• Title/Summary/Keyword: 최대수평변위

Search Result 214, Processing Time 0.031 seconds

Analysis of Surface Displacement Due to the 2024 Noto Peninsula Earthquake in Japan: Focus on Horizontal Surface Displacement Using Offset Tracking (2024년 일본 노토반도 지진으로 인한 지표 변위 분석: Offset Tracking을 이용한 수평 방향 지표 변위를 중심으로)

  • Bong Chan Kim;Seulki Lee;Chang-Wook Lee
    • Korean Journal of Remote Sensing
    • /
    • v.40 no.3
    • /
    • pp.307-316
    • /
    • 2024
  • On January 1, 2024, an earthquake with a moment magnitude of 7.5 occurred on the Noto Peninsula in Japan. The earthquake caused significant surface displacement on the Noto Peninsula. The surface displacement is measured by global navigation satellite system (GNSS) base stations, but there are limitations in obtaining information in areas where base stations do not exist. Therefore, in this study, we aim to determine the horizontal land surface displacement across the Noto Peninsula using offset tracking, which can detect rapidly occurring displacement. As a result of analyzing the Noto Peninsula using the offset tracking technique, it was found that more horizontal surface displacement occurred in the northwest region than in the northeast region of the Noto Peninsula, where the epicenter was located, and the surface displacement value reached a maximum of 2.9 m. The results of this study can be used to calculate surface displacement values in areas where surface displacement data are not available through ground GNSS base stations.

Deformation Behavior and Slope Stability Effect of Anchored Retention Walls Installed in Cut Slope (절개사면에 설치된 앵커지지 합벽의 변형거동 및 사면안정효과)

  • Hong Won-Pyo;Han Jung-Geun
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.9
    • /
    • pp.57-64
    • /
    • 2004
  • In order to establish the design method of anchored retention walls in cut slope, the behavior of anchored retention walls and backside ground needs to be investigated and checked in detail. In this study, the behavior of anchored retention walls was investigated by instrumentation installed in cut slope for an apartment construction site stabilized by a row of piles and anchored retention walls. When the anchor was installed at each excavating stages, the horizontal deflection of retention wall decreased, while the horizontal deformation of backside ground increased. The deflection of anchored retention wall decreased as the anchor was prestressed. The prestressed anchor farce has a great effect on the deflection of retention walls, while it has little effect on the deformation of its backside ground. The maximum horizontal deflection of anchored retention walls was developed between $1\%\;and\;4\%$ of excavation depth, which are $2\~8$ times larger than max. horizontal deflection of anchored retention walls including rock layers with backside horizontal ground. Meanwhile, SLOPILE (ver. 3.0) program analyzes the slope stability effects for anchored retention walls. As a result of analysis on slope stability analysis, the lateral earth pressure applied at anchored retention piles could be used as the mean values of empirical lateral pressures using anchored retention wall with horizontal ground at its backside.

Finite Element Analysis of the Monoleaflet Polymer to Minimize Stress and Displacement (응력 및 변위를 최소화하기 위한 단엽식 고분자 판막의 유한 요소 해석)

  • 한근조;안성찬
    • Journal of Biomedical Engineering Research
    • /
    • v.17 no.1
    • /
    • pp.85-92
    • /
    • 1996
  • A monoleaflet polymer artificial heart valve which showed the remarkable improvement in pressure drop compared with other types of artificial valve was designed to minimize the deflection in vertical direction and the displacement of the valve tip in horizontal direction obtained by using finite element method as the location of the supporting members of the valve frame changed stress distribution change was also studied on each model generated by changing the distance between the frame and supporting members. It was found that by using the valve tip horizontal displacement the minimum valve thickness could be obtained in order to prevent the gap between the valve tip and the frame wall.

  • PDF

Lateral Earth Pressures and Displacements through Full Scaled Lateral Loading Test of Concrete Electric Pole Embedded in Ground (지중에 근입된 콘크리트전주의 실물 수평재하실험에 의한 수평토압과 변위특성)

  • Ahn, Tae-Bong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.4
    • /
    • pp.43-51
    • /
    • 2011
  • Many electric poles in the softground have been collapsed due to external load. In this study, 10 types of tests were performed with variation of location, numbers and depths of anchor blocks as well as depth of poles to find horizontal earth pressure through full scale pull-out tests. The horizontal earth pressure increased with embedded depth of electric pole, and earth pressure of lower passive zone decreased. The deeper of anchor block, earth pressure of passive zone becomes less. lateral displacements showed differences depending on location, numbers and depth of poles. The bending is generated in the upper part at the initial load, but it moved to central part as load increased. The maximum horizontal displacement decreased to 1/1.6 at -0.5m depth of anchor block and 1.3m additional laying depth of poles into ground.

