• Title/Summary/Keyword: 추진방식

Search Result 1,272, Processing Time 0.026 seconds

A Study on the Construction for Transfer System between Tram and Public Traffic System - In the Place of Changwon Area - (노면전철과 대중교통수단 간의 환승체계 구축에 관한 연구 - 창원 지역을 중심으로 -)

  • Choi, Yang-Won;Park, Do-Yun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.1
    • /
    • pp.273-286
    • /
    • 2013
  • Recently, due to problems with subway and bus operations, a need has emerged for a solution such as the introduction of an Advanced Transit System. In several municipalities, systems have been introduced using light rail as AGT urban aesthetics construction. There is high inhibition and civil cases are delayed by more environmentally friendly and accessible remedies. For the purpose of this study, Changwon city would be transformed to have an environmentally friendly transportation system such as a tram with an overview. Features, advantages, and disadvantages are analyzed, and systems are established the existing public transport routes by transfer system. Changwon city's tram plan is first step in open in year 2018, and second step with the opening goal of the year 2021, and the total line length of 33.9 km, the station will be built in the 38 locations. and also in 2011 a feasibility study, evaluated a low economic as B/C to 0.88, but it evaluated the high value of the policy analysis as AHP to 0.502. However, introduction of a tram project that should precede the as following condition. The first step in Changwon city's tram plan would be as follows : The introduction of the tram system would demand traffic management along with a restructuring of the bus system, and the tram system would be selected for domestic realities. Secondly, the introduction of trams would comprehend the advanced traffic composition in accordance with the consensus of the citizenship, and a legal system should be established for the introduction of the trams.

A Study on the Design Development and Construction Process in British Airways London Eye (런던아이의 디자인 전개와 건립과정에 관한 연구)

  • Woo, Dae-Seung
    • Journal of architectural history
    • /
    • v.15 no.1 s.45
    • /
    • pp.7-27
    • /
    • 2006
  • This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.

  • PDF

A Study on the Improvement of 1/1,000 Digital Map Construction System (1/1,000 수치지도 구축체계 개선방안 연구)

  • Park, Chan Hyeok;Song, Yeong Sun;Kim, Won Dae;Lee, Sang Ho
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.24 no.4
    • /
    • pp.29-38
    • /
    • 2016
  • The maps produced by the NGII(geographical information institute) are composed of 1/1,000, 1/2,500, 1/5,000 large scale maps, 1/25,000, 1/50,000 and smaller scale maps. 1/1,000 digital map, as the most large-scale digital map made by the NGII, has been constructed with the beginning of NGIS(national geographic information System) Project in 1995. However, 1/1000 digital maps have been not produced by the fundamental survey on the basis of systematic planning at the national level, but a lot of parts have been constructed by the public survey for the purpose of the fiscal year of the local governments. Also, these maps have been not regularly updated because of big budget. In this study, we investigated problems related to the construction status, system, and area, and suggested plans that can improve these problems. As the improvement plan, we proposed a nationwide three regionalization for short-term modification and long-term regular update, reset of core downtown boundaries based on topographical features, diversification of budget execution method and an improved execution system.

A Study on the Political Leadership of Xi Jinping: Focusing on Max Weber's Political Domination Type (시진핑의 정치리더십에 관한 연구: 막스 베버의 정치지배유형을 중심으로)

  • Chung, Tae-Il;Sun, Yifei
    • Korea and Global Affairs
    • /
    • v.1 no.2
    • /
    • pp.129-148
    • /
    • 2017
  • The political system of Xi Jinping which was launched in 2013, faced many difficulties both domestically and internationally. Xi Jinping must integrate and stabilize society through political reforms, such as sustained economic growth and Resolved corruption. In addition, he should seek new relations with the United States on the denuclearization of the Korean peninsula. Therefore, this study analyzed political leadership of Chinese political leaders including Xi Jinping using Max Weber 's political domination type. From the first generation political leaders to the fourth generation political leaders in China, the types of political domination of the first and second generation political leaders tend to be charismatic rather than legitimate domination. But the third generation political leaders tend to have a tendency of traditional domination rather than legitimate domination, and the fourth generation political leaders have a tendency to dominate more than traditional domination. On the other hand, the type of political domination of Xi Jinping shows traditional domination and legitimate domination tendency in the process of political growth and emergence, but shows tendency of charismatic domination after domination of political power.

