Kim, Soo-Lo;Kim, Tae-Heok;Shin, Dong-Chun;Kwon, Hyun-Ho
Tunnel and Underground Space
/
v.19
no.6
/
pp.534-544
/
2009
The collapse of the underground cavity can cause the abrupt local subsidence of the ground surface. It can be hazardous to the stability of road and building for human activity. Therefore it is necessary to develop reinforcement methods for the filling of the underground cavity. This study was executed to improve the material quality and systems to fill the calcium-aluminate mineral $(C_{12}A_7)$ environmentally, and minimize the loss of filling materials for the steep underground cavity. Filling material which was developed in this study is composed of rapid hardening material and additives. The developed material had rapid hardening and non-separation ability in the water cavity condition, so it made the effective underground dam in the cavity with prevention of material loss when it was poured in the water cavity. Results of heavy metal leaching test for environmental assessment showed that it was environmentally suiTable material for the filling in the mine cavity.
Park, Boyoung;Park, Sebeom;Choi, Yosoon;Park, Han-Su
Tunnel and Underground Space
/
v.25
no.4
/
pp.373-382
/
2015
This study presents a method to calculate carbon dioxide emissions of diesel vehicles operated in an underground mine using Geographic Information Systems (GIS). An underground limestone mine in Korea was selected as the study area. A GIS database was constructed to represent the haulage roads as a 3D vector network. The speed of dump trucks at each haulage road was investigated to determine the carbon dioxide emission factor. The amount of carbon dioxide emissions related to the truck's haulage work could be calculated by considering the carbon dioxide emission factor at each haulage road and the haulage distance determined by GIS-based optimal route analysis. Because diesel vehicles are widely utilized in the mining industry, the method proposed in this study can be used and further improved to calculate the amount of carbon dioxide emissions in mining sites.
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.3
/
pp.611-619
/
2017
This paper intends to develop unit water production cost (UWPC) between alternative water resources including desalination, freshwater reservoirs, single-purpose dams, underground dams, and two indirect water in-take technologies - riverbank filtration and aquifer storage and recovery (ASR). The UWPCs of water supply schemes including each alternative are determined based on project cost, and operation and maintenance estimation models, which were developed based on real project cost data. The sensitivity analysis of UWPCs reveals that ASR is the lowest cost option in producing drinkable water among the alternatives, followed by riverbank filtration and underground dam. It is expected that economics related to the finding plays a critical role in supporting water resources planning and budget allocation for central and local water authority in Korea.
Journal of Korean Tunnelling and Underground Space Association
/
v.18
no.6
/
pp.581-591
/
2016
Several attempts to construct multi-purpose tunnel for both road and waterway have been made. The multi-purpose tunnel is mainly used as a road tunnel, however it is transferred to waterway to control flood during rainy season. The planning of the multi-purpose tunnel is recognized as cost-effective way of infrastructure construction. In case of the multi-purpose tunnel constructed beneath groundwater table, seasonal fluctuation of groundwater table and repeated flow in the tunnel may cause long-term deterioration of the tunnel system. In this study, the behavior of multi-purpose tunnel in view of groundwater table or flow in the tunnel is investigated using model test and numerical modeling method. The results have shown that rising of groundwater table caused buoyant force to the tunnel and the fluctuation of rainwater in the tunnel generated loosening of surrounding ground. It is recommended to evaluate the effect of the long-term water pressure variation in the design of a multi-purpose tunnel.
Lee Dong-Kee;Park Jae-Hyeoun;Park Chang-Kun;Yang Jung-Suk;Nam Do-Hyun;Kim Dae-kun;Jeong Gyo-cheol;Choi Yong-sun;Boo Sung-an
The Journal of Engineering Geology
/
v.14
no.4
s.41
/
pp.391-400
/
2004
Excess pumping on the river bank filtration well causes the over drawdown in the protected area of bank, which may make many problems such as soil water contents, Pumping head in the irrigated land, and it needs more irrigation and development of the deeper irrigating well. In this study the installation of the artificial recharging well was suggested to reduce the excess draw down in the protected land. Artificial recharging wells were applied at the bank filtration site of Changwon city by using Visual-MODFLDW. The optimized conditions are calculated that the recharging well is located about loom apart from the pumping well, and the recharging rate is $5\%$ of the pumping yield.
Physical models of underground mines are very useful to the design of mine openings and the management of work progress of mining companies as well as to consulting. Even though 3D image realization techniques for mine openings have already been developed by various companies the physical models are still widely used because they can provide better understanding without sophisticated equipments for the most of people. Conventional materials for the physical models are paper and acryl which demand a lot of time and labor to make the model even with low precision and high cost. In this research, 3D printing technique is adopted to develop the physical model with relatively short time, low cost, and proper degree of precision. Finally the computer software "UMine2STL" was developed and verified by comparing the printed product with its design.
