Evaluation of the Impact on Surrounding Groundwater of Waterway Tunnel Excavation and Cofferdam Construction (터널 굴착 및 가물막이 시공에 따른 주변 지하수계 유동분석)

  • You, Youngkwon;Lim, Heuidae;Choi, Jaiwon;Eom, Sungill
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.6
    • /
    • pp.5-15
    • /
    • 2014
  • This study is to quantitatively evaluate the impact on surrounding groundwater of waterway tunnel excavation and cofferdam construction in which A-dam and B-dam, so prediction of groundwater fluctuation and tunnel lining installation was studied. As a result, drawdown of groundwater level during tunnel excavation and cofferdam construction occurred about 3.58 m in the tunnel shaft. The initial condition of groundwater level recovered by up to 90 % was simulated after the completed the construction of the tunnel and lining installation. Groundwater inflow in the tunnel evaluated was analyzed to have exceeding water design criteria of the tunnel. The groundwater inflow is reduced to maximum $0.006m^3/min/km$ after lining installation done in the tunnel, so effect of lining installation was evaluated as 93 % or more. Drawdown of about 0.04~0.31 m occurs in the houses and temples analysis of groundwater system of the surrounding area from construction. Drawdown has occurred nearly by considering annual groundwater level fluctuation of National Groundwater Observation Network.

Pre-reinforcing Grouting a Sand Gravel Layer for Tunnelling (모래자갈층에서 터널시공을 위한 굴착 전 그라우팅 보강 사례)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.26 no.6
    • /
    • pp.466-474
    • /
    • 2016
  • Pre-reinforcement with umbrella arch grouting is conducted around a tunnel where a portion of the upper part of the tunnel is located in a sand and gravel layer. Surroundings of a first tunnel situated below groundwater table are reinforced with LW or SSM that is composed of ultra-fine cement and injected into multi-stages through large diameter steel pipes. With them, a first tunnel is safely excavated without both leaking of groundwater and fallings of sand and gravel from the arch. A second tunnel where groundwater is drained down to the bedrock is reinforced with jet grouting. The effect of the pre-grouting reinforcement is monitored by checking whether groundwater is dripping or sand or gravel is falling from the arch of the tunnels.

Access Risk Evaluation System for Underground Tunnels Based on Precipitation Amount (강수량 기반 지하 터널 진입 위험도 판단 시스템)

  • Wonbin Choi;Sihoon Lim;Dabin Jang;Sangdae Kim
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2023.11a
    • /
    • pp.134-135
    • /
    • 2023
  • 수재해의 증가로 인한 지하차도 침수 사고가 빈번히 발생하고 있다. 지하차도 침수 사고를 예방하기 위한 여러 대비책들이 있지만, 예방적 관점에서 볼 때 사람이 직접 모니터링 하는 방법 이외에는 적절한 예방책이 되지 못한다. 이러한 문제를 해결하기 위해 강수량에 따른 지하차도 진입 여부 시스템을 제안한다. 강수량과 배수량의 차이를 통해 침수 위험도를 판단하여 진입 여부를 파악 후 운전자에게 정보를 전달해 사고를 예방할 수 있다.

Evaluation of Drainage System and Coupled Analysis of Heat Transfer and Water Flow for Ice Ring formation in Daejeon LNG Pilot Cavern (대전 LNG Pilot Cavern에서의 배수시스템 평가 및 Ice Ring 형성에 관한 냉열수리 연동해석)

  • Jeong Woo-Cheol;Lee Hee-Suk;Lee Dae-Hyuck;Kim Ho-Yeong;Choi Young-Tae
    • Tunnel and Underground Space
    • /
    • v.16 no.1 s.60
    • /
    • pp.38-49
    • /
    • 2006
  • LNG storage in lined rock cavern demands various techniques concerned with rock mechanics, thermo-mechanics and hydrogeology in design, construction and maintenance stage. LNG pilot cavern was constructed in Daejeon in order to verify these techniques. In this paper, evaluation of drainage system and ice ring formation was studied by numerical simulation. By Modflow analysis in the viewpoint of aquifer and Seep/W analysis in the viewpoint of flow system, it was verified that the drainage system in the pilot cavern was efficiently operated. Since ice ring formation can be simulated by interactive relation between heat transfer and water flow, coupled analysis of those was performed. In this analysis, the position of ice ring was presumed and it was demonstrated that the formation is affected by velocity and direction of groundwater flow.

Evaluation of waterproof and durability of hydrophilic waterstop (수팽창 지수재의 방수 성능 및 내구성 평가)

  • Choi, Woo-Yong;Lee, Hyeun-Pil;Jun, Gy-Chan;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.117-124
    • /
    • 2014
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic waterstop by the construction error and excessive displacement of segment was studied firstly. Secondly, the decrease of durability of hydrophilic waterstop by the sulphate and chloride contained in the groundwater and seawater was investigated. The results showed that if the angle discordance at the segment joints is beyond the 2 degree, the proper waterproof capacity of hydrophilic waterstop can not be guaranteed. In addition, if the hydrophilic rubber waterstop is exposed to the sulphate for a while, the proper durability of hydrophilic waterstop can not be expected.

