• Title/Summary/Keyword: 터널공사

Search Result 623, Processing Time 0.027 seconds

An application of the tubular roof construction method for Seoul subway tunnel construction (서울지하철 터널의 T.R.c.M. 공법 적용 사례 연구)

  • Jie, Hong-Keun;You, Kwang-Ho;Park, Yeon-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.4
    • /
    • pp.345-356
    • /
    • 2004
  • Open-cut method has been widely used to construct underground structures, but it causes several problems such as traffic congestion and public resentment resulting from severe construction noise and ground settlement. In many cases, it is very difficult to build underground structures safely due to the unknown locations of buried facilities such as water pipes, drainage pipes, gas pipes and high-pressure cable conduits etc. Also in open-cut method, moving buried facilities causes additional cost and extension of construction period. Therefore, this paper is to present a case study in which Tubular Roof construction Method (T.R.c.M.), a newly developed construction method for underground structures using slab steel pipes and PC wall trench, is applied for the construction of a subway tunnel in Seoul. As a result, it is found that T.R.c.M. is a construction method by which tunnels can be constructed safely without any effect on the surrounding environment and traffic flow due to the minimized construction vibration and noise.

  • PDF

고속도로공사 재해유형에 따른 안전확보기법 연구(고속도로 공사를 중심으로)

  • 양학수;손기상
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.11a
    • /
    • pp.197-203
    • /
    • 2002
  • 고속도로란 지역과 지역을 연결한 간선도로로 장거리 통행을 주 교통으로 하여 지정된 진출입외에는 완전히 출입을 제한한 자동차 전용도로이다. 영문으로는 freeway, Expressway, Motorway등으로 표기한다. 고속도로 건설은 정부투자 기관인 한국도로공사(Korea Highway Corporation)에서 공사를 발주하여 주로 대형건설업체들이 시공하고 있으며, 이에 대한 시공관리는 대개 도로공사 건설사업소 단위로 시행하고 있다. 고속도로 건설공사의 개략적 구성을 보면 토공, 구조물공, 배수공, 터널공, 부대공 등으로 형성되고 있으며, 시공형태는 대형화, 기계화 되어감에 따라 재해의 유형도 변화가 일고 있다.(중략)

  • PDF

건설안전리포트 - 현대건설(주) 성남-장호원 도로건설공사 제2공구 현장

  • Yeon, Seul-Gi
    • The Safety technology
    • /
    • no.170
    • /
    • pp.12-14
    • /
    • 2012
  • 경기도 광주시에 위치한 성남-장호원 도로건설공사 현장. 이곳은 성남에서 장호원을 연결하는 국도 3호선 공사 6개 공구 중 2번째 공구로, 현대건설이 시공을 맡고 있다. 연장 6.3km 6차선 도로를 신설하는 대규모 공사로, 공사비만도 무려 3,924억원에 달한다. 게다가 도로의 상당부분이 교량과 터널로 구성되어 있어 공정도 상당히 까다로운 곳이다. 즉 전반적으로 관리가 매우 어려운 현장이라고 할 수 있다. 헌데도 이곳은 2002년 3월 착공에 들어간 이래 현재까지 무재해를 이어가고 있다. 실로 이곳 현장의 안전관리가 얼마나 철두철미한지를 느끼게 하는 대목이다. 안전으로 도로건설공사의 새로운 교범을 만들어가고 있는 이곳 현장을 찾아가봤다.

  • PDF

고속도로 터널 단면 최적화 방안에 대한 연구

  • Park, Gwon-Je;Jeong, Guk-Yeong;Kim, Ji-Yeop;Kim, Ji-Hun;Kim, Yong-Sik;Choe, Yeong-Jin;Sin, Gi-Hyeok;Hong, Ik-Pyo
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.14 no.3
    • /
    • pp.38-47
    • /
    • 2012
  • 고속도로 터널 공사비의 가장 큰 비중을 차지하는 터널 단면 설계시, 주요 표준단면 결정요소의 일률적인 적용 및 기존 단면을 답습함에 따라 터널 천단부 등에 과대한 사공간이 발생하고 있으며, 기계환기 터널의 경우 제트팬 설치가 가능하도록 계획된 단면을 터널 전연장에 적용하고 있으나, 대부분의 구간은 제트팬 설치가 불필요한 구간이므로 이를 감안한 경제적인 단면 계획이 필요한 실정이다. 본 연구에서는 터널 내공단면 결정요소에 대한 개선 사항 및 기계환기 터널 적용시 단면 이원화를 통한 고속도로 터널 단면 최적화 방안을 도출하였다. 결과적으로 굴착 단면 최적화에 따른 경제성 확보 및 $CO_2$ 절감 효과를 기대할 수 있으며, 설계시 이를 바탕으로, 터널의 환기, 방재조건 및 토공량 등 노선 특성을 고려한 최적의 단면 계획이 필요하다.

