• 제목/요약/키워드: 타당성 분석단계

Search Result 490, Processing Time 0.026 seconds

Economic Analysis for a Tidal Power Plant Project using RETScreen - Focused on the Tidal Power Plant in Asan Bay (RETScreen을 활용한 조력발전 개발사업 경제성 분석 - 아산만 조력발전소 사례를 중심으로 -)

  • Kim, Min-Ock;Jeong, Keun-Chae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.152-163
    • /
    • 2013
  • In this research, we analyse the economic feasibility of a tidal power plant project which can efficiently generate mass, permanent, predictable, and homogeneous electric power. For the economic feasibility analysis, we used the RETScreen that is developed at the CANMET Energy Technology Center in Natural Resources Canada and widely utilized for analysing the economic feasibility and sensitivity of clean energy projects. Results from the feasibility and sensitivity analysis showd that the tidal power plant project in Korea has a enough economic feasibility, and its feasibility increases more as certified emission reductions price and electricity unit price increase. Based on the results from the feasibility study, we can solve the energy problems to be come in near future by constructing the tidal power plants in Korea more aggressively.

Decision Methodology for LNG Plant FEED Evaluation using Analytic Hierarchy Process (LNG 플랜트 프로젝트의 기본설계 평가방법에 관한 연구)

  • Park, Jong-Hwa;Cho, Dae-Myeong
    • Journal of the Korean Institute of Gas
    • /
    • v.20 no.3
    • /
    • pp.52-58
    • /
    • 2016
  • In this study, evaluation method for LNG plant FEED is suggested and its validity is confirmed using a well-known decision making technique of Analytic Hierarchy Process (AHP). It is a pairwise comparison technique which can be used when multiple options must be considered for a single decision making problem. In order to develop an objective decision methodology, various decision parameters, sub-parameters as well as the concept of scale of assessment were introduced, and its consistency among these parameters was also checked by calculating the consistency index (C.I.). The methodology suggested in this article will contribute in evaluation of LNG plant FEED with less bias and subjectivity associated with the decision making procedure.

Quantity-based Early Cost Estimation Model for Road Construction Projects (대표물량 기반의 도로공사 설계단계의 개략공사비 예측모델)

  • Kim, Du Yon;Kim, Byungil;Yeo, Donghoon;Han, Seung Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.373-379
    • /
    • 2009
  • Cost estimation in the early phase enables government to plan public budgeting more efficiently by providing information about construction cost. However, cost estimation in the early phase is difficult to predict because only a little information can be utilized. The cost estimation method now being used by the government is calculated by length of the road multiplied by unit cost per length and shows high error rate because it cannot reflect the unique characteristics of each project. As the project is being proceeded, level of available information also changed. So, reflecting available information of a project is important. This paper divided early phase into two parts : planning phase and early design phase, and developed cost estimation model considering level of available information of each phase. Total 143 cases are utilized to find influencing variables and develop cost estimation model and model validation is done by adopting required accuracy level. This cost estimation model reflecting level of available information can be applied to public budgeting, feasibility test, and comparison between routes.

An Analysis on the Characteristics of Each Phase's Risk Factors for High-Rise Development Project (초고층 개발사업 추진을 위한 단계별 리스크 요인의 특성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.103-115
    • /
    • 2016
  • The 106 buildings of 200 meters' height or greater were completed around the world in 2015 (CTBUH, The Council on Tall Buildings and Urban Habitat). They beat every previous year on record, including the previous record high of 99 completions in 2014. This brings the total number of 200-meter-plus buildings in the world to 1,040, exceeding 1,000 for the first time in history and marking a 392% increase from the year 2000, when only 265 existed. South Korea recorded three completions during 2015 - improving slightly over 2014, in which it had one. This study focused on the fact that high-rise building development project risks have not reduced in Korea in spite of numerous studies and measures. And it attempted to examine whether existing studies and measures have been presented on the basis of the accurate analysis of existing studies and measures and classify and analyze the characteristics of each phase' s risk factors in the hope that its results would be one reference point as to the measure to prevent high-rise building development project risks in the future. A high-rise building development project is the high risk project as compared with the low-rise project. Because a high-rise development project takes long and is very sensitive to the changing environment. Therefore, in order to succeed the project it becomes necessary to effectively manage the risk involved in the process of the high-rise building development project. The result of this study can be used as the guideline to make the risk management system for the high-rise development project.

Design and use of the Signification and Communication Analysis Frame for the Brand Logo Sign: based on the Social Media Brands (브랜드 로고 기호의 의미작용과 커뮤니케이션 분석 체계의 제안과 활용:소셜 미디어 브랜드 로고를 중심으로)

  • Kwon, Boh-Youn
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.6
    • /
    • pp.76-89
    • /
    • 2011
  • The first purpose of this paper is to design brand logo sign analysis frame, 'SCoL'(Analysis frame of signification and communication for the brand logo). It has semiotic view and communication function. And the second is to prove propriety of the suggested frame by application to social media brand logos. The SCoL frame is based on 4 features of logo sigh to have analytic consistency. Also, it covers whole semiological process with index, icon, symbol as signification understanding and reach communication step with Jakobson's theory. As the results, the findings are follow; The SCoL frame can be useful to get comprehensive semiotic understandings and communication functions about logo signs. The social media brands build their own meaning area with logo signs and they depend on different communication function.

