• Title/Summary/Keyword: 터널안전

Search Result 914, Processing Time 0.028 seconds

A Study on Tunnel Cleaning Automation Equipment & Introducing Advanced Tunnel Cleaning Automation Equipment (터널 청소장비의 고찰 및 개선된 모델에 관한 연구)

  • Lee, Tai-Sik;Jang, Kyung-Soo;Koo, Ja-Kyung;Park, Kyung-Soon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.669-673
    • /
    • 2006
  • Field works are decreasing gradually since advancement of industrial robots. Tunnel cleaning is a dangerous field work which can be solved only by introducingadvanced tunnel cleaning automation equipment. Industrial robots work tirelessly night and day without a loss in performance. Consequently, greatly reduce the costs of manufactured goods.So far only 200 construction robots are invented. Robots used for tunnel cleaning are not of high standard they always need additional workers for job to be done. Robots offer specific benefits to workers, industries and countries. If introduced correctly for tunnel cleaning, industrial robots can improve the quality of life by freeing workers from dirty, boring, dangerous and heavy labor. Development of advanced tunnel cleaning automation equipment is a must to overcome above issues. The benefits of robots to industry include improved management control, productivity and consistently high quality products. This research is a study on tunnel cleaning automation equipment and introducing advanced tunnel cleaning automation equipment.

  • PDF

Thermal Analysis of a Retrievable CANDU Spent Fuel Disposal Tunnel (회수 가능 CANDU 사용후핵연료 처분터널에 대한 열 해석)

  • Cha, Jeong-Hun;Lee, Jong-Youl;Choi, Heui-Joo;Cho, Dong-Keun;Kim, Sang-Nyung;Youn, Bum-Soo;Ji, Joon-Suk
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.6 no.2
    • /
    • pp.119-128
    • /
    • 2008
  • Thermal assessment of a new CANDU spent fuel disposal system, which improves the retrievability of the spent fuel and enhances the densification factor compared with the Korean Reference disposal System, is carried out in this study. The canisters for CANDU spent fuels are stored for long term and cooled by natural convection in the proposed disposal system for the retrievability. The steady state thermal analyses for proposed CANDU disposal system are carried out with the ANSYS 10.0 CFX code. The thermal analyses are performed through two steps. At the first step, the sensitivity of the disposal tunnel spacing is analysed. The differences of maximum temperatures by several tunnel spacings are calculated at three points in the disposal tunnel. The result shows that the differences of the temperature at the three points are almost negligible because 99% of the decay heat is removed by natural convection. At the second procedure, 60m tunnel spacing with a ventilation system instead of natural convection is considered. The result is applied to the calculation of the canister surface temperature in disposal tunnel as boundary conditions. Consequently, the average and the maximum surface temperature of disposal canisters are $79.9^{\circ}C$ and $119^{\circ}C$, respectively. The inner maximum temperature of a basket in the disposal canister is calculated as $140.9^{\circ}C$. The maximum temperature of the basket meets the thermal requirement for the CANDU spent fuel cladding.

  • PDF

A Study on the Safety Assessment Technique of a Tunnel Using Critical Stain Concept (한계변형률 개념을 활용한 터널 안정성 평가에 관한 연구)

  • Park, Si-Hyun;Shin, Yong-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.5
    • /
    • pp.29-41
    • /
    • 2007
  • An assesment technique for the quantitative evaluation of tunnel safety during tunnel excavation was newly proposed in this study using displacement measurements. First of all, field measurement guidelines used at tunnel construction sites in Korea and other countries were investigated. It was found out that the criteria of the guidelines were not clear and varied depending on the construction sites. The practical use of field measurement data for the evaluation of tunnel safety was very limited due to uncertainties of the guidelines related to the interpretation of measured data during the excavation. Critical strain concept is introduced in this study for the assesment of tunnel safety during the tunnel excavation. Moreover, the characteristics of tunnel displacements caused by the tunnel excavation were investigated in detail in order to investigate the practical application of the critical strain concept. The total tunnel displacements can be subdivided into three parts: displacements occurring ahead of tunnel face, displacements occurring prior to measurements, and displacements occurring after the installation of instruments. The characteristic of each portion of displacements is analysed in this study. Finally, a general method on the use of the displacement measurement data for the critical strain concept was suggested in the concrete manner, considering the field measurement practice in Korea.

Stability analysis of closely-spaced tunnel using RFEM (확률유한요소 해석에 의한 근접터널 안정성 분석)

  • Kim, Sang-Gyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.4
    • /
    • pp.349-360
    • /
    • 2008
  • In this paper, the modeling procedure of random field with an elasto-plastic finite element algorithm and probability of failure on closely-spaced tunnel were investigated. Local average subdivision (LAS) method which can generate discrete random variables fast and accurately as well as change the resolution in certain region was used. And correlated value allocating and weighted average method were suggested to implement geometrical characteristics of tunnel. After the probability of failure on the test problem was thoroughly investigated using random finite element method, the results were compared with the deterministic strength reduction factor method and single random variable method. Of particular importance in this work, is the conclusion that the probability of failure determined by simplified probabilistic analysis, in which spatial variability is ignored by assuming perfect correlation, can be estimated from the safety factor determined by strength reduction factor method. Also, single random variable method can lead to unconservative estimates of the probability of failure.

