A CASE STUDY OF FEM ANALYSIS ON GROUND REINFORCEMENT USING HORIZONTAL JET GROUT ROOFING IN SOFT GROUND TUNNELING (연약 지층 터널의 보강공법에 관한 FEM 해석 사례연구)

  • 김주봉;문상조
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.10a
    • /
    • pp.51-56
    • /
    • 1993
  • This paper presents the FEM anlysis results performed to assess the applicability of Horizontal Jet Grout Roofing, and of ground improvement methods for tunneling in soft ground. Horizontal Jet Grount Roofing Method is applicable to ensure the stability of tunnel face in non-cemeted alluvial strata under high ground water pressure. For applying this method, to ensure the reliability, the Horizontel Jet Grout Roofing should be double lined with pre-grouting to reduce the water inflow during the jet grouting.

  • PDF

The Effect of Cement Milk Grouting on the Deformation Behavior of Jointed Rock Mass (시멘트현탁액 주입에 의한 절리암반의 역학적 특성 변화)

  • 김태혁;이정인
    • Tunnel and Underground Space
    • /
    • v.13 no.5
    • /
    • pp.331-343
    • /
    • 2003
  • Though the Grouting has been in use for a long time, it is still regarded as an technique rather than engineering. The study of ground improvement by grouting is rare especially in jointed rock mass. In this study, biaxial compression tests were performed in the jointed rock mass models with .ough surfBce joints assembled with blocks before and after grouting. The load-deformation curves of the jointed rock masses showed a non-linear relationship before grouting but showed a relatively linear deformaion behavior after grouting. Improvement ratio (deformation modulus after grouting/deformation modulus before grouting) decreased with increasing joint spacing and lateral stress. Improvement ratio decreased exponentially with increasing deformation modulus of the rock mass model before grouting. Three-dimensional FDM analysis was performed to a highway tunnel case using experimental data of grouted rock. The convergence of the tunnel predicted after grouting by the numerical modelling coincided with those attained from the field measurement.

Influences of Grouting Pressure of Microcement to Upper Structures (지반보강용 마이크로시멘트의 주입압이 상부구조물에 미치는 영향)

  • Hwang, Chul-Sung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.70-77
    • /
    • 2010
  • Microcement grouting and micro pile are frequently used for ground modification during tunnel construction. The influence of grouting pressure of microcement grouting and micro pile to the existing bridge which is directly over the constructing tunnel is investigated. Three dimensional seepage flow-structure interactive analysis considering firm water pressure with full stages of construction including the construction of upper bridge, microcement grouting, micro pile and tunnel is performed. The settlement and tilting of the pier of existing bridge violate the design code and the reaction of the bridge are highly increased after grouting. The stress of tunnel bracings such as rockbolt and shotcrete also exceed the limit of the code. The pressure of microcement grouting is confined by bedrock and transmit to the surrounded soil and the upper bridge. Microcement grouting needs mid-high pressure to penetrate through weak fault plane and the pressure greatly influence the safety of the upper structure. It is important to decide and care the grouting pressure to improve weak fault plane directly under the existing structures and the pressure of microcement grouting should be considered in underground analysis.

A Study on the Upper Ground Reinforcement Effect in Underground Cavern (지하공동 상부지층 보강효과에 관한 연구)

  • Kim, Ki Ho;Lim, Jong Se;Jang, Won Yil
    • Tunnel and Underground Space
    • /
    • v.25 no.3
    • /
    • pp.275-283
    • /
    • 2015
  • Excavation of underground space in soft ground implicate to the structure, such as subsidence. As a result, it has been acting as a serious risk to the stability of the roads and facilities. Therefore, in order to stabilize the soil stabilization and reinforcement of the structure, we have been using a number of methods and injecting material. In this study, we compared and analyzed the amount of subsidence regarding the ground reinforcement during underground excavation in soft ground by performing model test. And three-dimensional numerical analysis was performed using FLAC 3D. The subsidence was simulated numerically according to the tunnel excavation. The subsidence results of the model tests and numerical analyzes were relatively consistent. Thus comparing the ground subsidence by varying the reinforcement area on the numerical analysis was analyzed. As a results, three-dimensional numerical simulation could be regarded to simulate better on the ground subsidence by various kinds of underground excavation and it can be used as a material of subsidence prevention methods.

An experimental study on the viscosity features of sealant (bentonite-cement slurry) in umbrella arch method (강관다단공법에 적용되는 씰링재 (벤토나이트-시멘트 슬러리)의 점성 특성에 대한 실험)

  • Sagong, Myung;Lee, Jun S.;Park, Jeongjun;Cho, Chungsik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.5
    • /
    • pp.773-786
    • /
    • 2018
  • In this paper, viscosity features of sealant (bentonite-cement slurry), which is used for umbrella arch method in tunnel, were studied. The sealant must secure optimal strength and capacity for the waterproof and stabilization of borehole as well as to satisfy groutability. In this study, the variation of viscosity was measured with different mixing processes. With an increase of initial mixing period with water and bentonite mixture, the required time for the rapid increase of viscosity of the sealant is shorten. With increase of mixing period, the possibility of swelling of bentonite will increases and this can lead increase of the viscosity of the mixture. In addition, the behaviors of sealant vary with a drastic increase of the viscosity: thixotropy and rheopexy. Furthermore, the bentonite/water mixing period influences on the bleeding features of the sealant. Further study is required to introduce the guideline, which can be applicable in the field in the aspect of required capacity of the sealants and mixing processes of the ingredients.

