서울도시철도의 건설방향

  • 백영현
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.237-251
    • /
    • 2002
  • 도시철도 건설현황 o '74. 8. 15 : 지하철 1호선 개통('71. 4. 12 착공) 3년 7개월간 지하철건설 중단 o '78. 3. 9 ∼ '84. 5. 22 : 지하철 2호선 건설 o '80. 2. 29∼'85. 10. 18 : 지하철 3,4호선 건설 4년 2개월간 지하철건설 중단(중략)

  • PDF

Comparative Analysis on the Railway Construction Criteria with Regard to the Trans-Korea Railway Project and the Railway Modernization of DPRK (남북철도 현대화를 위한 남북한 철도건설기준 비교 분석)

  • Kim, Sang-Gyun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.1011-1017
    • /
    • 2009
  • In pursuit of the Trans-Korea Railway (TKR) project connecting the Korean peninsular by a rail link, it is critical that the two railway systems in ROK and DPRK are comparable in criteria and standards. Yet, there is substantial divergence of the construction criteria between the two sides, which hinders from conducting the TKR project as well as the railway modernization of DPRK. In this regard, study and comparison of the criteria are a prerequisite for mitigating the hinderance. This study investigated the laws and regulations relating to the railway technologies and construction and in particular conducted a comparative analysis of both railway systems with a focus on railway facilities such as track, structures, electric power and signaling. The results of this study will provide a useful information for the improvement of existing lines and the construction of new lines in DPRK.

현장탐방 - 수도권고속철도(수서~평택) 터널

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.311
    • /
    • pp.40-51
    • /
    • 2016
  • Rail로 세상을 연결하여 국민의 행복을 창조하기 위해 노력하는 한국철도시설공단(이사장 강영일)은 수서~평택 간 수도권 고속철도사업을 올해 안으로 완수하기 위해 노력하고 있다. 한국철도시설공단이 추진하는 수도권고속철도(수서~평택) 건설사업은 서울 강남의 수서역에서 출발하여 동탄역을 거쳐, 평택역에서 현재 운영 중인 경부고속철도와 접속하는 노선으로 총 3조7천억원이 투입됐다. 지난 2011년 착공하여 올해 말까지 완공할 계획으로, 대부분의 구간을 지하로 건설한다. 수도권고속철도가 건설되면 KTX 수서역 동탄역이 신설되어 서울 강남 강동권 및 경기 동남부 지역까지 KTX 수혜범위가 확대되고 수서에서 부산까지 2시간 2분, 목포까지 1시간 52분으로 운행시간이 크게 단축되어 이용객 증가는 물론 지역균형발전과 성장동력 확보에 기여할 것으로 예상된다. 본지는 수서역사와 율현터널 현장에서 한국철도시설공단 수도권고속철도건설단 건축설비부 신승섭 차장(기계설비 감독관)과 율현터널(제1공구) 기계설비를 시공 중인 (주)세화이엔지[대표 박현수] 윤한식 현장소장, 수서역사 기계설비를 시공 중인 (주)초록이노텍[대표 양기준] 홍승훈 현장소장, (주)서한종합건축사사무소 홍형창 기계부장(감리단)을 만나보았다.

  • PDF

A Study on the Improvement of Railway Construction Schedule Using KTX Construction Case (경부고속철도 사례분석을 통한 철도건설공기 개선에 관한 연구)

  • Yang, Yeonjong;Chung, Byunghyun
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.662-669
    • /
    • 2012
  • In 2004, KTX operated in Korea on the 5th in the world. But there are various factor on planed schedule delay of Big National Construction Project like Seoul-Busan High Speed Rail Project(Seoul-Busan HSR). For example, Often change of government policy, project management control problem of design and construction, conflict of interested party like environmental organization/resident are the main delay factors. The suggestions for improvement of the construction schedule through the Seoul-Busan HSR will help to make a new leap forward in rail construction.

Railway tunnel ventilation system design (철도터널 환기설계의 기초)

  • 신현준;유지오
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.28 no.6
    • /
    • pp.463-475
    • /
    • 1999
  • 산업과 생활수준의 향상에 따라서 도로나 철도 등의 기간산업에 대한 고속화 및 대용량화가 요구되고 있다. 특히 철도에 있어서는 선형의 직선화 및 복선화계획이 진행되면서 터널건설이 증가하고 장대터널이 요구되고 있는 실정이다. 이에 따라 철도터널의 환기 및 방재 시스템의 설계기법에 관심이 고조되고 있으나 현재의 국내 철도 터널은 대부분 오래 전에 건설된 것이며 또한 환기설비를 요구할 만큼의 장대터널이 없기 때문에 이를 고려하지 않고 있다. 그래서 국내의 철도터널 환기설계 기술은 미약한 상태로 현재 발주되는 대부분의 공사를 외국의 용역사의 설계에 의존하고 있는 실정이다.

