• Title/Summary/Keyword: 초기단계

Search Result 4,524, Processing Time 0.031 seconds

Mean Transfer Time for SCTP in Initial Slow Start Phase (초기 슬로우 스타트 단계에서 SCTP의 평균 전송 시간)

  • Kim, Ju-Hyun;Lee, Yong-Jin
    • 대한공업교육학회지
    • /
    • v.32 no.2
    • /
    • pp.199-216
    • /
    • 2007
  • Stream Control Transmission Protocol(SCTP) is a transport layer protocol to support the data transmission. SCTP is similar to Transmission Control Protocol(TCP) in a variety of aspects. However, several features of SCTP including multi-homing and multi-streaming incur the performance difference from TCP. This paper highlights the data transfer during the initial slow start phase in SCTP congestion control composed of slow start phase and congestion avoidance phase. In order to compare the mean transfer time between SCTP and TCP, we experiment with different performance parameters including bandwidth, round trip time, and data length. By varying data length, we also measure the corresponding initial window size, which is one of factors affecting the mean transfer time. For the experiment, we have written server and client applications by C language using SCTP socket API and have measured the transfer time by ethereal program. We transferred data between client and server using round-robin method. Analysis of these experimental results from the testbed implementation shows that larger initial window size of SCTP than that of TCP brings the reduction in the mean transfer time of SCTP compared with TCP by 15 % on average during the initial slow start phase.

CM으로 효율적인 건설안전관리 체계구축 방안에 관한 연구

  • 김영수;안병수;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2002.05a
    • /
    • pp.23-30
    • /
    • 2002
  • 최근 우리나라의 건설산업은 Project의 규모가 대형화됨에 따라 기계화 시공 신공법 도입등 공정작업이 다양해지고 새로운 방법들이 많이 시도되고 있으며 건설산업도 기획, 설계, 발주, 시공, 유지관리라는 연속적 단계를 통하여 각 단계가 상호 유기적 연관성을 가지므로 건설현장의 근원적 안전성 확보를 위해서 건설 시설물의 Life cycle 전 단계를 걸쳐 안전관리 개념과 기법이 도입되어야 한다. 따라서 본 연구에서는 CM에 의한 단계로 안전성 확보에 주력하고 미국 CMAA의 단계별 기능별(phase, 6Function) 업무내용에서와 같이 Safety Management를 한다. 또한 CM제도 정착에 따른 초기단계를 규정하는 안전관리 법령 재정을 하여 단계적으로 자율적 안전 관리를 유도하여 재해예방을 하도록 해야한다.

  • PDF

Changes in Susceptibility of Killifish (Oryzias latipes) to Three Pesticides with Growth (농약에 대한 송사리 생육단계별 감수성의 변화)

  • Shin, Chun-Chul;Lee, Sung-Kyu;Kim, Young-Bae;Kim, Young-Hwa;Roh, Jung-Koo
    • Korean Journal of Environmental Agriculture
    • /
    • v.6 no.1
    • /
    • pp.50-60
    • /
    • 1987
  • Sensitivity, expressed in the $96h-LC_{50}$ determined with continuous flow system, was compared for eight developmental stages of Oryzias latipes with butachlor, diazinon and fenitrothion. Significance of the laboratory determined $96h-LC_{50}$ in real field situation was evaluated for butachlor using outdoor model agrosystem. In the laboratory tests, the most sensitive stage was post-larva stage IV(7 days after hatching) with $96h-LC_{50}$ of 0.14, 1.4, and 1.6ppm for butachlor, diazinon and fenitrothion, respectively, whereas the least sensitive stage was early embryo stage(1 day after fertilization), and then the susceptibility was somewhat stable after 21days after hatching. In the model agrosystem test, the highest concentration of 0.53ppm of butachlor in water was obtained at the 2nd day after application. The stages IV and VIII showed mortality of over 50% at 96 hours after application. It is concluded that the conventional use of butachlor in the field would cause significant adverse effect on O. latipes. It is suggested that sensitivity test at the early life stages with fish is an important part of the ecotoxicological assessment of chemicals.