  • PDF

The Evaluation on the Type of Support Element by Field Test Data in 4-lane Wide Road Tunnel (4차로 광폭터널의 계측결과를 이용한 암반등급에 따른 지보수준 평가)

  • Do, Jongnam;Kim, Yeonjoong;Lee, Chanbok;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.1
    • /
    • pp.15-20
    • /
    • 2012
  • Field measurement is a very essential factor for economic aspect and estimation of stability of tunnels. In this paper, various types of support element based on field test data in 4-lane wide road tunnel were evaluated. And stability and economical efficiency were also estimated. The estimated value were compared with design value and the type of support element which is applicable to site condition was evaluated. The results show that most of support elements were modified under the standard value(30mm) and type of support element which is already constructed was overestimated. So, appropriate level of support element have to be presented to save the time and cost during construction.

A Study on the Methodology modelling of Risk Assessment in Road Tunnels (도로터널시설 위험평가 모델링을 위한 방법론 연구)

  • Cho, Inuh;Han, Dae-yong;Kim, Seung-jin;Yoon, Jong-ku
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.4
    • /
    • pp.59-73
    • /
    • 2016
  • The demand for subsurface transport is increasing. The users and the operators of road tunnels are exposed to risks with different causes. One main cause, however, is the traffic situation in the event of accidents. The importance of a Quantified Risk Assessment is increasing to quantify the safety of road tunnels and to balance the requirements (capacity, reliability, availability, maintainability and safety) of various stakeholders. Although there are classical methods for risk assessments, such as ETA and FTA. These methods are used for relatively simple cases because it could not relevantly reflect the diversity and relationship of the parameters. Therefore, a quantitative risk assessment based on Bayesian Probabilistic Networks considering interdependence between the parameters of a complex underground system as a double deck tunnel is provided.

과천선 사당-금정간 복선전철 제4공구 현장의 터널구간 붕괴재해 원인분석

  • korea construction safety engineering association
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • v.2 no.2 s.4
    • /
    • pp.82-104
    • /
    • 1992
  • 최근 지하철공사 발주량 증가에 따라 일부현장에서 붕괴사고가 발생되고 있고 유사사고의 발생가능성도 높아, 사고예방에 도움되고자 하는 목적에서 이번사고의 원인규명 및 보강대책을 제시한다. -편집자 주-

  • PDF

A re-appraisal of scoring items in state assessment of NATM tunnel considering influencing factors causing longitudinal cracks (종방향균열 영향인자 분석을 통한 NATM터널 정밀안전진단 상태평가 항목의 재검토)

  • Choo, Jin-Ho;Yoo, Chang-Kyoon;Oh, Young-Chul;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.479-499
    • /
    • 2019
  • State assessment of an operational tunnel is usually done by performing visual inspection and durability tests by following the detailed guideline for safety inspection (SI) and/ or precision inspection for safety and diagnosis (PISD). In this study, 12 NATM tunnels, which have been operational for more than 10 years, were inspected to figure out the cause of longitudinal cracks for the purpose of modifying the scoring items in the state assessment NATM tunnel related to the longitudinal crack and the thickness of concrete lining. All investigated tunnels were classified into four groups depending on the shape and usage of each tunnel. The causes of longitudinal crack occurrence were analyzed by investigating the correlations between the longitudinal crack and the following four factors: the patterns of ground excavation; construction state of primary support system; characteristics of material properties of the concrete lining; and thickness of lining which was obtained by Ground Penetration Radar (GPR) tests. It was found that influencing factors causing longitudinal cracks in the lining were closely related with the construction condition of the primary support system, i.e. shotcrete, rockbolt, and steel-rib; crack occurrences were not much affected by the excavation patterns. As for the properties of concrete lining materials, occurrence of the longitudinal crack was mostly affected by the following three items: w/c ratio; contents of cement; and strength of lining. When estimating the lining thickness of the concrete lining by GPR tests and taking thickness effect into account in the statement assessment, it was concluded that increase of the index score by an average of 0.03 (ranging from 0.01 up to 0.071) is needed; a more realistic way of state assessment should be proposed in which the increased index score caused by lack of lining thickness should be taken into account.

Application of SFRC as a lining material in tunnels (터널라이닝 구조재로서 SFRC 적용에 관한 연구)

  • Yi, Sang-Keun;Kim, Dong-In;Jo, Gyu-Seung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.4
    • /
    • pp.25-34
    • /
    • 2001
  • As the topography of Korea consists of mountains at about seventy percent, there is necessarily an increasing demand for tunnel construction according to the expansion of the existing highway and construction of new highway. The concrete lining of tunnel portals has been designed with reinforced concrete to resist the cracking due to the difference in temperature in the inside and outside of tunnel. In the paper, the application of steel fiber reinforcement concrete was analyzed as the lining concrete at tunnel portals and through structure analysis and field model test the suitability of the steel fiber reinforcement concrete was assessed as the lining member of tunnel portal.

  • PDF

A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System (지하환기소 대단면 터널 시공 사례 연구)

  • Noh, Seung Hwan;Choi, Sung Wook;Noh, Sang Lim
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.195-204
    • /
    • 2017
  • This case study introduces the construction of large cross section tunnel for underground ventilation system in Sillim-Bongcheon Tunnel Project. In order to grant the safety and efficiency in connecting the ventilation shaft (7.8 m of width, and 6.6 m of height) to a tunnel for axial fan facility (20.8 m of width, and 12.3 m of height), gradual enlargement of tunnel cross section was employed between those and temporary support method was determined based on Q system. In addition, some original designs were revised during construction stage to improve the efficiency of excavation in large cross section tunnel. The advance length was optimized and top heading of the tunnel was excavated without partition in accordance with ground condition and numerical stability analysis results. It is believed that some experiences and considerations in this case study will be useful for the future design and construction in similar large cross section tunnel such as large underground ventilation system or road tunnel with four lanes.