Estimation of Induced Highway Travel Demand (도로교통의 유발통행수요 추정에 관한 연구)

  • Lee, Gyu-Jin;Choe, Gi-Ju
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.7 s.93
    • /
    • pp.91-100
    • /
    • 2006
  • Travel Demand Forecasting (TDF) is an essential and critical process in the evaluation of the highway improvement Project. The four-step TDF Process has generally been used to forecast travel demand and analyze the effects of diverted travel demand based on the given Origin-Destination trips in the future. Transportation system improvements, however, generate more travel, Induced Travel Demand (ITD) or latent travel demand, which has not been considered in the project evaluation. The Purpose of this study Is to develop a model which can forecast the ITD applied theory of economics and the Program(I.D.A) which can be widely applied to project evaluation analysis. The Kang-Byun-Book-Ro expansion scenario is used to apply and analyze a real-world situation. The result highlights that as much as 15% of diverted travel demand is generated as ITD. The results of this study are expected to improve reliability of the project evaluation of the highway improvement Project.

The Study on Determination of Benefit Factor as Constructing Traffic Facilities Using ANP (ANP기법을 이용한 교통시설 건설사업의 편익항목 선정에 관한 연구)

  • Kim, Man Kyeong;Jung, Hun Young;Lee, Sang Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.41-47
    • /
    • 2006
  • The construction of traffic facilities has generated a variety of problems in the equality and efficiency when it would be planed and evaluated. One of the reasons for these phenomena isn't the definition of an objective standard about benefit items. Thus, results of evaluation couldn't give a demonstration of confidence. But, the traffic facility construction and its operation costs are securely appeared. Therefor, it will be demonstrated to decide the benefit items in this study. Before deciding the items, user's satisfaction evaluation and economic analysis would be carried. We find out subway user's satisfaction higher than load traffic mode user in satisfaction evaluation, while subway's economic feasibility is lower than load facility, as a result of B/C analysis. In this inconsistent results, we found out that the benefit value is a little lower because of indefinite standard of it's items as comparing Busan Metropolitan City's population with subway's modal split ratio. Accordingly, we enumerate some benefit items in the case of feasibility evaluation as constructing traffic facility. And each of evaluation items' weight is estimated by using ANP. We found out that the weight value of accessibility has the highest one, that of punctuality has second, that of travel time has third, and benefit items according to improvement of user's traffic condition have much more important than those which were considered in the existence economic analysis.

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.

An Empirical Study on the Effects of Top Management Leadership for Big Data Success (빅데이터 성공에 최고경영층 리더십이 미치는 영향: 실증연구)

  • Park, Sohyun;Koo, Bonjae;Lee, Kukhie
    • Information Systems Review
    • /
    • v.18 no.2
    • /
    • pp.39-57
    • /
    • 2016
  • Previous studies on the success factors of big data implementation have called for future research and further examination of the top management leadership's impact. This research proposes and empirically tests three hypotheses, including how top management leadership can directly affect big data investment, how it can mediate the causal relationship between big data investment and idea usefulness, and how it can mediate the relationship between idea usefulness and business utilization. Based on the data collected from 108 big data users in Korean companies, we determined that all three hypotheses are statistically significant. By shedding light on top management leadership and its characteristics, we can provide better suggestions on what needs to be done to ensure the success of big data.

Efficiency Plan of Transportation Investment Appraisal System (국내 교통SOC 투자평가체계 효율화 방안)

  • Chung, Sung Bong;Namkung, Baek Kyu
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.4
    • /
    • pp.336-346
    • /
    • 2014
  • Recently interest and concern about the effectiveness of the transportation investment policy have been increasing because lots of transportation projects reflected to the National Transportation Plan are suspended or delayed during pre-feasibility study. For instance, the criticism such as overlap and deficiency in consistency in appraisal system were aroused because of the waste of budget, time and man-power etc. This is because the Korea government adopted pre-feasibility study for the purpose of efficient use of national budget, but the methodology and the appraisal contents are similar to the existing feasibility study. Also, the feasibility appraisal study was adopted in 1999 for the purpose of establishing efficient transport networks but the feasibility study has been substituting the function which should be conducted by feasibility-appraisal study. In this study, by reviewing the current situation and the purport of introducing these policies, the understanding of these policies could be increased. Then, the plans for improving the efficiency of transportation appraisal system are suggested in the context of strengthening the connectivity between these policies. This study is expected to play an important role in increasing the rationality, consistency and efficiency of transportation investment policies.