Dynamic Response Analysis of Pneumatic Floating Breakwater Mounted Wave-power Generation System of Oscillating Water Column (진동수주형 파력발전시스템을 탑재한 공기주입식 부유식방파제의 동적거동해석)

  • Lee, Kwang-Ho;Kim, Do-Sam;Jung, Ik-Han
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.29 no.6
    • /
    • pp.305-314
    • /
    • 2017
  • Ocean wave energy harvesting is still too expensive despite developing a variety of wave energy converter (WEC) devices. For the cost-effective wave energy harvesting, it can be an effective measure to use existing breakwaters or newly installed breakwaters for both wave control and energy harvesting purposes. In this study, we investigated the functionality of both breakwater and wave-power generator for the oscillating water column (OWC)-type wave energy converter (WEC) installed in a pneumatic floating breakwater, which was originally developed as a floating breakwater. In order to verify the performance of the breakwater as a WEC, the air flow velocity from air-chamber to WEC has to be evaluated properly. Therefore, air flow velocity, wave transformation and motion of floating structure was numerically implemented based on BEM from linear velocity potential theory without considering the compressibility of air within the chamber. Air pressure, meanwhile, was assumed to be fluctuated by the motions of structure and the water level change within air-chamber. The validity of the obtained values can be determined by comparing the previous results from the numerical analysis for different shapes. Based on numerical model results, wave transformation characteristics around OWC system mounted on the fixed and floating breakwaters, and motions of the structure with air flow velocities are investigated. In summary, all numerical results are almost identical to the previous research considering air compressibility. Therefore, it can be concluded that this analysis not considering air compressibility in the air chamber is more efficient and practical method.

A Study on the Smart Workers' Perception of the Boundary Strength Between Work and Nonwork (스마트워크 이용자의 업무와 비업무간 경계 강도 인식에 관한 연구)

  • Kim, Yong-Young;Oh, Sangjo;Lee, Heejin
    • Information Systems Review
    • /
    • v.15 no.3
    • /
    • pp.71-87
    • /
    • 2013
  • Companies as well as the Korean government show growing attention to the Smart Work which is enabled by the ongoing development of information and communication technologies (ICTs). Smart Work can be regarded as an extended version of telecommuting or distance work and defined as "working efficiently and conveniently regardless of time and place utilizing ICTs." Smart Work currently puts its emphasis on the work and life balance by changing the ways of working. Despite its emphasis on work and life balance, it is expected the boundaries between work and nonwork would blur, work and nonwork boundaries may become more permeable, and role conflicts would occur more times than before. To find ways to enhance work and life balance while escaping from expected conflicts in the context of Smart Work, we investigate the work and nonwork boundary strengths and the factors affecting them. In the course, we consider asymmetries between the work and nonwork boundary strengths and bidirectional nature of work and nonwork permeability. We develop two research models having work and nonwork boundary strengths as respective dependent variables. We empirically found that work role identification and nonwork-to-work permeability had influences on the boundary strength at work and that work-to-nonwork permeability affected the boundary strength at nonwork. However, nonwork role identification did not show any significant influence on the boundary strength at nonwork.