  • PDF

Performance Driven FPGA Mapping of Sequential Circuits (순차회로를 위한 효율적인 FPGA 매핑)

  • 이준용
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 1998.10c
    • /
    • pp.668-670
    • /
    • 1998
  • 테크놀로지 매핑의 효율성은 매핑된 회로의 지연시간과 회로의 면적에 의해서 평가되어진다. 특히 순차회로에서는 레지스터 사이의 조합회로의 최대지연시간에 의해서 전체회로의 지연시간이 결정된다. 본 논문에서는 순차회로에 대한, 건설적인(Constructive) 단계와 반복적인(Iterative) 단계의 리타이밍 기술과 퍼지 논리에 의해 향상된 FPGA 매핑 알고리즘을 소개한다. 주어진 초기회로는 건설적인 방법에 의하여 FPGA회로로 초기매핑되어진후 반복적인 리타이밍에 의하여 매핑회로의 효율을 높이게된다. 초기회로에 주어진 여러 가지 기준들은 결정 함수(Decision Making)에 대한 퍼지 이론 법칙의 계층적인 구조에 의해 연결되어져 있다. 제안된 매퍼는 MCNC 밴치마커의 실험을 통해 지연시각과 면적에서 기존 매핑시스템의 성능을 능가함을 보여준다.

  • PDF

The Case of CM as Applied to the Pre Design Phase - Focused on the Case of YongJu New Tobacco Manufacturing Plant - (설계 전 단계에서의 CM 적용 사례 - 영주 신 제조창 CM 사례를 중심으로 -)

  • Park Yong-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.19-26
    • /
    • 2003
  • In the face of the deterioration of tobacco manufacturing plant, we've got the plan for now manufacturing factory for the competitiveness, modernization, rationalization and environment. To achieve the goals, it was necessary to plan and investigate in the early stage of project. Consequently. We determined to introduce the CM in the early stage. We Performed the whole phase of CM services front the pre design phase services like feasibility analysis of site and building, plant master plan, selection of manufacturing facilities and drawing up the RFP, to maintenance management phase after the completion of a construction work. Contrary to the another CM projects, YongJu New Tobacco Manufacturing Plant CM organized the CM team with expert in field before the design development. This study analyze and evaluate the CM services of YongJu project which performed on the pre design phase. The purpose of this study is to emphasize the importance of pre design phase CM and support that CM services will start from the pre design phase.

  • PDF

Power/Clock Network-Aware Routing Congestion Estimation Methodology at Early Design Stage (설계 초기 단계에서 전력/클록 네트워크를 고려한 라우팅 밀집도 예측 방법론)

  • Ahn, Byung-Gyu;Chong, Jong-Wha
    • Journal of IKEEE
    • /
    • v.16 no.1
    • /
    • pp.45-50
    • /
    • 2012
  • This paper proposes the methodology to estimate the routing congestion of modern IC quickly and accurately at the early stage of the design flow. The occurrence of over-congestion in the routing process causes routing failure which then takes unnecessary time to re-design the physical design from the beginning. The precise estimation of routing congestion at the early design stage leads to a successful physical design that minimizes over-congestion which in turn reduces the total design time cost. The proposed estimation method at the block-level floorplan stage measures accurate routing congestion by using the analyzed virtual interconnections of inter/intra blocks, synthesized virtual power/ground and clock networks.

Cost Estimation Model Framework of Road Construction Project through Quantity of Standard Work (대표물량을 활용한 도로공사 개략공사비 산정모델 프레임워크)

  • Kwak, Soo-Nam;Kim, Du-Yon;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.607-612
    • /
    • 2007
  • Early cost estimation promote efficient budget plan by comparing alternatives and presenting cost information However it is hard to predict accurate cost because of vague cost standard and lack of available information in the early stage. The precious cost model has limitations in the accuracy because they are simple linear model which uses the unit cost per kilometer. This study presents the framework of early cost estimation for road construction projects to overcome the limitation of previous cost model. This study analyzed domestic and foreign cost model and cost data of previous road construction project to present method of cost model framework.

