The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.

자동차 생산시스템에 대한 Cost 변화분석

  • Kim, Tae-Ho;Gwon, Jeong-Hwi;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.11a
    • /
    • pp.516-526
    • /
    • 2005
  • 자동차 생산시스템에서 택트타임의 변화에 따른 원가분석을 실시하고 자동차 업체의 원가관리 방안을 연구하였다. 또한 납입시간에 따른 대기시간 및 원가분석을 하였다. 자동차 생산라인은 양상 체제이므로 무엇보다도 택트타임관리가 이익관리와 직결한다. 현장 인터뷰와 자료조사를 통해 수집된 자료와 정보를 토대로 하여 시뮬레이션 분석을 하였다.

  • PDF

Finite Element Analyses of Stamping Tact Spring and Operation of Tact Switch (택트 스프링 타발과 택트 스위치 작동의 유한요소해석)

  • 엄경근;이세형;오규환;이동녕
    • Transactions of Materials Processing
    • /
    • v.4 no.1
    • /
    • pp.17-27
    • /
    • 1995
  • The tact switch is widely used in electric and electronic products. The dome type tact spring is produced by stamping. Stamping of the tact spring and operation of the tact switch have been simulated by the elasto-plastic finite element method. The operating characteristics of the switch may be given by the relation between the operating force and stroke. For a given material, this is affected by two main factors. One is the geometry of dome spring which is determined by the geometry of stamping dies and the stamping pressure, and another one is the dimension of switch. From the calculation, it was possible to obtain the stamping conditions and switch dimension for a predetermined force-stroki relation And, the hoop stresses and effective strains distributions due to the stamping and during the operation of the switch indicate a possibility of cracking in the center and rim of dome spring.

  • PDF

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

A Study on the Application of TACT Planning & Scheduling in Finish Work of Apartment Houses (공동주택 마감공사에서의 택트공정관리 적용에 관한 연구)

  • Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.422-425
    • /
    • 2003
  • The purpose of this study is using a TACT planning and scheduling for apartment houses construction that have many of same units. Because using a TACT planning and scheduling is concluded time reduction at same units as apartment plan. The main contents of this study are 1) window and door work through the field study, 2) adjust worker assignment to minimize work time variation, and 3) an effect of working time through a case study. As a result, the total working time can be improved $21.2\%$ by using the TACT planning and scheduling. The stu요 recommends that 1) establish an accurate data between work period and resource, and 2) preparation to measures minimization of waiting time before using a TACT planning and scheduling.

  • PDF

Analysis of Boundary Conditions for Activities' Relationships in Linear Scheduling Model (선형 공정계획 모델의 액티비티 관계의 경계조건 분석)

  • Ryu, Han-Guk;Kim, Tae-Hui
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.23-32
    • /
    • 2011
  • Domestic leading construction companies has been establishing and performing TACT scheduling method, similar to linear scheduling model such as line of balance and repetitive schedule, and etc. in which repetitive construction works are involved like high-rise building. Linear scheduling model has been researched as a visual scheduling method presenting the work space and time information. Likewise scheduling constraints of CPM network such as finish-to-finish, start-to-start, finish-to-start, start-to-start, linear scheduling model also has the relationships constraints, namely boundary conditions, between activities. It is especially necessary to define the boundary conditions of the activities' relationships in order to apply the linear scheduling model to be compatible with the network schedule. Therefore, this research considers the boundary conditions between activities for establishing the linear scheduling model. This paper also applies the proposed boundary conditions to TACT schedule and then deduces the main considerations in order to establish and perform TACT schedule.

Improvement of Construction Process management dividing the work area reasonably in Building Construction (작업구역의 합리적 분할에 의한 건축 마감공사의 공정운영 개선)

  • Yoon You-Sang;Joung Young-Kwon;Suh Sang-Wook;Shin Dong-Woo;Kim Chang-Duk;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.59-65
    • /
    • 2003
  • The purpose of this study is to suggest a improved tact planning and scheduling by reliable Toning of work area in high-rise building construction. To do this, the characteristics of main work including electric & mechanical work were considered through the interview with field work forces. The content of the study is focused mainly on reliable work flow and rhythmical repetition of uniform resource quantity to manage effective tact planning & scheduling. And also the study recommends more implement of tact planning and scheduling to manage human resources successfully in repetitive building construction.

A Study on the Tact Management Using a Daily Report Information (작업일보 정보를 이용한 택트공정관리방안 연구)

  • Kim Sun-Kuk;Na Kwang-Soo;Kim Tea-Hui;Yu Jung-Ho;Lee Hyun-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.80-87
    • /
    • 2003
  • Recent construction projects, characterized by its complication and high-tech, requites highly efficient management efforts. Among others, labor management is very important due to various trades and increasing number of activities. Along with advanced information technology, Web-based construction site management systems are widely adopted in order to improve the efficiency of construction management. However, such information systems have mainly 2 (two) shortcomings. One is that the existing systems were developed and implemented not in subcontractor-centered way but in main contractor-centered way, though the daily construction information is mainly generated, gathered and reported by subcontractors. As a result, subcontractors seldom have access to such information systems. The other is that loss or omission of information may uclw during the information processing process, in which subcontractors have no direct access to such information system. This becomes a major reason of losing the reliability of the information in daily construction report. As a solution for these problems, this paper suggests a Web-based information system that is subcontractor-oriented and also suitable for tact schedule management.

Understanding and Implementation Strategy of Tact Time, Pitch Time and Cycle Time (택트타임, 피치타임, 사이클타임의 이해와 적용방안)

  • Choe, Seong-Un
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2011.11a
    • /
    • pp.557-561
    • /
    • 2011
  • The study proposes three types of production lead time according to the production or demand pattern. First of all, it discusses the difference of three lead times. While pitch time and cycle time are used in push system with process stock and mass conveyor production, the tact time is used in pull system like as JIT based lean production system.

  • PDF

Reengineering of TACT Process Management Analyzed on Task Information (업무정보 분석을 통한 TACT공정관리 프로세스 재설계)

  • Kim, Ok-Kyue;Park, Jun-Mo;Kim, Beop-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.113-124
    • /
    • 2012
  • TACT process reengineering is applied to the finish work of apartment buildings and extra tall buildings to conduct efficient process control in Korea. Non-systemized information on the performances, however, causes difficulties in building a database for such records and it takes long time to find the relevant information. In order to solve such problems, scientific and quantitative understanding on the construction information and data is required to perform TACT process reengineering satisfactorily and also proper management plan should be provided for the working level staff to understand the required information and data more easily. In this regard, this paper reorganizes the TACT process reengineering based on the general process control and classifies the items of required information to redesign. Redesigned process was verified by specialists making use of work-information matrix. As a result, paper contributed to increasing comprehension level of the working level people and when the persons in charge are transferred to other duty, it makes them understand all the working procedure faster, which enables the departments involved to carry out their cooperation and adjustment more efficiently.