• Title/Summary/Keyword: 커튼월 공사

Search Result 26, Processing Time 0.029 seconds

Efficiency Analysis for RFID-based Curtain Wall of unit Type Construction (RFID 기술 적용에 따른 유닛타입 커튼월 공사의 효율성 분석)

  • Kang, Hyun-Koo;Ha, Young-Seo;Lim, Chul-Woo;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.206-213
    • /
    • 2008
  • Due to the following reasons, the management of curtain wall parts and material is very Important. Firstly, curtain wall work is one of the main works in High-rise building construction for it takes about $10{\sim}15%$ of the total construction cost. Secondly, the whole process of curtain wall work including manu acture, delivery, storage, installation and maintenance is very complicated and sometimes more than 30 companies involve in the process. Thus there are many control points for curtain wall units. Thirdly, there are not enough space on site for material storage and this situation is more serious for sites in urban area. The purpose of this research is to validate an information systems using RFID technology that is developed to manage the curtain wall units following the process of curtain wall work. For the validation, the cycle times of curtain wall work before and a ter the system was used. The results show that using the systems shorten the cycle time of the curtain wall work. Thus it is concluded that the system can increase the efficiency of managing curtain wall work.

A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation (건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안)

  • Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.256-261
    • /
    • 2008
  • The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.

  • PDF

The Improvement of Curtain Wall Design Process using Value Stream Mapping Tools (VSM기법을 활용한 커튼월 공사의 설계 프로세스 개선)

  • Kim, Chang-Duk;Lee, Sang-Hyuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.128-137
    • /
    • 2006
  • This paper is to develop curtain wall process life-cycle system in high-rise buildings in order to establish effective cooperation communication channels among the diverse constituents. This paper is to provide a base toward a curtain wall life-cycle management system to support decision making and the effective flow in light of information and materials. The four objectives of the research are 1) the analysis of the current curtain wall life-cycle process, 2) the analysis and development of the curtain wall design process As-Is model, and 3) the Muda analysis of the design process As-Is model and the suggestion of the improvements, 4) the development of curtain wall design To-Be model and comparative analysis of the improvement in terms of value streams. This research indicates the wastes decrease (or the values increase) from 6.7% up to 100% in different decision criteria through the improvement by the comparative analysis between the As-ls and To-Be curtain wall design process. This research suggests the potential improvement by VSM and a curtain wall life-cycle management system in curtain wall construction for diverse constituents be significant.

Application of Supply Chain Management Concept to the Various Types of Curtain Wall Construction (커튼월의 공법 및 조달 유형에 따른 SCM 적용방안)

  • Moon Woo-Kyoung;Yun Soo-Won;Kim Yea-Sang;Chin Sangyoon;Park Ji-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.612-615
    • /
    • 2004
  • Today, the curtain wall is used in many construction projects because of excellent economical efficiency and constructability. The life-cycle process of curtain wall construction consists of the architectural design, curtain wall design, manufacturing, const겨ction, and maintenance phase which has become one of the most important objects that have to be managed. Since the general management method focused on each separated phase, it has accompanied many problems such as increases of the cost and duration, and loss of productivity. To solve these problems, it is necessa교 to have a new management method based on supply chain management. Thus this research analysed the processes of stick system, semi-unit system, unit system, and panel system classified by the type of the curtain wall, and suggested proper methods of application of SCM concept to each type of curtain wall construction.

  • PDF

A Study on directions of Developing a Transportation and Procurement System for JIT Management of Curtain Walls in High-Rise Building Construction (커튼월 공사의 적시생산(JIT)관리를 위한 양중 조달 시스템 개발방향에 관한 연구)

  • Yang Jong-Youb;Ahn Byung-Ju;Baek Jong-kun;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.371-374
    • /
    • 2002
  • Purpose of this study is to suggest the directions for development of a transportation and procurement system for JIT management of curtain walls. First, this study looks over the concept of JIT, and grasps the characteristics of the material and the problems of logistics in the construction field through the field and literature survey. And then, it develops countermeasures for the problems and with this, it suggests the directions for development of a transportation and procurement system for JIT management.