  • PDF

A Non-Functional Requirements Analysis Method Using Quality Attribute Category (품질 속성 카테고리를 사용한 비기능 요구사항 분석방안)

  • 이은미;박수용
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2004.10b
    • /
    • pp.460-462
    • /
    • 2004
  • 최근 시스템이 점차 대형화되고 복잡화되면서 시스템의 요구사항은 소프트웨어 프로젝트의 성패를 결정하는 중요한 문제로 인식되었다. 특히 소프트웨어 품질에 관심이 높아지면서 고품질의 소프트웨어 개발을 위해 노력이 활발히 이루어지고 있다. 이러한 노력의 일환으로 소프트웨어의 품질 속성을 나타내는 비기능 요구사항을 추출.분석을 위해 연구가 진행되고 있으나 극히 미진한 연구가 진행되고 있다. 본 논문은 이를 위해 소프트웨어 개발의 초기단계인 요구사항 단계에서 비기능 요구사항을 분석하고 이를 설계 단계에서 사용할 수 있도록 기술하는 방안을 제시한다.

  • PDF

Scouring and washing technology using electrolytic water (전해수를 이용한 정련 및 수세)

  • 최용철;홍영기;손영아;배기서
    • Proceedings of the Korean Fiber Society Conference
    • /
    • 2002.04a
    • /
    • pp.127-130
    • /
    • 2002
  • 섬유공업에서 섬유원료단계의 세정을 출발로 실 및 직물제조 단계를 거쳐 제조된 직물의 가호, 탈호, 정련ㆍ표백, 염색ㆍ가공 공정 등의 모든 공정에 수세공정이 포함되어 있다. 이러한 공정에는 많은 양의 물이 사용될 뿐만 아니라 환경 오염의 원인이 되는 약제들 또한 다량 사용되므로, 섬유공업의 발전 초기단계부터 부수적으로 발생되는 환경 폐수를 줄이거나, 오염 물질의 발생을 유발하지 않는 방법에 대하여 활발한 연구가 이루어져 왔으나 현재까지도 크게 실효를 거두지 못하고 있다. (중략)

  • PDF

벤처창업 초기투자 활성화 방안에 관한 연구

  • Choe, Yeong-Geun;Jeon, Seong-Min;Lee, Seung-Yong
    • 한국벤처창업학회:학술대회논문집
    • /
    • 2021.04a
    • /
    • pp.181-184
    • /
    • 2021
  • 본 연구는 국내에 벤처 창업 자금이 많이 제공되나 실제로 스타트업이 투자 유치에 어려움을 겪고 있는 초기투자의 딜레마 문제를 연구하였다. 기술기반 스타트업은 새로운 제품과 서비스를 제공하는 신규 시장을 형성하면서 일자리와 고부가가치를 창출한다는 점에서 국민경제에서 역할이 매우 중요하다. 하지만 주요 선진국에 비해 국내에서는 초기 스타트업이 기술이전 후 창업으로 연계되지 못하는 경우가 많은 실정이다. 특히 최근에 국내 벤처창업 생태계에 정부 자금의 공급이 넘쳐나고 있음에도 불구하고 초기 단계 기업들은 자금 투자의 필요성을 역설하고 다수가 자기자본으로 시작하고 있는 것이 현실이다. 이에 본 연구에서는 국내 창업벤처 및 육성 지원책을 고찰하고, 국내 벤처캐피털 투자현황을 분석하여, 초기 단계 벤처기업에 대한 투자 활성화를 위해 투자 방식의 개선, 투자 주체의 확대, 그리고 투자 유형의 다변화를 제시하고자 하였다. 또한 벤처생태계의 초기투자 활성화를 위한 정책 수립에 필요한 조사와 방안을 제시하였다.

  • PDF