Effects of Loading Method on the Behavior of Laterally Cyclic Loaded Piles in Sand (모래지반에서 재하방법이 반복수평하중을 받는 말뚝의 거동에 미치는 영향)

  • Paik, Kyu-Ho;Kim, Young-Jun;Lee, Seung-Yeon
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.3
    • /
    • pp.63-73
    • /
    • 2011
  • The behavior of laterally cyclic loaded piles is affected by the magnitude and number of cycles of cyclic lateral loads as well as loading method (1-way or 2-way loading). In this study, calibration chamber tests were carried out to investigate the effects of loading method of cyclic lateral loads on the behavior of piles driven into sand. Results of the chamber tests show that the permanent lateral displacement of 1-way cyclic loaded piles is developed in the same direction as the first loading, whereas that of 2-way cyclic loaded piles is developed in the reverse direction of the first loading. 1-way cyclic lateral loads cause a decrease of the ultimate lateral load capacity of piles, and 2-way cyclic lateral loads cause an increase of the ultimate lateral load capacity of piles. The change of ultimate lateral load capacity with loading method of cyclic lateral loads increases with increasing number of cycles. It is also observed that the 1-way cyclic loads generate greater maximum bending moment than 2-way cyclic loads for piles in cyclic loading step and generates smaller maximum bending moment for piles in the ultimate state. It can be attributed to the difference in compaction degree of the soil around the piles with loading method of cyclic lateral loads. In addition, it is founded that 1-way and 2-way cyclic lateral loads cause a decrease in the maximum bending moment of piles in the ultimate state compared with that of piles subjected to only monotonic loads.

Relationship between Temporomandibular Joint Disorders and Horizontal Morphology of Lateral Pterygoid Muscle (외측 익돌근의 수평적 형태와 측두하악관절장애 간의 상관성)

  • Jung, Jae-Kwang;Kwon, Choonik;Byun, Jin-Seok;Choi, Jae-Kap
    • Journal of Oral Medicine and Pain
    • /
    • v.38 no.2
    • /
    • pp.149-159
    • /
    • 2013
  • The purpose of this study was to investigate the relationship between horizontal morphology of lateral pterygoid muscle and onset of temporomandibular joint disorders. Randomly selected 150 subjects, assigned with equal number in terms of gender and age group, were included. The axial and sagittal images in their magnetic resonance images of the temporomandibular joints were used to measure the morphologic characteristics of lateral pterygoid muscles and temporomandibular joints. The measurement variables were maximal horizontal width and insertion angle to the condyle, position of the articular disc, condylar deformity, and joint effusion. In addition, presence or absence of the temporomandibular joint pain was examined through history and palpation of the joints. The relationships among measurement variables were analyzed and the results were as follow. The insertion angle of the lateral pterygoid muscle to the condyle was higher in the joint of anterior disc displacement without reduction than that in the joint of normal disc position. In addition, the maximal horizontal width of the lateral pterygoid muscle was significantly increased in joints with pain than those without pain. Also, the insertion angle was significantly higher in younger age group and the maximal width was significantly greater in male than in female. These results suggest that high insertion angle of lateral pterygoid muscle might be an important anatomic predisposing factor for anterior disc displacement in temporomandibular joint and muscular activity of lateral pterygoid muscle might be affected by preauricular pain. In conclusion, there might be a bi-directional interaction between lateral pterygoid muscle and joint in the progression of anterior disc displacement in temporomandibular joint.

Inelastic Time History Analysis of an Unbraced 5-Story Steel Framed Structure for Arrangement of Semi-Rigid Connection (반강접 접합부 배치에 따른 비가새 5층 철골골조구조물의 비탄성 시간이력해석)

  • Kang, Suk-Bong;Kim, Sin-Ae
    • Journal of Korean Society of Steel Construction
    • /
    • v.22 no.4
    • /
    • pp.313-324
    • /
    • 2010
  • In this study, an unbraced five-story steel-framed structure was designed in accordance with KBC2005 to understand the features of structural behavior for the arrangement of semi-rigid connections. An inelastic time history analysis of structural models was performed, wherein all the connections were idealized as fully rigid and semi-rigid. Additionally, horizontal and vertical arrangements of semi-rigid connections were used for the models. A fiber model was utilized for the moment-curvature relationship of a steel beam and a column, a three-parameter power model for the moment-rotation angle of the semi-rigid connection, and a three-parameter model for the hysteretic behavior of a steel beam, column, and connection. The base-shear force, top displacement, story drift, required ductility for the connection, maximum bending moment of the column, beam, and connection, and distribution of the plastic hinge were investigated using four earthquake excitations with peak ground acceleration for a mean return period of 2,400 years and for the maximum base-shear force in the pushover analysis of a 5% story drift. The maximum base-shear force and story drift decreased with the outer vertical distribution of the semi-rigid connection, and the required ductility for the connection decreased with the higher horizontal distribution of the semi-rigid connection. The location of the maximum story drift differed in the pushover analysis and the time history analysis, and the magnitude was overestimated in the pushover analysis. The outer vertical distribution of the semi-rigid connection was recommended for the base-shear force, story drift, and required ductility for the connection.

