• Title/Summary/Keyword: 지하굴착공법

Search Result 217, Processing Time 0.019 seconds

A Study on the Compression of Construction Period by the Improvement of Trench Excavation for Slurry Wall Method (지하연속벽 시공 시 트렌치 굴착방법 개선을 통한 공기단축에 관한 연구: 현장적용사례를 중심으로)

  • Lee, Young Soo;Park, Hyung-Keun;Kang, Kyubyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.499-505
    • /
    • 2012
  • As the excavation depths during excavation works in urban sites are getting deeper and bigger, It is necessary to study for the improvements to solve the problems in the excavation processes. This research deals with the excavation method that can not only minimize the effect on the surrounding constructions, but also shorten the construction period of the excavation work. For this research, there have been an extensive literature review of the bibliographic data about Slurry Wall Method, which is recognized around the world, and the analysis of the major problems in the existing ineffective construction step. These efforts led to the technical improvements. Accordingly, a new construction method applied with the new technical factors has been suggested, and it was possible to compare Slurry Wall Method with the construction method and analyze them on the base of the examples using the suggested method. This new method decreased the excavation period by 15 days. It took only 33days to finish the excavation work, as compared to 48 days that can be seen on the pre-modification schedule. Furthermore, the suggested method in this research is safer, more economically feasible, and better for the environment than Slurry Wall Method. It will contribute to shortening the construction period of Slurry Wall Method in the end.

Feasibility Study to Apply Automated Trench Cutter (지하연속벽 공법 자동화 도입 타당성 검토)

  • Park, Kyoung-Soon;Koo, Ja-Kyung;Lee, Tai-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.364-367
    • /
    • 2007
  • According to increase of construction projects which is accomplished in the town, diaphragm wall method was proposed. This method diminished noise and vibration. And it is able to excavate deeper than other methods. But excavation work is difficult to maintain vertical and requires much time to work. Also the work result depends on know-how, experience and intuition of excavating machine operator. We interviewed technical experts related with slurry wall method and find equipment's characteristics. We used cost-concern matrix to investigate the propriety for the introduction of trench cutter automation. Through the research, it is proper to apply trench cutter automation.

  • PDF

Raise Boring Machines (수직굴착장비)

  • 이강문
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.4 no.4
    • /
    • pp.49-53
    • /
    • 2002
  • 향수직굴착용장비로는 승갱굴착기(Raise Boring Machine)과 레이스크라임버(Raise Climber)로 나눌 수 있다. 이장에서는 수직굴착용장비가 다수 있으나 일부장비를 간략하게 소개하며, 추후 공법에 대한 설명할 기회가 주어진다면 좀더 다양한 장비 및 공법에 대해 자세히 기술하도록 하겠다.

  • PDF

A preliminary study on economical efficiency of a room-and-pillar excavation method in comparison with 2-arch tunnelling method (2아치 터널 굴착 공법과의 비교를 통한 주방식 굴착 공법의 예비 경제성 검토 연구)

  • Lee, Chulho;Chang, Soo-Ho;Ahn, Sung-Youll;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.6
    • /
    • pp.599-612
    • /
    • 2013
  • This study aims to investigate an economical efficiency of two excavation methods with respect to the room-and-pillar method for the underground space and conventional excavation method, i.e. 2-arch tunnelling method. For feasibility study, an excavation cost for both room-and-pillar method and 2-arch tunnelling method was estimated when the same space in operation was required. It was assumed that properties of reinforcements and rock were adopted from literatures. However, an excavation shape of the room-and-pillar method was assumed not to be the rectangular shape which is a general type in the room-and-pillar method but to be an arch shape in order to compare with the conventional excavation method (2-arch tunnelling) and to achieve the maximum bearing capacity of the structure during excavation. Consequently, the wider space in use or required and the better condition of rock we assumed, the more economical advantage we have in the room-and-pillar method than the 2-arch tunnelling method.

Effects of free surface using waterjet cutting for rock blasting excavation (워터젯 자유면을 이용한 암반발파 굴착공법의 효과)

  • Oh, Tae-Min;Cho, Gye-Chun;Ji, In-Taeg
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.1
    • /
    • pp.49-57
    • /
    • 2013
  • The conventional blasting method generates serious blasting vibration and underbreak/overbreak in spite of its high efficiency for rock excavation. To overcome these disadvantages, this paper introduces an alternative excavation method that combines the conventional blasting process with the free surface on the perimeter of the tunnel face using waterjet cutting technology. This proposed excavation method has advantages of (1) reducing vibration and noise level; (2) minimizing underbreak and overbreak; and (3) maximizing excavation efficiency. To verify the effects of the proposed excavation method, field tests were performed with a smooth blasting method at the same excavation conditions. Test results show that the vibration is reduced by up to 55% and little underbreak/overbreak is generated compared with the smooth blasting method. In addition, the excavation efficiency of the proposed method is greater than that of the smooth blasting method. The proposed blasting method with a free surface using waterjet cutting can be applied to urban excavation construction as well as to underground structure construction.

