Simultaneous removal of phosphorus and nitrogen from wastewater was studied by the anaerobic-aerobic system of activated sludge. In the anaerobic stage, most of the influent glucose was removed and orthophosphate was released, when the nitrate and/or nitrite concentration in the wastewater was almost zero. The amount of the released phosphorus was found to be directly proportional to the amount of the removed glucose. When the ratio of phosphorus to glucose in the influent was less than 0.04, the phosphorus in the wastewater was almost completely removed during the aerobic state. Under the anaerobic condition, activated sludge released phosphate and excess removal of phosphate occurred during the aerobic condition. Namely, the stress received in anaerobic period stimulated the uptake of phosphorus in aerobic period. The amounts of phosphorus release in the anaerobic and uptake in the aerobic stage were less in proportional to the concentration of $NO_x-N$. Further, if the initial ratio of $NO_2-N$/glucose was less than 0.37, the inorganic nitrogen in the influent could be completely removed.
There have been several problems in treating shipbard sewage due to special environmental conditions of ship, such as limited space, rolling and pitching, change of temperature and so on It was suggested that Sequence Batch Reactor (SBR) might be suitable process for overcome these problems in terms of small size, high capacity of treating wastewater and full automation. In this study a SBR process was employed for biological treatment of organic wastes in the shipboard sewage. This process was able to remove nitrogen and phosphorus as well as organic matter efficiently. Afore than 95% of chemical oxygen demand(COD) were removed. In addition, about 97% of total nitrogen (T-N) was reduced. The total phosphorus(T-P) reduction averaged 93%. A disturbance operation caused by the treatment of Methylene Blue Active Substances(MBAS) was not observed.
Journal of Korean Society of Environmental Engineers
/
v.32
no.10
/
pp.949-956
/
2010
A method for simultaneous removal of nitrogen and phosphate from sewage by elemental sulfur denitrification with membrane bioreactor was proposed, and capacity $10\;m^3$/day of pilot plant was operated for 350 days. This study was investigated to have the effect of denitrification rate and T-P removal with the addition of Alum in Sulfur denitrification Reactor (SDR). The addition of Alum and alkalinity ($NaHCO_3$) in the effluent of MBR was tried to remove simultaneous phosphate and nitrogen in SDR. Characteristics of total nitrogen (T-N) and total phosphate (T-P) removal was compared without and with the addition of Alum as a coagulant. T-N removal without and with the addition of Alum was 92.1% and 87.8%, respectively. And denitrification efficiency was 93.8% and 87.1%, respectively. T-P removal rate was increased to 75.6% in SDR by addition of Alum (2.6~4 mg/L as Al), but T-P removal rate was about 26.7% without the addition of Alum. Therefore, denitrification rate was 6.7% of reduction but T-P removal rate was increased by addition of Alum.
Kim, Dong-Jin;Han, Dong-Woo;Lee, Soo-Choul;Park, Byeong-Gon;Kwon, Il;Sung, Chang-Keun;Park, Wan-Cheol
KSBB Journal
/
v.17
no.1
/
pp.80-87
/
2002
Laboratory scale aerobicfanaerobic biofilm reactor was used for simultaneous and stable removal of organics, N and P components to investigate optimum design and operation parameters and to analyze the microbial distribution and consortium structure of nitrification and denitrification bacteria in aerobic and anaerobic biofilm systems. The biofilm reactor was successfully operated for 143 days to show $COD_{cr},\;BOD_5$, SS removal efficiencies of 88, 88, and 97%, respectively. During the experiment period, almost complete nitrification efficiency of 96% was achieved. Denitrification efficiency was about 45% without addition of any external carbon sources. In case of total phosphorus removal, 74% of the inlet phosphorus was removed. Fluorescence in situ hybridization (FISH) results showed that most of the ammonia oxidizing bacteria in the aerobic nitrification zone was found to be Nitrosomonas species while Nitrospira was the representative nitrite oxidizing bacteria. For the denitrification, Rhodobacter, Rhodovulum, Roseebacter and Paracouus were the dominant denitrification bacteria which was 10 to 20% of the total bacteria in numbers.
Journal of Korean Society of Environmental Engineers
/
v.22
no.5
/
pp.861-867
/
2000
The feasibility of simultaneous phosphorus and nitrogen removal by enhancing anoxic phosphorus uptake was investigated in a sequencing batch reactor (SBR). By introducing an anoxic phase into an anaerobic-aerobic SBR (AO SBR), significant amounts of denitrifying phosphorus accumulating organisms (DPAOs) which can utilize nitrate as electron acceptor could be accumulated in the reactor (anaerobic-aerobic- anoxic-aerobic SBR, $(AO)_2$ SBR). A direct comparison of phosphorus uptake rate under anaerobic and aerobic conditions showed that the fraction of DPAOs in P-removing sludge were increased from 10% in the AO SBR to 64% in $(AO)_2$ SBR. The $(AO)_2$ SBR showed stable phosphorus and nitrogen removal efficiency: average removal efficiencies of TOC, total nitrogen, and phosphorus were 92%, 88%, and 100%. respectively. Results of the $(AO)_2$ SBR operation and batch tests showed that nitrite (up to 10 mg-N/L) was not detrimental to anoxic phosphorus uptake and could serve as good electron acceptor like nitrate.
