• Title/Summary/Keyword: 철도 유지관리

Search Result 545, Processing Time 0.036 seconds

A Study on Relationship between Structural Safety and Maintenance of Derailing Prevent Guard Rail (탈선방지 가드레일의 구조안전성과 유지보수 상관성에 관한 연구)

  • Jung-Youl Choi;Hyeon-Yo Park;Jee-Seung Chung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.593-599
    • /
    • 2023
  • There is risk of derailment due to various factors such as vehicle-track load imbalance in curved parts, so urban railways install and operate derailing prevent guard rails. The angle-type derailing prevent guard rail is composed of various parts including the guard angle. Even if derailment does not occur, various damages occur in the components, so continuous maintenance is required. Through the damage status analysis, the components of the angle-type derailing prevent guard rail with high damage frequency were classified, and conditions for the occurrence of various damages were investigated. In addition, a numerical analysis using a precise 3D numerical model was performed to analyze the cause of the damage analytically. In order to analytically simulate the derailment situation, the static ultimate load condition was applied, and the actual drawing of the angle-type derailing prevent guard rails, rails, and wheels was used for modeling. By analyzing the results of the damage status investigation and finite element analysis, we tried to investigate the damage of the components.

A Secure Group-Key Agreement and User Authentication for IP Camera Environment (IP Camera 환경에서 안전한 그룹키 공유와 사용자 인증에 관한 연구)

  • Yoo, Ji-Cheol;Kim, Seong-Jong;Lee, Sung-Jin;Jun, Moon-Seog
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.969-972
    • /
    • 2012
  • 기존의 CCTV와는 달리 IP Camera는 네트워크에 유선 또는 무선으로 직접 연결되며 IP Camera에 임베디드된 웹 서버를 통하여 서비스를 제공한다. 한 건물 또는 지역 안에는 다수의 IP Camera가 설치될 수 있다. 이때 각 각의 IP Camera에 웹 서버가 존재하기 때문에 웹서버 마다 다른 key를 가지고 관리하게 되어 서버 관리에 있어서 비효율적이다. 또한 단순 ID, Password로 사용자 인증을 하며 별도의 암호화 과정을 거치지 않기 때문에 취약점을 갖는다. 따라서 본 논문에서는 그룹 키를 이용하여 다수의 웹 서버의 키를 관리하고 PKI 암호를 통하여 사용자 인증 및 세션 키를 생성함으로써 위장 공격, 기밀성, 무결성, 재사용 공격 등의 보안 취약점을 강화한다.

A Study on the 2D and 3D configuration management for Maintenance CALS system (유지보수체계 시스템구축을 위한 도면 및 3차원 형상관리 프로그램개발에 관한 연구)

  • Lee H. Y.;Park K. J.;Ahn T. K.;Yoon S. K.;Suh M. W.
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.819-825
    • /
    • 2004
  • The maintenance CALS system for car of urban transit is a part of standardization and development of urban transit system, and We have been performed the establishment of maintenance CALS system from 2001 to 2005. These 2D and 3D configuration management system are utilized in a variety of CALS system for user's convenience and safety in maintenance. In this paper, the 2D and 3D configuration system will be discussed for necessity and possibility. This system include RAMS(reliability, availability, maintainability and safety) of the vehicles shall be enhanced in the future.

  • PDF

A Development for Maintenance System of Tunnel Structure (터널구조물의 유지관리시스템 개발)

  • Kong Sung Suk;Kim Dong Wook;Ku Ja Kap;Lee Song
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.585-590
    • /
    • 2003
  • The execution with respect to tunnel structure has been carried out more important than maintenance until present time. There is a lot of interests on the maintenance of institution that is used by the nation, because of the recent miserable accidents. Consequently there need an organizational and efficient system. This paper has presented the sort, source and part of damage of tunnel structures etc. and then performed to analyze about the special quality of tunnel structure through input detailed safety assessment report data as well as fulfilment statical analysis. In conclusion, the paper's intention is presenting the maintenance system base on those.

  • PDF

Design of Decision Support Systems for Railway Conflict Resolution Problem using Expert Systems (전문가 시스템을 이용한 열차경합 해소를 위한 의사결정 지원 시스템 구축)

  • Kim Tack-Ryoung;Lee Sang-In;Park Jin-Bae;Joo Young-Hoon;Hong Hyo-Sik;You Kwang-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.1054-1059
    • /
    • 2005
  • 본 논문은 철도청 사령실 통합 신호설비 구축사업에 적용할 열차 경합의 효과적인 해소 기법을 제시하고자 한다. 열차경합의 검지 및 해소 시스템 (Railway Conflict Detection and Resolution System)은 열차 운행관리 시스템(Railway Traffic Management System, RTMS)의 의사결정 지원 모듈이다. 이 모듈은 열차운행의 정시성을 유지하기 위하여 매우 중요한 기능을 수행하고 있다. 하지만 현재 5개 지역본부별로 나뉘어서 기능이 수행되고 있고, 사령의 경험에 의하여 수작업 형태로 이루어지고 있기 때문에 전체 시스템의 관점에서 보면 최적의 해소안이 도출되고 있지 못하다. 따라서 본 논문에서는 시스템을 전역적으로 고려하여 최적의 해소안을 제시하고자 한다. 또한 최적화의 개념을 도입하기 위하여 6가지의 가중치를 설정하고, 이 가중치를 고려한 지연시간의 합을 목적함수의 값으로 설정한다. 본 시스템은 이러한 가중치의 합을 최소로 하는 복수의 해소안을 제시한다.