Determination of the Construction Method for Young Dong Tunnel by Risk Assessment (위험도 분석기법에 의한 영동선 터널의 굴착공법 결정사례)

  • Kim, Yong-Il;Hencher, S.R.;Yoon, Young-Hoon;Cho, Sang-Kook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.13-25
    • /
    • 2002
  • The construction method for Young Dong Tunnel has been chosen following detailed risk assessment. In this paper, the specific risks to the project programme, associated with adopting either mechanical excavation in the form of a shielded TBM, or drill and blast excavation methods, are assessed. From the risk assessment results, and taking other important factors into account, such as project sensitivity and local experience, the recommendation is made that the relatively low risk drill-and-blast method is the most appropriate for construction of Young Dong Tunnel.

  • PDF

A preliminary study on the excavation sequence of a room-and-pillar underground structure by the drill-and-blast method (발파 굴착에 의한 주방식 지하구조물의 굴착공기 분석 연구)

  • Lee, Chulho;Hyun, Younghwan;Song, Junho;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.605-614
    • /
    • 2015
  • A room-and-pillar underground structure is characterized by its grid-type array of room and pillar. As a result, its construction and economical efficiency can be governed by excavation sequence. In this study, the construction period by the drill and blast method which can be treated as a main sequence for excavation was examined by considering the regulation for blasting and construction standard of estimation in Korea. To evaluate the construction period for the room-and-pillar underground structure constructed in 4 kinds of square-type area ($30{\times}30{\sim}57{\times}57m$), the concurrent excavation pattern which was suggested in the previous researches was used. From the suggested condition, the total construction period by drill-and-blast method can be estimated with the consideration of the construction area, number of jumbo drill and faces in operation.

Effects of Excavation Methods on Tunnel Deformation Behavior - A Numerical Investigation (굴착공법이 터널변위 거동에 미치는 영향 - 수치해석 연구)

  • Yoo, Chung-Sik;Kim, Joo-Mi;Kim, Sun-Bin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.4
    • /
    • pp.289-305
    • /
    • 2006
  • This paper presents the effect of excavating methods on tunnel behavior. As part of this study, it is preliminarily focused on the comparison of two different excavation methods, center diaphram (CD) method and ringcut (RC) method. Especially, the purpose of this research is to study the behavioral mechanism of two tunnels which share the same construction environment but different excavating method. Two numerical analysis models with the same tunnel section and material properties are compared in this study, and they are analyzed by 3D finite element analysis. In each model, face stability, crown displacement, ground settlement, and shotcrete-lining stress are computed, then the general behavior of CD method and RC method is studied. The results indicate that the CD method tends to be effective in controlling tunnel displacement while the RC method is more effective in controlling ground settlement. Design implications of the findings from this study are discussed.

A Case Study on Reinforcement Method by Excavation Adjacent to the Subway Tunnel using Numerical Analysis (수치해석을 통한 지하철 구조물 인접 굴착에 따른 보강공법 적용사례연구)

  • Byun, Yo-Seph;Jung, Kyoung-Sik;Chun, Byung-Sik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.9
    • /
    • pp.5-11
    • /
    • 2011
  • Recently, large and deep excavations are increasing. The damage of adjacent structures due to excavation has steadily increased with increasing construction demand. Especially in urban development and poor conditions, the excavation adjacent to the subway structures has caused a lot of problems. This paper was reviewed that the underground excavation and reinforcement of the status process through a case study on the field. And stability analysis through the case study evaluates applicability for reasonable reinforcement method by numerical analysis. As a result, the strata distribution condition of all 16 sites consisted of landfill from the top and distributed in the order of deposits, weathered soils, weak rock from the bottom. Also, when proceeding the excavation adjacent to structures, the location of site and layer conditions have highly effect on the results of the construction. Therefore, this study was applied reinforcement method to protect damage by excavation. Displacement and settlement were within allowable criterion and hence, stability of structure was analyzed as safe.