Journal of Korean Society of Environmental Engineers
/
v.35
no.10
/
pp.724-729
/
2013
Simultaneous nitrification and denitrification (SND) occurs concurrently in the same reactor under micro dissolved oxygen (DO) conditions. Anaerobic zone was applied for phosphorus release prior to an aerated membrane bio-reactor (MBR), and anoxic zone was installed by placing a baffle in the MBR for enhancing denitrification even in high DO concentration in the MBR. Phosphorus removal was tested by alum coagulation in the anaerobic reactor preceding to MBR. DO concentration were 2.0, 1.5, 1.0, 0.75 mg/L in the MBR at different operating stages for finding optimum DO concentration in MBR for nitrogen removal by SND. pH was maintained at 7.0~8.0 without addition of alkaline solution even with alum addition due to high alkalinity in the raw sewage. Both TCODcr and $NH_4^+$-N removal efficiency were over 90% at all DO concentration. TN removal efficiencies were 50, 51, 54, 66% at DO concentration of 2.0, 1.5, 1.0, 0.75 mg/L, respectively. At DO concentration of 0.75 mg/L with addition of alum, TN removal efficiency decreased to 54%. TP removal efficiency increased from 29% to 95% by adding alum to anaerobic reactor. The period of chemical backwashing of the membrane module increased from 15~20 days to 40~50 days after addition of alum.
Journal of Korean Society of Environmental Engineers
/
v.27
no.2
/
pp.206-214
/
2005
This study was initiated to evaluate efficiencies of suspenced-growth processes(CAS; Conventional Activated Sludge, MLE; Modified Ludzack-Ettinger) and hybrid process(Modified-Dephanox) on removal of organic matter(C), nitrogen(N) and phosphorus(P) in municipal wastewater. M-Dephanox process was designed to improve the performance of Dephanox process on denitrification efficiency. As the results, removal efficiencies of total chemical oxygen demand(TCOD), total nitrogen(T-N) and total phosphorus(T-P) in M-Dephanox process, which is hybrid process, were 12,3, 18.6 and 28.2% higher than those in MLE, which is suspended-growth process. The better removal efficiencies of TCOD, T-N and T-P in M-Dephanox than those in MLE result that M-Dephanox is not only hybrid or multi-sludge process but also process using biosorption mechanism which is possible to use organics in denitrification, effectively. Ammonia removal efficiency in nitrification reactor of M-Dephanox was 96.7% at short hydraulic retention time(HRT) of 2 hr which was 3 hr more short HRT than that(HRT 5 hr) reported in other related papers. This indicates that M-Dephanox process can reduce HRT of whole process.
A magnetic fluid separation technology was confirmed to be very effective to remove the suspended solids from contaminated water. We have surveyed on the effects of operating variables on the characteristics of suspended solids(SS) removal investigated through the test runs using magnetic powder. Magnetic flocculation here formed by adsorbing fine magnetites on the surface of suspended solid was observed. The strength of magnet was of significance in determining the SS removal efficiency.
Journal of the Korea Organic Resources Recycling Association
/
v.11
no.2
/
pp.125-131
/
2003
This study was carried out to develop INSUB(Indirected Aerated Submerged Biofilter) which can remove organics, nitrogen and phosphorus with an advanced treatment system. The results were as followed in laboratory model experiment. As for treatment of sewage, when economical efficiency was considered in practice, the highest removal efficiency was at 18hr of HRT, 1.017m/hr of superficial velocity and 40% of media packing ratio. Each removal efficiency for $COD_{cr}$, $COD_{Mn}$, $BOD_5$, T-N, and T-P was 90.6, 85.3, 95.0, 52.3 and 56.8%. To remove the nitrogen and phosphorus With high efficiency, first of all, denitrification have to be completed, then uptake of phosphorus have to completed. Therefor, mixture of anoxic and aerobic reactor was necessary for the high removal efficiency of nitrogen and phosphorus in INSUB.
Journal of Korean Society of Environmental Engineers
/
v.32
no.8
/
pp.761-766
/
2010
This study was aimed to propose La(III)-zeolite composite which can effectively and simultaneously remove ammonia and phosphate in confined water bodies such as lakes and ponds. The optimum ratio of La(III):zeolite for the simultaneous removal of ammonia and phosphate was 0.0048 La(III) g:1 zeolite g. The drying temperature of La(III)-zeolite composite severely affected phosphate adsorption showing optimum condition at room temperature. It was revealed that the optimum dosage of La(III)-zeolite composite was 4.052 g/L at adsorption time of 90 min. The presence of alkalinity in aqueous solution brought positive effect on phosphate adsorption. Detachment of La(III) from La(III)-zeolite composite, which was dried at room temperature, was not observed in aquous solution. It indicates that La(III)-zeolite composite could effectively block phosphate released from sediment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.