Waterproofing performance evaluation according to the number of layer for shield TBM segment hydrophilic rubber waterstop (쉴드 TBM 세그먼트 지수재의 배열수 변화에 따른 방수성능 평가)

  • Ham, Soo-Kwon;Jung, Hoon;Kim, Beom-Ju;Jeong, Kyeong-han;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.47-58
    • /
    • 2020
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic rubber waterstop by the construction error and excessive displacement of segment was studied. In particular, the waterproof capacity of each of single and double layer arrangements of hydrophilic rubber waterstop was examined to verify the efficiency of the double layer arrangement. The test results show that the single layer and double layer hydrophilic rubber waterstop showed the same waterproof performance. hydrophilic rubber waterstop has favorable on the offset, however unfavorable on the gap.

Development of high performance shotcrete for permanent shotcrete tunnel linings (Application of high-early strength cement with alkali-free accelerator in spring water condition) (영구 숏크리트 터널 라이닝 구축을 위한 고성능 숏크리트 개발 (용수부에서의 조강시멘트와 alkali-free급결제 적용 검토))

  • Park, Hae Geun;Lee, Myeong Sub;Kim, Jea Kwon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.1
    • /
    • pp.23-31
    • /
    • 2003
  • Since the mid of 1990, permanent shotcrete tunnel linings such as Single-shell and NMT have been constructed in many countries for reducing the construction time and lowing construction costs instead of conventional in-situ concrete linings. Among essential technologies for successful application of permanent shotcrete linings, high performance shotcrete having high strength, high durability and better pumpability has to be developed in advance as an integral component. This paper presents the idea and first experimental attempts to increase early strength and bond strength of wet-mixed Steel Fiber Reinforced Shotcrete (SFRS) in spring water condition. In order to increase early behavior of SFRS, a new approach using high-early strength cement with alkali-free liquid accelerator has been investigated. From the test results, wet-mix SFRS with high-early strength cement and alkali-free accelerator exhibited excellent early compressive strength improvement compared to the ordinary portland cement and good bond strength even under spring water condition.

  • PDF

Waterproofing performance evaluation according to each waterproofing material due to segment construction error (세그먼트 시공오차에 따른 이음부 지수재별 방수성능 평가)

  • Heo, Seung-Mu;Jung, Hoon;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1023-1037
    • /
    • 2018
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic rubber waterstop and gasket, respectively by the construction error and excessive displacement of segment was studied. The test results show that hydrophilic rubber waterstop has favorable on the offset, however unfavorable on the gap. On the other hand, gasket has unfavorable on the offset, however favorable on the gap.

Case Study on defects of Tunnel Drainage in Subway (지하철의 터널 배수체계에 따른 결함 사레)

  • Kim Suk-Cho;Lee Jae-Uk;Cho Sung-Woo;Shin Yong-Suk
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.292-298
    • /
    • 2005
  • Tunnel in subway should be designed as a water-proof type tunnel as much as possible but it is difficult to make it come true due to several facts, such as construction technique and cost. A drainage type tunnel as a substitute of a water-proof tunnel lead to the increase of water pressure on the concrete lining that make bad effect to tunnel structure when it has some problem to operate the drainage system. Throughout studying about cases on defects of tunnel drainage in subway We hope it contributes to tunnel maintenance.

  • PDF

Groundwater Flow Analysis During Excavation for Underground Tunnel Construction (지하 터널 건설을 위한 굴착 시 지하수 유동 분석)

  • Sungyeol Lee;Wonjin Baek;Jinyoung Kim;Changsung Jeong;Jaemo Kang
    • Journal of the Korean GEO-environmental Society
    • /
    • v.25 no.6
    • /
    • pp.19-24
    • /
    • 2024
  • Urban densification has necessitated the development of subterranean spaces such as subway networks and underground tunnels to facilitate the dispersal and movement of populations. Development of these underground spaces requires excavation from the ground surface, which can induce groundwater flow and potentially lead to ground subsidence and sinkholes, damaging structures. To mitigate these risks, it is essential to model groundwater flow prior to construction, analyze its characteristics, and predict potential groundwater discharge during excavation. In this study, we collected meteorological, topographical, and soil conditions data for the city of ○○, where tunnel construction was planned. Using the Visual MODFLOW program, we modeled the groundwater flow. Excavation sections were set as drainage points to monitor groundwater discharge during the excavation process, and the effectiveness of seepage control measures was assessed. The model was validated by comparing measured groundwater levels with those predicted by the model, yielding a coefficient of determination of 0.87. Our findings indicate that groundwater discharge is most significant at the beginning of the excavation. Additionally, the presence of seepage barriers was found to reduce groundwater discharge by approximately 59%.