• Title/Summary/Keyword: 추진 단계

Search Result 1,476, Processing Time 0.025 seconds

Policy Process and Conflict Management of Local Government -A Case of Namyangju City's Landfill Site Construction for Incineration Remnants- (지방정부의 정책추진과 갈등관리 -남양주시 소각잔재매립장 입지선정 및 건설갈등 사례-)

  • Kang, Moon-Hee
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.11
    • /
    • pp.156-172
    • /
    • 2011
  • The purpose of this paper is to highlight the importance of conflict management by local government by explaining a peculiar case of Namyangju city's construction project of landfill site for incineration remnants. Policy stage and internal dynamics of conflict between city and opposition group of local residents are used as major tools of case observation. From this analysis, this study finds that the conflict management effort of local government is critical to bring a success of a public policy. The local government needs to assess possible sources of conflict, and to prepare reasonable solutions through sincere communication with local residents. Also we need to reconsider the concept of administrative efficiency. Sometimes "slow" is better than "fast". Authoritative and hasty policy process may face unexpected obstacles, then consume more time to fulfill the policy goals. It means that the local government needs to spend more time for policy formulation. It also shows the importance of democratic process in reaching a public policy decision. In conclusion, this study confirms that the cooperative relationship between local government and residents, so-called governance, is the key to the success of public policy.

A Study on the Flow Control for Stable Combustion of Liquid Rocket (액체로켓의 연소안정을 위한 유량공급에 관한 실험적 연구)

  • Jang, Eun-Young;Park, Hee-Ho;Kim, Sun-Ki;Kim, Yoo
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.4 no.2
    • /
    • pp.6-11
    • /
    • 2000
  • In the pressurized propellant feed system of liquid rocket, feed pressure is decided chamber pressure of normal combustion state. However, during ignition period the initial chamber pressure is atmosphere. So, it may have overflow, hard-start and even critical damage of engine. This paper proposes an improved propellant feed system for the stable combustion of liquid rocket. Hot test were already performed to verify the presented propellent feed system. The proposed propellant feed system uses two steps - pre and main combustion - to prevent large pressure increase and uses cavitating venturis for stable flow rate in whole combustion. This system feeds the flow rate lesser than the designed flow rate, so combustion pressure reached pre-combustion pressure. Cavitating venturis offer unique flow control capabilities at normal and abnormal combustion state, because flow rate is solely dependent on upstream absolute pressure and fluid properties, but independent on downstream condition.

  • PDF

A Study on the status and improvement of construction management in Daegu Gyeongbuk Institute of Science & Technology (대구경북과학기술연구원의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Kim, Hwa-Bong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.32-38
    • /
    • 2007
  • Recently The public project ordering is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. The CM services of project all phase excepts a planning business are performed. But recently the CM services of project all phase including a planning business are increasing every year. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the planning business management, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Daegu Gyeongbuk Institute of Science & Technology.

  • PDF

AHP Analysis for the effect of TPM Activity factors (TPM활동요인의 효과에 대한 AHP분석)

  • Yeon, Keyong Hwa
    • Journal of Digital Convergence
    • /
    • v.12 no.2
    • /
    • pp.111-117
    • /
    • 2014
  • Generally, TPM activity promotion program steps have been determined. However, in order to maximize the efficiency of the production system of TPM, industry types or production methods, equipment type and condition, the problems facing the environment are so different that tips and procedures should be chosen in the right way for each company to promote. This study is aimed at a manufacturing company promoting TPM KSA presented. The TPM activities are broken into two phases. And we employ the AHP method to analyze which phase of activities are more important to recognize than the other phase of activities. In Step 1 of the analysis of TPM activities, promotion improvement is the most important activities of the individual, and the overall activity of the most important activities are the field improvement and loss improvement, then followed by the basic conditions for the preparation and 5S activities to build a system activity, such as the order of the initial cleaning was analyzed.

A Study on Development of the Dual-thrust Flight Motor for Enhancing the Hit Probability (명중률 향상을 위한 이중추력형 비행모터 개발에 대한 연구)

  • Kim, Hanjun;Kim, Eunmi;Kim, Namsik;Lee, Wonbok;Yang, Youngjun
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.18 no.4
    • /
    • pp.74-80
    • /
    • 2014
  • This paper describes the development of the dual-thrust flight motor for enhancing the hit probability of unguided rockets. We designed dual-thrust flight motor by shape modification of the double base propellant with high burning rate, and confirmed the dual-thrust performance by static firing tests. The test results showed the thrust ratio of about 1:7.6 between sustaining phase and boosting phase, and had a quietly normal dual-thrust characteristics. And the results showed that there was not the fire extinction phenomenon of propellant due to the pressure drop.