Case Study of the Stability of a Large Cut-Slope at a Tunnel Portal (터널 입구부 대절토 사면 안정성 사례 연구)

  • Park, Dong Soon;Bae, Jong-Soem
    • The Journal of Engineering Geology
    • /
    • v.25 no.1
    • /
    • pp.115-129
    • /
    • 2015
  • The cut-slope of a large-sectional tunnel portal is recognized as a potential area of weakness due to unstable stress distribution and possible permanent displacement. This paper presents a case study of a slope failure and remediation for a large-scale cut-slope at a tunnel portal. Extensive rock-slope brittle failure occurred along discontinuities in the rock mass after 46 mm of rainfall, which caused instability of the upper part of the cut-slope. Based on a geological survey and face mapping, the reason for failure is believed to be the presence of thin clay fill in discontinuities in the weathered rock mass and consequent saturationinduced joint weakening. The granite-gneiss rock mass has a high content of alkali-feldspar, indicating a vulnerability to weathering. Immediately before the slope failure, a sharp increase in displacement rate was indicated by settlement-time histories, and this observation can contribute to the safety management criteria for slope stability. In this case study, emergency remediation was performed to prevent further hazard and to facilitate reconstruction, and counterweight fill and concrete filling of voids were successfully applied. For ultimate remediation, the grid anchor-blocks were used for slope stabilization, and additional rock bolts and grouting were applied inside the tunnel. Limit-equilibrium slope stability analysis and analyses of strereographic projections confirmed the instability of the original slope and the effectiveness of reinforcing methods. After the application of reinforcing measures, instrumental monitoring indicated that the slope and the tunnel remained stable. This case study is expected to serve as a valuable reference for similar engineering cases of large-sectional slope stability.

A Case Study on the Stability Analysis for the Road Construction above Abandoned Mine (폐광산 상부 도로 안정성 검토 사례)

  • 문상호;나승훈;이상필
    • Tunnel and Underground Space
    • /
    • v.14 no.5
    • /
    • pp.305-317
    • /
    • 2004
  • Due to the steep and narrow characteristic of domestic coal beds, the slant chute caving or sub-level caving method have been mainly adopted in Korea, whereas the long-wall mining has been widely used all around world. However, the slant chute caving or sub-level caving method have disadvantage of not giving much information on the scale and characteristic of abandoned mines. Hence, those information on the abandoned mines in Korea are not easily available. In this study, based on the characteristic investigation of the domestic mining methods, the geological survey and safety analysis were carried out for Donghae highway section 2. Finally, the optimum ground reinforcement methods for that site were selected.

Standardization of tunnel supporting system in karst formation (석회암 공동발달유형에 따른 터널지보패턴의 표준화에 대한 연구)

  • Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.3
    • /
    • pp.279-289
    • /
    • 2003
  • In karst formation area, the tunnel support system is an important factor for the tunnel safety during operation. It is also not easy to determine the tunnel supporting system in the design stage. Therefore, it is necessary to standardize the tunnel supporting system in uncertain ground condition. This paper presents the standardization of the tunnel supporting systems to be adopt in karst formation. For the tunnel planned in the project area, karst features and the expected scenarios in the tunnel area were developed based on the results of the geological and geotechnical assessment. In order to provide specific supporting system and construction details for a wide range of possible karst features, the generalized typical support systems are developed according to the classification of karst features. In addition, the initial support systems and construction sequence for each karst feature are also presented in this paper.

  • PDF

Pre-grouting for CHI of EPB shield TBM in difficult grounds: a case study of Daegok-Sosa railway tunnel (복합지반 EPB TBM 커터교체를 위한 그라우팅 수행 사례)

  • Kang, Sung-Wook;Chang, Jaehoon;Lee, Jae-Won;Kim, Dae-Young;Shin, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.281-302
    • /
    • 2021
  • Railway projects have been consistently increasing in Korea. In relation to this trend, the mechanized tunneling using Tunnel Boring Machine (TBM) is preferably applied for mining urban areas and passing under rivers. The TBM tunneling under difficult grounds like mixed faces with high water pressure could require ground improvements for stable TBM advance or safe cutter head intervention (CHI). In this study, pre-grouting works for CHI in Daegok-Sosa railway project are presented in terms of the grouting zone design, the executions and the results, the lessons learned from the experience. It should be mentioned that the grouting from inside TBM was carried out several times and turned out to be inefficient in the project. Therefore, grouting experiences from the surface are highlighted in this study. Jet grouting was implemented on CHI points on land, while permeation grouting off shore in the Han River, which mostly allow to access the cutter head of TBM in free air with stable faces. The results of CHI works have been analyzed and the lesson learned are suggested.

Vibration monitoring at Vibrating Compaction Works for Ground Improvement (진동 지반다짐 공법에 대한 장기간 진동계측 사례)

  • Kim, Duk-Young;Kim, Sun-Woong
    • Explosives and Blasting
    • /
    • v.33 no.2
    • /
    • pp.40-43
    • /
    • 2015
  • In this case study, a S/W optimized for ground vibration monitoring and analysis was developed. It was applied at vibrating compaction works for the ground improvement needed for the expansion of terminal 5 in Chagi International Airport in Singapore. The possible application of the new vibration analysis software to similar works like pile driving and the capability of long term and real time of the repeated wave vibration at seawalls, the vibration occurring from large structures like super tall buildings, tunnels, long cable hanging bridges, and etc were investigated.