  • PDF

A Study on the Advancement to establish for Surveying of Railway Construction (철도건설공사를 위한 측량에서의 고도화 정착에 관한 연구)

  • Moon, Jae-Woo;Kim, Young-Ha;Oh, Byung-Soo;Han, Chun-Deuk
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1525-1532
    • /
    • 2010
  • Modern surveying techniques have been progressed to get the absolute position of a single coordinate system at any point on the earth with the advent of the Global Navigation Satellite System and One-stop digital equipment. In addition, as the speed of the railway has been increasingly faster, in determining the location of major facilities including the center of tracks, it is required to the sophisticated precision. The surveying of railway construction has applied the technical supports and procedures in accordance with the current requirements. In this study, the applicable guidelines of surveying on practical issues and alternatives would be examined, analyzed, and presented by using the empirical data of pilot areas in the process of design, construction, and the maintenance of railway.

  • PDF

Simulation Function of Railway Station Project by Virtual Construction Technology (가상건설기법에 의한 철도역사 시설물 시공시뮬레이션 기능 구축)

  • Kang, Leen-Seok;Moon, Jin-Seok;Kwon, Jung-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.433-440
    • /
    • 2008
  • Virtual construction methodology enables to construct project facility from design phase to construction phase in 3D virtual environment. It is a technique that can solve problems of construction in virtual construction process. This study suggests some methodologies of virtual construction and developed a system for a railway station in Honam express railway project based on suggested methodologies. This study developed layout review and layer simulation functions. Those functions can improve the effectiveness of 3D simulation and the virtual construction system can be used as a verification tool for construction process of various construction projects.

A Study on Application of Smart Construction Safety Technology into Railway Construction (철도건설공사에 적합한 스마트 건설안전기술 적용방안에 대한 연구)

  • Sungwon Jung;Taekeun Oh
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.483-488
    • /
    • 2024
  • Railroad construction requires a lot of budget, manpower, and equipment, and as a result, many accidents occur. Although efforts are being made at the national level to reduce the accidents at railway construction sites, the occupational accident rate is not showing a downward trend. Various efforts are needed to reduce accidents, the application of smart construction safety technology will be effective. However, if smart construction safety technology is introduced indiscriminately without analysis, duplicate investment may occur, which may lead to a waste of budget for railway construction. In this regard, this study analyzes accident cases at railroad construction sites through a survey of stakeholders and proposes smart construction safety technologies to be effective for those accident types.

경부고속철도 트러스교 건설

  • 황낙연;배선순;김창환;김병용
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.3
    • /
    • pp.33-42
    • /
    • 2002
  • 김천시 및 경부고속도로를 통과하는 8-2공구는 고속철도구간 중 최고 난공사 구간중의 하나로서 (주)대우건설컨소시엄에 의해서 수행되었는데 건설초기 원가 절감과 공기완수라는 목표를 두고 전면적인 설계검토를 착수하였다. 교량구간이 전체 연장중 절반이 넘는 9.6km이므로 교량에서 대안 설계가 중점적으로 검토되었고 이에 따라 PSM(Precast Span Method)공법이 적용되었다. (토목학회지1999. 6.) PSM공법은 25m 경간이므로 도로, 철도등을 통과하는 구간에는 한계가 있어 50m 경간의 강합성교량을 적용하였다. (중략)

Construction Status and Innovation Insistance of KTX (경부고속철도 건설현황 및 기술혁신 사례)

  • 창상훈
    • Journal of the Korean Professional Engineers Association
    • /
    • v.37 no.2
    • /
    • pp.42-46
    • /
    • 2004
  • 고속철도 건설의 필요성 서울-부산간 교통난 심화, 경부축; 인구 71%, GDP 75% 집중, 과중한 물류비용으로 국가경쟁력 악화 (GDP 대비: 일본 -9.5%, 미국 -9.9%, 한국 -16.3%), 새로운 교통시설 확충에 대한 국민적 요구 증대, 건설비는 고속도로에 비해 1.5배가 증가하나 수송력 2배, 운행시간 2-3시간 단축 효과, 우리나라는 수송밀도가 매우 높아 수송문제를 해결하기 위해서는 속도향상이 필수적임(속도=수송력 증가), 고속철도 ; 여객전용, 기존선 철도 ; 화물중심으로 운행(중략)