Investigation for the deformation behavior of the precast arch structure in the open-cut tunnel (개착식 터널 프리캐스트 아치 구조물의 변형 거동 연구)

  • Kim, Hak Joon;Lee, Gyu-Phil;Lim, Chul Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.93-113
    • /
    • 2019
  • The behavior of the 3 hinged precast arch structure was investigated by comparing field measurements with numerical analyses performed for precast lining arch structures, which are widely used for the open-cut tunnel. According to the field measurements, the maximum vertical displacement occurred at the crown with upward displacements during the backfilling up to the crown of the arch and downward displacements at the backfill height above the crown. The final crown displacement was 19 mm upward from the original position. The horizontal displacement at the sidewall, which had a maximum horizontal displacement, occurred inward of the arch when compacting the backfill up to the crown and returned to the original position after completing the backfill construction. According to the analysis of displacement measurements, economical design is expected to be possible for precast arch structures compared to rigid concrete structures due to ground-structure interactions. Duncan model gave good results for the estimation of displacements and deformed shape of the tunnel according to the numerical analyses comparing with field measurements. The earth pressure coefficients calculated from the numerical analyses were 0.4 and 0.7 for the left and the right side of the tunnel respectively, which are agreed well with the eccentric load acting on the tunnel due to topographical condition and actual field measurements.

Displacement Characteristics of Soft Ground by Embankment Construction (제방축조에 의한 연약지반의 변위특성)

  • Ahn, Kwangkuk;Bae, Wooseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.2
    • /
    • pp.29-39
    • /
    • 2007
  • In this study, the centrifugal tests were fulfilled to analyze the displacement characteristics caused by the embankment construction on soft ground. Embankment of height, undrained shear strength and with or without geotextile were selected to evaluate the displacement characteristics of soft ground by embankment. As a result, the replacement section without geotextile showed the parabola shape. The replacement section with geotextile showed the trapezoidal shape which represents the uniform settlements. The replacement angle is increasing nearly lineally with increasing the height of embankment and G-level. The position, where the maximum horizontal displacement occurred, was between $0.24H_0$ and $0.35H_0$ and was at $0.3H_0$ on the average. In the case of with and without geotextile, the relationship between the maximum settlement of ground(S) and maximum horizontal displacement(${\delta}_m$) was ${\delta}_m$ = 0.60S, ${\delta}_m$ = 0.54S, respectively.

  • PDF

Lateral Behavior of Abutment Piles in Full Integral Bridge During 7 Days in Response to Hydration Heat and Drying Shrinkage (수화열과 건조수축에 의한 7일간의 완전 일체식 교량 교대 말뚝기초의 횡방향 거동)

  • ;;;;Thomas A. Bolte
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.127-149
    • /
    • 2003
  • The bridge tested was 3 spans 90m-long PSC beam concrete bridge with a stub-type abutment which had a skew of 60$^{\circ}$ about the axis of bridge. A cement concrete was placed at the superstructural slab of the bridge. Inclinometers and straingauges were installed at piles as well. During 7 days-curing of superstructural slab, the pile behavior in response to hydration heat and drying shrinkage of the slab was monitored. Then monitored values were compared with the horizontal movement obtained from the HACOM program and the calculated lateral behavior obtained from the nonlinear p-y curves of pile. As a result, lateral behavior of H-piles by the field measurement occurred due to the influence of hydration heat and drying shrinkage obtained during curing of superstructural concrete. The lateral displacements by hydration heat and drying shrinkage were 2.2mmand 1.4mm respectively. It was observed as well that the inflection point of lateral displacement of pile was shown at 1.3m down from footing base. It means that the horizontal movement of stub abutment did not behave as the fixed head condition of a pile but behave as a similar condition. The measured bending stress did not show the same behavior as the fixed head condition of pile but showed a similar condition. The increment of maximum bending stress obtained from the nonlinear p-y curves of pile was about 300(kgf/$\textrm{km}^2$) and was 2 times larger than measured values regardless of installation places of straingauges. Meanwhile, lateral load, maximum lateral displacement, maximum bending stress and maximum bending moment of pile showed a linear behavior as curing of superstructural concrete slab.