  • PDF

Manufacturing Video Clips for Easier Understanding about the Maintenance Procedures of Railway Signal Facilities (신호설비 유지관리절차 동영상 제작)

  • Jung, Ho-Hung;Ko, Yang-Ok;Lee, Nam-Il
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1033-1037
    • /
    • 2010
  • Railway signal facilities are very important because they are directly related to safe train operation. By the result of the unification of signal and station control, station control staffs have been having a hard time to grasp the knowledge about signal facilities and the fault restoration ability in a short term since the existing manuals were only made with text materials. To meet the growing demand to educate the maintenance work in actual and effective way, the maintenance manuals and periodic procedures was developed in the forms of video clips and animations with quality contents onto a DVD enabling not only to improve the maintenance works for signal facilities but to contribute budget saving and profit generating.

  • PDF

A Study on Proper Maintenance Level Selection of Track Ballast Structures Using LCC Analysis (LCC분석을 통한 궤도도상구조의 적정 유지관리수준 선정에 관한 연구)

  • An, Kook;Lee, Ho-Yeol;Chu, Jang-Sik;Park, Mi-Yun;Lim, Jong-Kwon
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.232-237
    • /
    • 2008
  • Several research institutes including KISTEC and KRRI etc., recently, have studied maintenance activities and performance, in order to determine proper maintenance level and maintenance cost of rail tracks. But it may extremely difficult to make a decision in maintenance matters of concrete track and ballast containing other sub-components. For these reasons, this study investigate variables related to current maintenance, essential maintenance, and preventive maintenance. It is intended to suggest estimation method of proper maintenance cost maximizing rail track performance. It is stated that proposed approach may be very useful to make a decision of proper maintenance level. Typical section of rail track is applied for calculation of life cycle cost according to each maintenance strategy. A proper profile for maintenance is determined minimum life cycle

  • PDF

Development of Preventive Maintenance Plan based on PRA - Case Study of Pansong-Line Railway in Pusan - (위험도평가에 기초한 예방유지관리 계획 - 부산지하철 반송선의 설계 예 -)

  • Kim Jae-Won;Choi Young-Min;Kim Dae-Sung;Kim Kyo-Hun;Park Hyang-Woo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.482-487
    • /
    • 2005
  • In the most current Turn-key bidding and Alternative design, is going to establish maintenance plan along with a economical assessment (VE/LCC assessment etc). Generally, establishment of maintenance plan is based on past experiences that are decided upon sensor position and amount with analytic or mechanical control section. But, it is more reasonable that maintenance plan based on level of significance for Probabilistic Risk, with presuming damage probability assessment of structural fracture scenarios. Therefore, in this study it is considered about the technique that an improved maintenance plan of railroad structures using PRA (Probabilistic Risk Assessment) on the basis of structural reliability theory. For this, in the paper, Preventive maintenance plan based on PRA is suggested with an application example of Pansong-Line (Line number 3) railway in Pusan works that actually executed Turn-key design.

  • PDF

A Development of Service System for Electronic Design·Completion Documents and Drawings on Port Construction (항만건설공사 전자설계·준공도서 서비스 시스템 개발)

  • Jeong, Seong-Yun;Kim, Nam-Gon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.1269-1270
    • /
    • 2012
  • 설계 준공도서는 건설공사를 시공하거나 유지 관리에서 필요한 정보를 담고 있는 자료이다. 과거에는 전자설계 준공도서가 단순 보관용으로 사용되어 활용도가 낮았다. 본 연구는 전자설계 준공도서의 활용도를 제고하고 전자설계 준공도서의 적합성 검사, 시스템 등록 서비스 등의 업무처리 시간을 단축시키실 수 있는 전자설계 준공도서 서비스시스템을 개발하였다. 연구결과를 응용하면 항공, 철도 등 다른 건설분야의 전자설계 준공도서 서비스 시스템 개발로 확대할 수 있을 것으로 사료된다.

An Improved Method of Developing Safety-Related Application Conditions for Safety Design of Railway Signalling Systems (철도신호시스템의 안전 설계를 위한 개선된 안전성 적용 조건 도출 방법)

  • Baek, Young-Goo;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.31-45
    • /
    • 2017
  • According to the railway accident statistics in recent years, the frequency of accidents has been significantly reduced, due to the advance of related technologies and the establishment of safety information management systems. Nonetheless, accidents due to errors in the operation and maintenance phase and faults in safety design continue to occur. Therefore, to prevent accidents, guidelines for the safety design and manufacture of railway vehicles were established, and a request for the independent safety evaluation of safety designs was made. To respond to this, rail system developers must prepare safety cases as a safety activity product. One of the main items of these safety cases is the safety-related application conditions (SRAC) and, thus, the question of how to develop these SRAC is an important one. The SRAC studies reported so far focused only on the simplicity of the derivation procedure and the specific safety activities in the design phase. This method seems to have the advantage of quickly deriving SRAC items. However, there is a risk that some important safety-related items may be missing. As such, this paper proposes an improved method of developing the SRAC based on the idea of performing both the safety design and safety evaluation activities throughout the whole system lifecycle. In this way, it is possible to develop and manage the SRAC more systematically. Especially, considering the SRAC from the initial stage of the design can allow the safety requirements to be reflected to a greater extent. Also, an application case study on railway signaling systems shows that the method presented herein can prevent the omission of important safety-related items, due to the consideration of the SRAC throughout the system lifecycle.