  • PDF

A study on the air leakage performance improvement of duct coupling for temporary ventilation of long subsea tunnel (초장대 해저터널의 공사중 덕트 접속부의 누풍 성능 개선에 관한 연구)

  • Jo, Hyeong-Je;Min, Dea-Kee;Kim, Jong-Won;Lee, Ju-Kyung;Beak, Jong-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.319-333
    • /
    • 2017
  • The construction of long sub-sea tunnel does not provide the favorable condition for the installation of ventilation system to be used during construction due to the constrained construction space. For the ventilation system required during construction, the artificial island where ventilation shaft is located is constructed at some location along the sub-sea tunnel route, which requires a high construction cost. Therefore, it is intended, as much as possible technically, to minimize the construction of artificial island. However, this requires a longer distance between ventilation shafts, there-by causing increased air leakage at the ventilation duct connection points due to the higher fan pressure being required to deliver ventilation air. Previously the air leakage was studied as an important issue. In this study experiments were carried out to develop the improved duct connection method considering various conditions such as, tunnel length, etc. Additionally, its performance results with leakage rates are shown and compared to the "S" class leakage rate of SIA. As a result, the new duct coupling type of improved method is analyzed as applicable to such a 30 km long tunnel with the leakage rate of $1.46mm^2/m^2$, which is better performance than SIA leakage rates.

A Case Study of Collapse at Tunnel Portal adjacent to the Large Cut Slope (대절토사면과 인접한 터널갱구부의 붕괴사례연구)

  • Koo, Ho-Bon;Kim, Seung-Hee;Rhee, Jong-Hyun;Kim, Jin-Hwan
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.573-576
    • /
    • 2008
  • 절토사면 및 천심도 터널의 경우 불연속면을 따른 블록의 미끄러짐 및 회전 등이 안정성에 큰 영향을 미친다. 국도나 지방도 등을 확장 공사함에 따라 산악이 많은 우리나라 지형의 특성상 절토사면이 많이 발생하게 되고, 경우에 따라서는 이러한 절토사면에 터널이 위치하게 된다. 이런 상황의 터널갱구부 및 인접한 절토사면부에서 붕괴 및 균열이 빈번하게 발생되고 있다. 본 연구에서는 대절토사면과 인접한 터널갱구부에 대하여 편토압이 균열의 주원인인지를 결정하기 위하여 변위 및 응력 패턴을 분석한 사례연구를 제시하였다. 조사대상지역은 울진군에 위치한 터널굴진 현장이고, 붕괴는 터널갱구부와 인접한 절토사면부에서 발생하였으며 터널갱구부 상단의 숏크리트 타설지역에서 다수의 균열이 관찰되었다. 언급한 터널갱구부의 변위 및 응력패턴을 모사하기 위하여 유한차분법에 근거한 플랙을 사용하였으며, 세밀한 수치해석을 위해 편재절리모델을 도입하였다. 마지막으로, 터널갱구부의 균열에 영향을 미친 주원인에 대한 고찰을 다루었다.

  • PDF

Study on the Stability of Over Break in Tunnel (여굴이 큰 터널의 안전성에 관한 연구)

  • Kim, Dong-Baek;Kwon, Ki-Jun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.2 s.21
    • /
    • pp.45-50
    • /
    • 2006
  • When we build the tunnel, occasionally, the blasted section exceed the designed section because of geological properties and the lack of blasting technologies, and the exceed section is remained as over break after the construction of tunnel lining. When the underground water leaks with silt and clay through the cracks of rocks, the large over break cause a structural stability problem in tunnel, and the back charging of over break is very important subject, because the undoing of back charging cause the drop of crashed rocks and serious problem in the stability of tunnel lining. Therefore, the theory of blast is studied and purpose the structural analysis of back charging and propose the safe method about the drop of crashed rocks.

A study on smart inspection technologies and maintenance system for tunnel (터널 스마트 점검기술 및 유지관리 제도 분석에 관한 연구)

  • Jee-Hee Jung;Kang-Hyun Lee;Sangrae Lee;Bumsik Hwang;Nag-Young Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.6
    • /
    • pp.569-582
    • /
    • 2023
  • In recent years, the service life of major SOC facilities in south korea has exceeded 30 years, and rapid aging is expected within the next 10 years. This has led to a growing recognition of the need for proactive maintenance of these facilities. Consequently, there have been numerous research efforts to introduce smart inspection technologies into maintenance. However, the current system relies primarily on manpower for safety inspections and diagnostics, and on-site surveys rely on visual inspections. Manpower inspections can be time-consuming, and subjective errors may occur during result analysis. In the case of tunnels, there are disadvantages, such as the loss of social overhead capital due to partial closures during inspections. Therefore, institutionalizing smart safety inspections is essential, considering specific measures like using advanced equipment and updating qualifications for experts. Furthermore, it is necessary to verify and validate safety inspection results using advanced equipment before instituting changes. This could be achieved through national-level official research programs and the operation of verification and validation institutions. If smart inspection technology is introduced into maintenance, routine inspections of SOC facilities, such as tunnels, will become feasible. As a result, maintenance technology capable of early detection and proactive response to safety incidents caused by changes in facility conditions is anticipated.