• Title/Summary/Keyword: 채석장 슈미트 해머 시험

Search Result 1, Processing Time 0.014 seconds

Engineering Geological Analysis for the Quarry Located at the Construction Site of the New Susan Harbor (부산 신항만 건설현장의 채석장에 대한 지질공학적 고찰)

  • 최정찬
    • The Journal of Engineering Geology
    • /
    • v.13 no.3
    • /
    • pp.359-368
    • /
    • 2003
  • A quarry is operated for filling-up the New Busan Harbor which is under construction, but actual rock quality is something different from the primary design. Therefore, object of this study is to classify whole rock quality for the quarry through site investigation and laboratory analyses because unexpected large amount of wasted rock is produced. For this object, various analyses were performed such as surveying, Schimidt Hammer test. joint spacing investigation and laboratory analyses using DIPS & RockWorks programs for evaluating joint sets and sizes of rock fragments after blasting. As a result, it is expected that large amount of wasted rock under ${\Phi}100mm$ is produced after blasting because of high joint density.