• Title/Summary/Keyword: 타입 4 균열

Search Result 8, Processing Time 0.023 seconds

Crack Propagation Analysis for IMO Type-B Independent Tank with Liquefied Natural Gas Carrier (LNG 운반선에 적용된 독립형 탱크의 균열 진전 해석에 관한 연구)

  • Kim, Beom-il;Shafiqul, Islam MD
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.4
    • /
    • pp.529-537
    • /
    • 2021
  • Membrane-type hull and cargo holds have been designed and built for large ship. However, there is a growing interest in applying the same technology to small and medium-sized Liquefied natural gas(LNG) carriers to meet the recent increase in demand for LNG as an ecofriendly fuel and for expanding LNG bunkering infrastructure. The purpose of this study is to apply the IMO Type-B tank to small and medium-sized LNG carriers and verify the safety and suitability of the design. Fatigue crack propagation analysis was performed to install a partial second drip tray installed at the lower part of the LNG cargo tank by calculating the amount of leaked gas in the support structure supporting the cargo tank. First, a program for fatigue crack propagation analysis was developed, in which Paris' law and British Standard 7910 (BS 79110) were applied based on the International Code for the Construction of Equipment and Ships Carrying Liquefied Gases in Bulk, an international standard for LNG carriers. In addition, a surface crack propagation analysis was performed. Next, a methodology for assuming the initial through-crack size was developed to determine the size of the partial second barrier. The analysis was performed for 15 days, which is a possible return time after cracks are detected. Finally, the safety and suitability of the IMO Type-B for LNG cargo tanks required by international regulations were verified. For the accurate analysis of fatigue crack propagation, it is necessary to develop and verify the analysis procedure based on direct analysis and international regulations.

Experimental Study for the Improvement of an Automated PHC Pile Head Cutter (PHC 파일 두부정리 자동화 장비 개선에 관한 실험적 연구)

  • Lee Jeong-Ho;Kim Myoung-Ho;Kim Young-Suk;Cho Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.142-151
    • /
    • 2005
  • Several advanced countries have been continually developed PHC pile cutting automation machines for improving productivity, safety and quality of the conventional PHC pile cutting work. However, the target work of the previously developed PHC pile cutting automation machines is only crushing the head of PHC pile. Dangerous grinding work is still performed by workers with seven inch hand grinder. In domestic construction industry, the PHC pile cutting work is usually performed by a crusher and three to four skilled workers. Recent analysis results of the PHC pile cutting work reveal that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is labor-intensive work. The primary objective of this study is to propose the end-effector which can effectively break PHC pile without any longitudinal cracks and to develop an automated pile cutting machine having unified grinder and crusher parts through a wide variety of laboratory and field tests. It is anticipated that the development of the automated pile cutting machine would be able to bring improvements in safety, productivity, quality as well as cost saving.

Development of the Pilot Type Machine for Automation of PHC Pile Cutting Work (PHC 파일 두부정리 자동화를 위한 파일롯타입 장비의 개발)

  • Lee Jeong-Ho;Park Sang-Jun;Jeong Myung-Hoon;Kim Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.173-181
    • /
    • 2003
  • During the last few years, the use of Pre-tensioned spun high strength concrete piles(PHC pile) has been gradually increased in many construction sites. Cutting work of the concrete pile is an important task to crush a part of pile head which is compressed with more than 800$\cal{kg}f/cm^2$. It is usually performed by a crusher and three to four skilled workers. Recent analysis results of the pile cutting work reveal that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is labor-intensive work. The primary objective of this study is to propose conceptual designs for developing an automated pile cutting machine. It is anticipated that the development of the automated pile cutting machine would be able to bring improvements in safety, productivity, quality as well as cost saving.

Schemes to enhance the integrity of P91 steel reheat steam pipe of a high-temperature thermal plant (고온 화력 P91강 재열증기배관의 건전성 제고 방안)

  • Lee, Hyeong-Yeon;Lee, Jewhan;Choi, Hyun-Sun
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.16 no.1
    • /
    • pp.74-83
    • /
    • 2020
  • A number of so-called 'Type IV' cracking was reported to occur at the welded joints of the P91 steel or P92 steel reheat steam piping systems in Korean supercritical thermal power plants. The reheat steam piping systems are subjected to severe thermal and pressure loading conditions of coolant higher than 570℃ and 4MPa, respectively. In this study, piping analyses and design evaluations were conducted for the piping system of a specific thermal plant in Korea and suggestions were made how structural integrity could be improved so that type IV cracks at the welded joints could be prevented. Integrity evaluations were conducted as per ASME B31.1 code with implicit consideration of creep effects which was used in original design of the piping system and as per nuclear-grade RCC-MRx code with explicit consideration of creep effects. Comparisons were made between the evaluation results from the two design rules. Another approach with modification or reduction of the redundant supports in the piping systems was investigated as a tool to mitigate thermal stresses which should essentially contribute to prevention of Type IV cracking without major modification of the existing piping systems. In addition, a post weld heat treatment method and repair weld method which could improve integrity of the welded joint of P91 steel were investigated.

