• Title/Summary/Keyword: 컴퓨터 공정계획

Search Result 56, Processing Time 0.029 seconds

Design and Analysis of Cell Controller Operation for Heat Process (열공정에 대한 셀 콘트롤러 운영의 설계와 해석)

  • So, Ye In;Jeon, Sang June;Kim, Jeong Ho
    • Journal of Platform Technology
    • /
    • v.8 no.2
    • /
    • pp.22-31
    • /
    • 2020
  • The construction and operation of industrial automation has been actively taking place from manufacturing plan to production for improving operational efficiency of production line and flexibility of equipment. ISO/TC184 is standardizing on operating methods that can share information of programmable device controllers such as PLC and IoT that are geographically distributed in the production line. In this study, the design of the cell controller consists of PLC group and IoT group that perform signals such as temperature sensors, gas sensors, and pressure sensors for thermal processes and corresponding motors or valves. The operation and analysis of the cell controller were performed using SDN(Software Defined Network) and the three types of process services performed in thermal processes are real-time transmission service, loss-sensitive large-capacity transmission service, and normal transmission service. The simulation result showed that the average loss rate improved by about 17% when the traffic increased before and after the application of the SDN route technique, and the delay in the real-time service was as low as 1 ms.

  • PDF

Accuracy of 5-axis precision milling for guided surgical template (가이드 수술용 템플릿을 위한 5축 정밀가공공정의 정확성에 관한 연구)

  • Park, Ji-Man;Yi, Tae-Kyoung;Jung, Je-Kyo;Kim, Yong;Park, Eun-Jin;Han, Chong-Hyun;Koak, Jai-Young;Kim, Seong-Kyun;Heo, Seong-Joo
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.48 no.4
    • /
    • pp.294-300
    • /
    • 2010
  • Purpose: The template-guided implant surgery offers several advantages over the traditional approach. The purpose of this study was to evaluate the accuracy of coordinate synchronization procedure with 5-axis milling machine for surgical template fabrication by means of reverse engineering through universal CAD software. Materials and methods: The study was performed on ten edentulous models with imbedded gutta percha stoppings which were hidden under silicon gingival form. The platform for synchordination was formed on the bottom side of models and these casts were imaged in Cone beam CT. Vectors of stoppings were extracted and transferred to those of planned implant on virtual planning software. Depth of milling process was set to the level of one half of stoppings and the coordinate of the data was synchronized to the model image. Synchronization of milling coordinate was done by the conversion process for the platform for the synchordination located on the bottom of the model. The models were fixed on the synchordination plate of 5-axis milling machine and drilling was done as the planned vector and depth based on the synchronized data with twist drill of the same diameter as GP stopping. For the 3D rendering and image merging, the impression tray was set on the conbeam CT and pre- and post- CT acquiring was done with the model fixed on the impression body. The accuracy analysis was done with Solidworks (Dassault systems, Concord, USA) by measuring vector of stopping’s top and bottom centers of experimental model through merging and reverse engineering the planned and post-drilling CT image. Correlations among the parameters were tested by means of Pearson correlation coefficient and calculated with SPSS (release 14.0, SPSS Inc. Chicago, USA) ($\alpha$ = 0.05). Results: Due to the declination, GP remnant on upper half of stoppings was observed for every drilled bores. The deviation between planned image and drilled bore that was reverse engineered was 0.31 (0.15 - 0.42) mm at the entrance, 0.36 (0.24 - 0.51) mm at the apex, and angular deviation was 1.62 (0.54 - 2.27)$^{\circ}$. There was positive correlation between the deviation at the entrance and that at the apex (Pearson Correlation Coefficient = 0.904, P = .013). Conclusion: The coordinate synchronization 5-axis milling procedure has adequate accuracy for the production of the guided surgical template.

A Study on the Molding Characteristics of Injection Compression Molding Through Computer Simulation (컴퓨터 해석을 통한 사출압축성형의 성형특성에 관한 연구)

  • Chun, Y.H.;An, H.G.;Lyu, M.Y.
    • Elastomers and Composites
    • /
    • v.47 no.4
    • /
    • pp.341-346
    • /
    • 2012
  • Injection molding is one of the widely used polymer processing operations. It is being used for not only conventional injection molding but gas injection molding, water injection molding, and injection compression molding. Injection compression molding involves injection and compression operation, and it gives uniform physical property and high dimensional quality of product. In this study, injection compression characteristics for various product shapes have been investigated by computer simulation. Product containing side wall showed not much effective in injection compression molding since wall thickness direction was perpendicular to the compression direction. Uniform and low shrinkage was observed in injection compression molding comparing conventional injection molding. Subsequently injection compression molding can be used for molding precise product. Optimal injection compression molding condition was obtained using design of experiment for plastic lens and the results were compared with conventional injection molding.

Development of Evaluation Modules for Evaluating Decommissioning Scenarious Using Digital Mock-Up System (디지털 목업 시스템을 이용한 해체 시나리오 평가용 해체공정 평가모듈 개발)

  • Kim Sung-Kyun;Park Hee-Sung;Lee Kune-Woo;Jung Chong-Hun
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.3
    • /
    • pp.265-273
    • /
    • 2006
  • In the decommissioning and decontamination(D&D) planning stage, it is important that the scenarios are evaluated from an engineering point of views because the decommissioning work has to be executed economically and safely by following the best scenarios. Therefore, we need to develope several modules to evaluate the decommissioning scenarios. In this paper, the digital mock-up system is constructed in the virtual space to simulate the whole decommissioning process. The schedule evaluating equation and cost evaluation equation are derived to calculate the working time and the expected cost. And in order to easily identify the radiation level about the activated objects, the radiation visualization module is developed. Finally, on the basis of the obtained results from the Digital Mock-up and other important factors, the evaluating method of the scenarios that can indicate the best scenario is described.