  • PDF

지표환경변화 추적을 위한 훕스굴 시추사업 현황

  • 김정찬;김주용;양동윤;남욱현
    • Proceedings of the Korean Quaternary Association Conference
    • /
    • 2004.06a
    • /
    • pp.49-50
    • /
    • 2004
  • 푸른 진주라 불리는 훕스굴호는 러시아 국경에 인접한 몽고 북부의 청정호수로 해발 약 1,645m 지점에 위치한다. 훕스굴호의 길이는 약 136km이고, 폭은 20-40km이며, 최대수심은 약 262m 이다. 이 호수의 물은 세계에서 가장 깨끗한 담수 중 하나로 몽고 지표수원의 약 70%를 공급하고 있다. 훕스굴호는 바이칼 열곡대내에 형성된 일종의 구조호로 약 240만년 내지 400만년전에 형성된 것으로 추정되고 있다. 훕스굴호는 자연공원으로 지정되어 보호되고 있으며, 따라서 호수의 유역은 다행스럽게도 인간활동에 오염되거나 교란되지 않아 다양하고 흥미로운 육상/수성 생물상을 보유하고 있으며, 퇴적물 기록 역시 후기 신생대 동안의 중앙아시아의 지구환경 및 기후변화 연구에 매우 적합하다. 바이칼 시추사업 (Baikal Drilling Project)은 신생대 후기 동안의 중앙아시아의 지구조진화 및 전지구적 기후변화를 규명하기 위해 미국, 러시아, 일본, 독일 등이 참여한 다국가 공동사업이다. 바이칼 시추사업 연구팀은 지난 15년간 많은 노력과 예산을 투자하여 바이칼 호로부터 총 1,600m에 이르는 방대한 양의 퇴적물 코아를 성공적으로 회수하였고, 이 시료를 이용하여 후기 신생대 동안의 중부 유라시아 대륙의 고기후/고환경 진화과정을 성공적으로 규명하였다. 바이칼 시추사업이 성공적으로 진행됨에 따라, 이 사업에 참여했던 러시아와 일본의 과학자들은 바이칼호의 서쪽에 위치한 몽고 북부의 훕스굴에도 많은 관심을 가지게 되었으며, 동시에 바이칼 시추사업의 후속사업으로 훕스굴 시추사업을 새롭게 추진하게 되었다. 한편, 대륙내부에서의 제4기 지구환경 및 기후 변화 과정에 많은 관심을 가지고 연구해 오던 한국지질자원연구원도 2003년에 정식 회원으로 훕스굴 시추사업에 합류하였다. 훕스굴 시추사업 연구팀은 몽고의 지질광물자원연구소 (대표연구기관), 러시아의 지구화학연구소, 일본의 나고야대학교 그리고 한국의 지질자원연구원 등 4개국의 연구기관으로 구성되어 있다. 이들 4개 연구기관은 시추획득 및 기초연구 수행에 필요한 연구비를 현금 혹은 현물 (장비 포함)의 형태로 공동부담하고 있으며, 따라서 획득한 시추코아에 대해서도 각 연구기관이 전 구간에 대해 동일하게 25%의 소유권을 가지고 있다. 훕스굴 시추사업은 2008년까지 수행될 계획이며, 시추작업은 2005년까지 완료될 계획이다. 연구 진행과 관련하여, 공동연구의 명분을 높이고 분석의 효율성을 높이기 위해서 시료채취 및 기초자료 획득은 4개국의 연구원이 모여 공동으로 수행한 후의 결과물을 서로 공유하고, 자세한 전문분야 연구는 각 국의 대표기관이 독립적으로 수행하는 방식을 택하였다. 훕스굴에 대한 제1차 시추작업은 2004년 3월 말에 실시하였다. 시추작업 결과, 약 80m의 시추 코아가 성공적으로 회수되어 현재 러시아 이르쿠츠크 지구화학연구소에 보관중이다. 이 시추코아는 2004년 8월 중순경에 4개국 연구팀원들에 의해 공동으로 기재된 후에 분할될 계획이다. 분할된 시료는 국내로 운반되어 다양한 전문분야별 연구에 이용될 것이다. 한편, 제2차 시추작업은 2004년 12월에서 2005년 2월 사이에 실시될 계획이다. 수백만년에 이르는 장기간에 걸쳐 지구환경변화 기록이 보존되어 있는 훕스굴호에 대한 시추사업은 후기 신생대 동안 유라시아 대륙 중부에서 일어난 지구환경 및 기후변화를 이해함과 동시에 이러한 변화가 육상생태계 및 지표지질환경에 미친 영향을 이해하는데 크게 기여할 것이다.