  • PDF

A Study on Participation of Consultant in Curtain Wall Construction (커튼월 공사에서의 단계별 컨설턴트 참여방안 연구)

  • Yoon Hyung-Soo;Yi Dong-Seob;Koo Cho-Jin;Hyun Chang-Tack
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.618-621
    • /
    • 2003
  • The purpose of this study was to propose the participation of consultant pertinent to ground situations. The careful consideration of participating consultant reduces life cycle cost. duration and improves quality. The first step is studying Curtain-wall construction process by researching the documents, and Second step is analyzing Curtain-wall construction's problem through having a interview with a concerned experts (Architect, Gene-con, Sub-con. Consultant). Then we study how consultant solves the problem, propose the way of participation of consultant. The way of participation consist of three phases. the first one is to participate in design & construction process and the second one is to participate in design process, the third one is to participate in construction process. These participations are decided by evaluating project, design phase. construction phase. The verification of these participating strategies was implemented by the interview with the experts.

  • PDF

Automated Life-Cycle Management System Based on SCM for Super High-rise Buildings Construction (SCM기반 Automated Life-Cycle Management System 구축방안 - 초고층 빌딩 커튼월을 중심으로 -)

  • Yoon Jeong-Hwan;Kim Yea-Sang;Chin Sang-Yoon;Kim Chang-Duk;Choi Yoon-Ki;Chun Jae-Youl;Lim Hyung-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.430-433
    • /
    • 2003
  • Cost, schedule, quality are the essential parts of success of every construction project. It is especially true in high-rise building construction. Among the construction components in high-rise building construction, curtain walls are very important elements for the project success because they take large portion of cost and schedule. However, curtain wall construction process are very complicated, where many entities including designers, suppliers, contractors and even maintenance contractors are involved. Therefore, control and management of their relationships and production process are critical. It is suggested that this can be solved by the concept of Supply Chain Management which is supported by the automated information technology with Radio Frequency Identification. Such concept is defined as 'Automated Life-Cycle Management System Based On SCM' and this study suggests rode map to establish the system.

  • PDF

A Study on the Application of Supply Chain Management in Curtain Wall Engineering (커튼월 공사에서의 공급사슬관리 적용에 관한 연구)

  • Park Sang-Woo;Park Sang-Jun;Kwon Won;Kim Chang-Duk;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.301-304
    • /
    • 2004
  • The curtain wall engineering of local high-rise buildings consists of many phases such as design, curtain wail design, manufacture, procurement, construction and facility management, each of which also involves many' actors such as architect, curtain wall consultants, manufacturers, contractors, and facility managers. Moreover, the method for controlling the C/W process of each participant is needed. Eliminating wastes and problems existed in the C/W process can be more effective. What is more, it is necessary to improve the efficiency of the current process and to strengthen the competence through application of SCM to the C/W life-cycle. In addition, it is important that a ]ot of information transfer smoothly and share through information system. Therefore, this study aimed to propose the scope of application and the improvement directions in applying Supply Chain Management concept.

  • PDF

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

Construction of Aluminum Curtain Wall with 3D Elevation for TRUTEC Building (트루텍 빌딩의 3차원 입체 커튼월 시공)

  • Park, Choel;Hong, Doo-Pyo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.119-122
    • /
    • 2007
  • TRUTEC building, which is located at DMC B block is zone, is just one the office building in Soeul. TRUTEC building is designed by Barkow Leibinger Architeken in Germany, has 5 stories under and 12 stories above and has been finished with the unique three dimensional curtain wall unit. Big trial to make unique elevation succeeded as getting rid of the typical plain curtain wall unit. In addition, aluminum bars are treated by the latest CNC machine in order to achieve 3D section. Construction of curtain wall is highly focused from the moment of contract to keep the schedule because the contract period is 18 months. Regular design meeting and technical meeting between stakeholders including construction manager, designer, engineer, consultant and so on have been held during the construction to minimize the risks from the unique elevation and trial. Step by step mock-up test (design mock-up and visual mock-up on site) has been performed before functional mock-up test.

  • PDF