Behavior of the Embankment on Normally Consolidated Clay Supported by the Piled Raft (Piled Raft 기초로 지지된 연약지반 상의 제방의 거동)

  • Kim, Sang-Kyu;Song, Sun-Ok;Han, Sung-Gil;Jeon, Jin-Kyu;Lee, Wan-Sung
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.4
    • /
    • pp.33-41
    • /
    • 2011
  • A railway embankment route extending to 2 km was laid on normally consolidated clay in the West Gimhae Plain. This embankment was first built using the stage-construction technique, but longitudinal cracks suggesting arc sliding appeared on the surface of the embankment immediately after the first stage of its construction. As an alternative, the piled raft was installed on the failed embankment and then the remaining height of the embankment was raised. The behavior of the piled raft was monitored with different instruments during construction. This paper describes the monitoring results and analyses. The results show that if the pile group essentially exhibits the behavior of friction piles, the piled raft foundation performs well even in normally consolidated soft clay.

Cutting-Line Sensing Methods for an Automated Concrete Pile Cutter (파일 두부정리 자동화 장비를 위한 두부정리선 센싱 방법)

  • Kim, Sung-Keun;Kim, Young-Suk;Lee, Junbok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6D
    • /
    • pp.985-993
    • /
    • 2006
  • The use of prefabricated concrete piles have been gradually increased in many construction sites. One of main works for building a concrete pile foundation is to crush a part of pile head which is compressed with more than $800kg/cm^2$. A pile cutting work is usually performed by a crusher and three to four skilled workers. Recent reports on the pile cutting work reveal that a lot of cracks which significantly reduce the strength of the pile and are frequently made during pile cutting operations and it is very repetitive and labor intensive work. To improve productivity, safety, and quality of the conventional concrete pile cutting work, the research on developing an automated concrete pile cutter has been performed. In this paper, sensing methods for detecting a pile cutting line are suggested with operation process algorithms. The suggested methods are very important to develop the automated pile cutter. A pilot-type of the automated pile cutter that adopt one of the suggested sensing methods, is developed and tested in a construction site.

Fatigue Evaluation of Precast Concrete Deck Connection using Ultra-High Performance, Fiber Reinforced Concrete (초고성능 섬유보강 콘크리트를 적용한 프리캐스트 바닥판 접합부의 피로성능 평가)

  • Lee, Jun-Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.275-285
    • /
    • 2015
  • This experimental study presents the fatigue evaluation of a precast deck connected using Ultra-High Performance, Fiber Reinforced Concrete (UHPFRC). Four types of two identical large-scale specimens were fabricated with simplified splice rebar details which had a short splice length of ten times rebar diameter. The flexural behavior of each type of specimens until failure was investigated and fatigue behavior of the same type of specimens was then evaluated using two-million cyclic loading. In the flexural tests, tensile rebars exhibited the deformation exceeding yielding strain but failure mode related to the splice details was not observed in spite of such a short splice length. In the fatigue tests, damage was not appreciably accumulated by the cyclic loading except initial flexural cracks and the stress variations in tensile rebars was less than the allowable stress range. These experimental results demonstrate that all types of specimens exhibited acceptable fatigue performance and indicate that enhanced mechanical properties of ultra-high performance material permits to use a simplified splice details along with short joint width.

Assessment of the Damage in High Performance Fiber-Reinforced Cement Composite under Compressive Loading Using Acoustic Emission (AE기법에 의한 압축력을 받는 고인성 섬유보강 시멘트 복합체의 손상 평가)

  • Kim, Sun-Woo;Yun, Hyun-Do
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.5
    • /
    • pp.589-597
    • /
    • 2009
  • High Performance Fiber-reinforced Cement Composite (HPFRCC) shows the multiple crack and damage tolerance capacity due to the interfacial bonding of the fibers to the cement matrix. For practical application, it is needed to investigate the fractural behavior of HPFRCC and understand the micro-mechanism of cement matrix with reinforcing fiber. This study is devoted to the investigation of the AE signals in HPFRCC under monotonic and cyclic uniaxial compressive loading, and total four series were tested. The major experimental parameters include the type and volume fraction of fiber (PE, PVA, SC), the hybrid type and loading pattern. The test results showed that the damage progress by compressive behavior of the HPFRCC is a characteristic for the hybrid fiber type and volume fraction. It is found from acoustic emission (AE) parameter value, that the second and third compressive load cycles resulted in successive decrease of the amplitude as compared with the first compressive load cycle. Also, the AE Kaiser effect existed in HPFRCC specimens up to 80% of its ultimate strength. These observations suggested that the AE Kaiser effect has good potential to be used as a new tool to monitor the loading history of HPFRCC.