This case study introduces the construction of large cross section tunnel for underground ventilation system in Sillim-Bongcheon Tunnel Project. In order to grant the safety and efficiency in connecting the ventilation shaft (7.8 m of width, and 6.6 m of height) to a tunnel for axial fan facility (20.8 m of width, and 12.3 m of height), gradual enlargement of tunnel cross section was employed between those and temporary support method was determined based on Q system. In addition, some original designs were revised during construction stage to improve the efficiency of excavation in large cross section tunnel. The advance length was optimized and top heading of the tunnel was excavated without partition in accordance with ground condition and numerical stability analysis results. It is believed that some experiences and considerations in this case study will be useful for the future design and construction in similar large cross section tunnel such as large underground ventilation system or road tunnel with four lanes.
The logistics of ammunition stored in the underground ammunition warehouse has more difficulties than the logistics of ammunition stored on the ground due to the nature of the storage space. This study was conducted to solve the logistics of underground ammunition warehouse by improving these problems. And six items such as guard, safety, environment, supply system, equipment, facilities, and life management were selected for the improvement of logistics. And AHP was analyzed by Expert Choice program by conducting a survey to experts. As a result of the analysis, it was confirmed that the importance was high in the order of safety, guard, life management, equipment facilities, supply system, and environment. Based on the selected items and the results of the survey, a plan to build a network-based integrated platform that can improve logistics in an underground ammunition warehouse was presented. This study will be used as a basis for the establishment of an integrated platform when constructing an underground ammunition warehouse in the future. This study can be applied to storage facilities that store other materials in the military, and it is expected to be applied to large commercial storage facilities.
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.412-412
/
2023
정부는 2027년까지 식량자급률 55.4%를 달성하고, 채소·과실류 국내 공급 여력의 85% 수준을 유지하기 위한 적정 농지면적 150.0만ha가 필요하다고 추정하였다. 그리고 정부는 적정 면적 확보를 위해서 농지보전 목표가 포함된 중장기 기본계획을 수립할 예정이다. 이러한 식량자급률 달성과 채소 및 과실류 재배 면적 확보를 위해서는 논의 다각적인 활용 방안을 모색할 필요가 있다. 왜냐하면 최근 쌀 공급과잉 문제를 해결하기 위해 최근 '양곡관리법'이 정치적 이슈로 등장할 만큼 쌀 공급과잉 해소와 논 농지의 효율적인 활용에 대해 사회적 관심이 많다. 이러한 맥락에서 본 연구에서는 우리나라 최초로 논 배수 개선을 위해 지하암거가 설치된 경북상주시 공검면 일대를 대상으로 암거배수의 성과를 살펴보고 개선방안을 모색하였다. 이를 위해 본 연구에서는 지하암거 설치로 배수여건이 개선된 수혜농가 42명을 대상으로 심층면담을 실시하였다. 사례지역은 오태저수지를 기점으로 시작하는 공검소하천 양안에 넓게 위치하고 분지지형으로 하천보다 낮은 저지대로, 평상시·강수시 지하수위가 높아 습답이 형성되어 영농기계 사용이 어렵고, 일부지역의 경우 작물 파종, 수확을 하지 못하는 등 피해 발생하여 영농여건이 매우 불리한 지역이다. 이러한 배수불량을 개선하기 위해 수혜면적 55.6ha에 (지하)배수가 정비되었다. 이러한 배수 개선이 지역 영농에 미치는 효과는 다음과 같이 분석되었다. 첫째, 수혜구역 내 농가들은 배수불량으로 농기계 작업이 불편하고, 논의 습답을 제거하기 위해 해당 시설에 대한 필요성을 느끼고 있다. 또한 암거배수 시설로 인해 약 72% 농가들은 습답 개선의 효과가 있는 것으로 나타났다. 둘째, 전체 수혜농가의 약 72%는 암거시설로 인해 논의 습답이 개선된 것으로 나타났다. 특히, 암거시설로 인해 물빠짐이 개선되었고, 농기계 작업이 용이하게 되었다. 다만 사업 첫해에는 논을 파헤쳐 농기계가 빠지는 피해가 있었지만, 2차년도부터는 논이 정비되어 농기계 빠지는 피해는 없는 것으로 분석되었다. 셋째, 수혜 농가들이 느끼는 "습답 피해가 매우 있음"은 사업 시행 전 51.61%에서 사업 완료 후에는 4.17%로 급격히 감소하였다. 또한 "습답 피해가 전혀 없음"을 느끼는 농가는 사업 시행 전 3.23%에 불과했지만, 사업 완료 후에는 20.83%로 급증하였다.
Proceedings of the Korean Institute of Industrial Safety Conference
/
2000.11a
/
pp.243-250
/
2000
배관을 지하에 매설할 경우 매설배관이 묻히는 깊은 도랑을 트랜치라 하는데 이 트랜치의 폭과 깊이의 칫수를 적절하게 결정하는 것은 매설배관의 건전성을 유지하는데 중요한 인자중의 하나이다. Watkins는 매설배관의 트랜치 폭에 대한 연구를 수행하여 최근 그 결과를 발표한바 있다. (1) Fig. 1에 트랜치와 배관의 단면도를 그리고 일반적으로 사용하는 기술적인 용어를 나타내었다.(중략)
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.