A Study on Implementation Plan for AI Service Impact Assessment (인공지능 서비스 영향평가 추진방안에 대한 연구)

  • Shin, Sunyoung
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.5
    • /
    • pp.147-157
    • /
    • 2022
  • The purpose of this study is to establish policy recommendations for the promotion of AI service impact assessment based on the definition of impact assessment and analysis of domestic and foreign AI service impact assessment cases. The direction of implementation was analyzed based on the case of impact evaluation promoted in various fields at home and abroad and the case of impact evaluation at home and abroad of artificial intelligence services. As a step-by-step implementation plan, in the first stage, quantitative indicators such as AI level survey-based economic effects are developed, and in the second stage, information culture such as safety and reliability and artificial intelligence ethics described in the Framework Act on Intelligence Information, social, economic, information protection, and people's daily lives are prepared. In the third stage, discussion on detailed metrics and methods will be expanded and impact assessment results will be evaluated. This study requires analysis through various participants such as policy designers, artificial intelligence service developers, and civic groups in the future.

SK텔레콤의 성공적인 다운사이징 사례;U.Key의 탄생

  • Jang, Si-Yeong;Lee, Sang-Gu
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.309-315
    • /
    • 2007
  • SK텔레콤은 급변하는 이동통신시장 환경의 변화에 적절히 대응하기 위하여 지난 10여 년간 사용해 온 메인프레임 기반의 COIS 시스템을 중단하고 Unix 기반의 NGM 시스템으로 다운사이징하기로 결정하였다. 2002 년 9 월 SK 텔레콤은 차세대 IT 인프라 혁신 전략 프로젝트를 완료하고 이에 근거하여 2003 년 말 1 단계 프로젝트를 추진하게 된다. 그러나 개발 툴의 문제점, Governance 의 확보 실패 등 문제점이 계속 누적되어 2005년에 접어들어서는 총체적 난국 상황에 봉착하게 되었다. 2005 년 2 월 자체 점검 결과 개발 진척도는 50%에 불과한 상황이었다. 결국 2005 년 3 월, NGM 추진본부는 프로젝트의 추진 중단을 선언하기에 이르렀다. NGM 프로젝트는 처음부터 재 검토하여 Re-planning 을 실시한 후 구축을 재개하기로 결정하였다. 2005 년 5 월 NGM 프로젝트의 Re-plan 이 수립되었다. 우선 Turn-key 방식의 문제점을 해소하기 위하여 SK 텔레콤이 구축의 총책임을 떠맡고, SK C&C 가 시스템 이행에 대한 책임을 지는 Governance 체제를 확립하였다. 또한 2 단계 프로젝트에서는 NGM 프로젝트를 기술적으로 원점부터 재 검토하여 이전과는 근본적으로 다른 In-House 구축 접근방식을 채택하기로 하였다. 2 단계 프로젝트에서 관심을 집중한 기술적 의사결정 영역은 크게 (1) 미들웨어 및 개발프레임워크의 적용, (2) DB 아키텍처의 결정 및 슬림화, (3) 시스템 성능 개선 등의 세 분야로 집약할 수 있다. 이 논문에서는 이들 각각의 분야를 구체적으로 검토하였다. 결국 2006 년 10 월 9 일 메인프레임 기반의 COIS 는 Shut-down 되어 가동을 멈추었고, Unix 기반의 NGM 시스템이 가동을 개시함으로써 차세대 마케팅을 본격 추진하기 위한 다운사이징 프로젝트가 성공적으로 완수되었다.