  • PDF

The Effect of Social Discount Rate Manipulation on the Economic Feasibility Tests: Focusing on the Environmental Public Investment Projects (사회적할인율 조정이 공공투자사업의 경제성 평가에 미치는 영향: 환경투자사업을 중심으로)

  • Kim, Sang Kyum
    • Journal of Environmental Policy
    • /
    • v.12 no.4
    • /
    • pp.71-92
    • /
    • 2013
  • Unlike general public investment projects, when it comes to environmental public investment projects, there is a gap between those who pay the costs, and those who receive the benefits. This is because of the long term nature of environmental investments, which entails that the majority of the costs are paid by the current generation, while the benefits are reaped by future generations. Because of this, when the social discount rate is set at a standard, singular rate, an issue of relative underestimation of the benefits reaped by future generations may occur during the analytic process. This paper begins with the recognition of this problem, and attempts to estimate a suitable social discount rate that can be applied to environmental investment projects. Taking into account recent economic situations, the social discount rate is currently being estimated at between 2.9 ~ 4.9%. Also, this paper used preliminary feasibility studies that took place so far, to analyze the standard pattern of benefit generation. This revealed that alterations in social discount rates can bring significant changes in economic feasibility test results. Simulation results showed that roughly 6% of B/C ratios could be increased by 1%p. resulting in a decrease in social discount rates. Also if we use hyperbolic discount rates, instead of using the current singular rate, there would be a meaningful increase in the benefits for the future generation.

  • PDF

Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage (활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안)

  • Lee, JeongHoon;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.139-145
    • /
    • 2015
  • Modular construction is combined with manufacturing production process and conventional construction industry technique. Considering characteristic of modular construction production process, manufacturing facilities require indirect costs for utilities, equipment, and overall maintenance, which can affect modular units pricing. However, current modular construction cost classification is inadvertent to reflect the manufacturing overhead costs, because it is generally added as a percentage to sum of labor, material and equipment as it called in single cost pool used. This process is easy to estimate the total construction cost at the project starting points, but it brings on misunderstanding of project profit estimations by "cross subsidization phenomenon". To prevent this situation, in this research aims to provide modular construction overhead cost handling process at the detailed indirect cost calculation for manufacturing stage using Activity-Based Costing as one of the powerful method for overhead costs estimation and allocation. Using this research results, modular construction cost estimators have more detailed cost information of modular units and prevent to misallocate indirect costs. Also, it can be utilized to aid the understanding of the company's profit structure.

A Path-based Traffic Flow Simulation Model for Large Scale Network (기종점 기반 대규모 가로망 교통류 시뮬레이션 모형)

  • 조중래;홍영석;손영태
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.3
    • /
    • pp.115-131
    • /
    • 2001
  • The Purpose of this study is to develop a simulation model for large-scale network with interrupted flow as well as uninterrupted flow. The Cell Transmission(CT) theory is used to simulate traffic flow. Flow transition rules have been newly developed to simulate traffic flows at merging and diverging sections, and signalized intersections. In the model, it is assumed that dynamic OD table is exogenously given. Simulation results for toy network shows that the model can explain queue dynamics not only in signalized intersections of urban arterials, but also in merging and diverging sections of freeway. In case study, the model successfully simulated traffic flows of 145,000 vehicles on CBD network of city of Seoul with 74 traffic zones, 133 signalized intersections among 395 nodes and 1110 links.

  • PDF