysis value was 4.86%. Both of comparison results show less than 10% of error rate. Thus It is expected that supply/exhaust port optimization design of transverse ventilation tunnel can be possible with using this large exhaust port area optimization program.