  • PDF

TTA 2.3GHz 휴대인터넷 프로젝트그룹(PG302)

  • Hong, Dae-Hyeong
    • TTA Journal
    • /
    • s.103
    • /
    • pp.41-45
    • /
    • 2006
  • 2.3GHz 휴대인터넷 프로젝트그룹(PG302)에서는 차세대 성장동력으로 각광을 받고 있는 휴대인터넷 (WiBro) 기술의 상용 서비스에 대비하여 표준화를 성공적으로 추진해왔다. 국내 표준화를 위하여 2단계의 제정및 개정과정을 거쳐 2005년 말에 휴대인터넷 표준을 완성하였다. 또 국제 표준화를 위하여 광대역 무선 접속에 대한 표준화를 추진해온 국제표준화 기구인 IEEE 802.16 WG과 협력관계를 구축하여 WiBro 표준의 국제화를 성공적으로 달성했다. 현재는 WiBro 서비스를 경제적으로 제공하기 위해 요구되는 상호호환성 및 적합성 시험(IOT/RCT) 규격의 표준화를 활발히 진행하고 있다. 또 휴대인터넷과 다른 망과의 연동을 위한 표준, USIM 기반의 휴대인터넷 상호 인증 표준의 제정을 추진하고있다. 2006년부터는 관련 국제 표준화 움직임과 행보를 같이 하여, 시험 표준인 IOT/RCT 규격에 대한 국제 표준화도 추진할 예정이다. 또 향후 성능이 향상된 차세대 휴대인터넷 서비스의 제공을 위한 3단계 표준화도 함께 진행하여 ITU-R 등을 중심으로 국제적으로 이루어질 IMT-Advanced 표준화에 대응할 예정이다.

  • PDF

The Trend of the U.S. DoD EA and a Suggestion for the Korean MND EA (미군 EA 추진동향과 한국군 EA 발전방향)

  • Suh, Hyung-Joon;Choi, Jong-Sup;Suh, Ye-Young
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.97-102
    • /
    • 2006
  • 정보시스템의 효율적 도입 및 운영 등에 관한 법률이 2005년 12월 고시됨에 따라, 우리 군은 국방부를 중심으로 EA 도입과 적용을 위한 준비 단계에 있다. 본고에서는 미군의 EA 도입사례와 한국군의 EA 추진 현황을 조사하고, 국방 EA의 단계적 도입을 위한 발전방향을 모색하였다. 미군은 4개의 임무영역으로 나누어 EA를 구축하고 있다. 우리 군도 2002년부터 추진해 온 아키텍처 관련 노력을 발전시켜 조직간 업무분장, 범정부 산출물과 국방부 산출물간의 관계 등이 개선이 필요하며, 무엇보다도 최고의사결정자의 관심과 지원을 통해 국방 EA를 추진하여야 할 것이다.

  • PDF

WiBro기술이 IEEE 802.16 표준으로 채택되기까지

  • Yun, Cheol-Sik
    • Information and Communications Magazine
    • /
    • v.25 no.3
    • /
    • pp.60-63
    • /
    • 2008
  • WiBro 기술이 IEEE 802.16e 표준으로 채택되기까지의 과정은 크게, 국내표준이 우선되던 단계(2002. 11$\sim$2004. 6.)와 IEEE 802.16을 중심으로 국제표준에 힘쓰던 단계(2004. 7.$\sim$2005. 12.)으로 나누어서 볼 수 있다. 첫 번째 단계는 정부에 의한 비활성화된 2.3-2.4 GHz WLL용 주파수 대역의 회수 및 활용을 위한 WiBro 개념의 도입부터, ETRI를 중심으로 한 연구개발 프로젝트의 추진, TTA 내의 PG302 프로젝트그룹의 결성 및 적극적 국내표준화 활동을 통한 표준초안의 개발까지의 과정에 해당된다. 이 과정에서 개념의 창출부터, 요구사항의 정의, 방식의 선정, 규격 초안의 개발까지의 과정을 독자적으로 수행하였으며, 독자 기술에 의한 국내 기술의 개발 및 표준화를 바탕으로 국제표준화를 추진하기 위한 꿈과 도전의 시기였다고 할 수 있다. 두 번째 단계는 규모의 경제의 실현 및 국제표준의 중요성에 대한 인식에 따른 IEEE 802.16e를 중심으로 한 국제표준화의 추진을 통한 표준 IPR의 확보 및 시험 규격 등 제반 규격의 정비 등 세계 최초 상용화를 위한 표준선도의 시기였다고 할 수 있다. 나름 아쉬움이 없는 것은 아니나, 우리 힘으로 여러 난관들을 극복하고 상용화 및 IMT-2000 국제표준채택을 통한 세계화의 실현 등을 위한 성숙의 시기였다고 할수 있다. 이제 4세대 이동통신 표준화에서도 대한민국이 주도적인 역할을 수행해야 할 때이다. 좀 더 우리의 역량을 결집하고 발휘할 수 있도록 지혜를 발휘하여야 한다.