  • PDF

VLSI 설계와 CAD 기술개발 연구 전략 -다음 세대 컴퓨터 개발을 위한-

  • 이문기
    • The Magazine of the IEIE
    • /
    • v.11 no.5
    • /
    • pp.42-50
    • /
    • 1984
  • 국내의 다음세대 컴퓨터 개발을 위한 VLSI 설계와 CAD 분야에 대한 연구 방향을 제시한다. 연구의 목표는 국제적으로 경쟁할 수 있는 VLSI 설계능력과 백만개 정도의 트랜지스터로 자성된 회로를 경제적으로 설계하기 위한 CAD 기술과 System의 확립이다. ·새로운 회로 구조와 알고리즘에 대한 연구 · CAD 도구와 언어의 개발에 관한 첨단 CAD 기술개발연구 · VLSI 설계에 필요한 CAD 도구 이용과 개발에 필요한 표준 인터페이스, 네트워킹, 컴퓨팅 하드웨어. 시스템 소프트웨어에 대한 연구등의 부분으로 크게 나눌 수 있다. 이용 가능한 CAD system을 평가하고 개선하며 첨단 CAD에 대한 소프트웨어와 하드웨어에 대해 · 컴퓨팅 하드웨어 · 프로그램 분위기 · 네트워킹 능력 ·자료 교환을 위한 표준인터페이스 등에 관해 조사분석도 병행한다. CAD에 관한 세부적인 연구 과제는 · 시스템 사양언어 · 설계 검증 ·시스템시뮬레이션· 설계 합성 · 설계 해석· 설계 방법론·디바이스와 공정 모델링 프로그램 등이다. 고속 계산용 VLSI에 관한 구조와 알고리즘은 행렬 계산을 위한 ·분산 배열 처리 회로 ·시스토릭 (Systolic) 배열 회로 ·셀률라(Cellular) 논리 회로 · 3차원 배열 회로 와 · 비규칙적 계산 알고리즘을 갖는 VLSI가 있다. VLSI설계훈련과 CAD 기술 축적을 위해 CAD enter를 설립하여 전국적인 CAD 네트워킹을 관계 연구소와 여러 대학에 가설하며, MPC 계획을 추진한다. VLSI설계 가능성이 입증되면 VLSI 설계능력을 더욱 향상 시키기 위해 0.5∼1.0mm기술의 silicon faundary를 설립한다. 연구 개발 조직은 대학, 산업체. 연구소가 삼위일체가 되어 수행될 수 있도록 연구 개발 위원회를 설치 운영하며 경쟁적이며 경제적으로 연구 업무를 집행하는 것이 바람직하다.았다.형질에 관여하는 귀전자에 미치는 기구에 대하여 검토할 여타가 있다고 보여진다. 분해능의 특징으로 미루어 앞으로는 레이저를 이용한 계측 방법이 그 주류를 이룰 것으로 사료된다. 우선 본 해설은 기체의 온도 및 농도의 광학적 측정방법중 Raman산란광 검출법에 대하여 실제로 측정하는 입장에서 간단히 소개한다.lity)이, 높은 $GA_3$함량에 기인된다'는 주장은 본실험(本實驗)으로 부인(否認)되었다. 따라서, 응용학적(應用學的) 측면에서 고려해 볼 때, 리베스식물(植物)의 육종기간 단축을 위한 모든 화아분화(花芽分化) 촉진 조치는 P.J.-식물(植物)이 20. node이상 생육하였을 때 취하는 것이 효율적인 것으로 결론 지어진다.앞당겨진 7月 셋째 週였다. 8. Culex (Culex) tritaeniorhynchus summoro년의 最大發生 peak는 1981年, 1982年 모두 8月 둘째 週였다. 9. Anopheles (Anopheles) sinensis의 最大發生 peak는 1981年에 7月 다섯째 週, 1982年은 2週 앞당겨진 7月 셋째 週였다. 10. 重要 3種의 最大 peak를 比城하면 Culex (Culex) pipiens pallens와 Anopheles (Anopheles) sinensis는 1981年과 1982年 모두 最大 peak時期가 同一하였으며, Culex (Culex) tritaeniorhynchus summoro년는 2年間 모두 8月둘째 週에 나타났다.osterior to manubrium and anterior to aortic arch) replacing the normal mediastinal fat. (2) In benign thymoma, the marging of the mass was smooth and the normal fat

  • PDF

A Study on Evaluation System of Track Support Stiffness for Concrete Tracks (콘크리트궤도의 궤도지지강성 평가시스템에 관한 연구)

  • Choi, Jung-Youl;Kim, Man-Hwa;Kim, Hyun-Soo;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.535-541
    • /
    • 2020
  • A conventional elastic material replacement and performance evaluation are very complicated and time-consuming, and it is difficult to know when to replace the elastic material in advance. By comparing with the product limit and the functional limit, the necessity of elastic material replacement and the improvement of track support stiffness according to replacement can be immediately demonstrated based on experimental data. Using an evaluation system of track support stiffness, the performance evaluation data for elastic materials obtained through field tests using software for track support stiffness is integrated and managed on the administrator's computer. Therefore, the replacement plan is established and maintenance history is managed by identifying the replacement time and location of elastic materials. It is possible to evaluate the performance and condition of the elastic material at the various points during the working time of the track inspection and the track performance (track support stiffness) and durability of the elastic material (aging level, spring stiffness variation rate, etc.) at the operation condition. The elastic material could be replaced timely, and the deterioration of the elastic material can be continuously monitored.