• Title/Summary/Keyword: 지연비용

Search Result 707, Processing Time 0.032 seconds

전력수요관리와 수요개발기기 보급지원제도-1

  • 봉수균
    • Electric Engineers Magazine
    • /
    • v.189 no.5
    • /
    • pp.52-58
    • /
    • 1998
  • 지금까지 전통적으로 추진되어 온 공급측면 위주의 전력수급 정책은 예측된 전력수요에 효율적인 공급설비를 확충하는 것으로 이루어져왔으나 전력수요관리는 예측된 전력수요를 경감 또는 평준화함으로써 신규공급설비의 투자를 회피 또는 지연시키고 기존설비의 이용효율을 높여 전력공급비용의 절감을 가능하게 하여준다.

  • PDF

TRL Impact on Development Schedule and Cost in the Aerospace Project (항공우주개발 프로젝트에서 개발기간과 비용에 대한 TRL의 영향 분석)

  • Hwang, Hyung-Won;Kim, Hong-Rae;Chang, Young-Keun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.40 no.3
    • /
    • pp.264-272
    • /
    • 2012
  • TRL has a direct impact on development schedule and cost in the system or technology development projects. If TRL capability of development organization for specified CTEs can be accurately assessed and the impact of TRL on development schedule and cost are analyzed as detailed as possible, the risk of development schedule delay and cost increase can be minimized during the development process. This paper describes analysis results of TRL impact on development schedule and cost in the aerospace project. The development schedule and cost change are quantitatively estimated for the TRL improvement in the Unmanned Aerial Vehicle(UAV) system development program.

A Study on Welding Joint Parts of Heavy Equipment (중장비용 용접구조물의 신뢰성 평가)

  • Ko, Jung;Cho, Yong-Geun
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2002.06a
    • /
    • pp.111-111
    • /
    • 2002
  • 당사 제품인 건설 중장비용 대형 용접 구조물에 대하여, 설계단계부터 구조해석 및 초도품에 대한 Rig Test, 실차 시험 등 여러 단계를 거쳐 내구성을 평가하고 있다. 그러나 용접품 특성상 수명 평가 및 예측이 용이하지 않아 특히 내구성 개선 또는 효율 증대를 위한 경량화 등의 필요에 따른 설계 변경시 시행착오를 거치는 경우가 많다. 이에 개발 일정의 지연, 시험 비용의 증대 등이 불가피하고, 보증 수명의 증대를 통한시장 확대 등에 있어서도 애로가 있다. 또한 기존 Rig Test의 경우도 실제 사용환경과의 차이 등으로 인해 필드에서의 사용 수명을 예측하는데 한계가 있다. 이에 당 센터에서는 통계적 분석을 통한 사용 조건의 DB 구축과 제품 품질 DB의 구축 및 통합을 통하여 제관품의 특성을 반영한 용접 구조물의 가속 수명 평가법의 신뢰도 향상과 시장 목표에 부합하는 최적 설계 달성을 위한 독자적 Tool을 개발하고 있으며, 이에 대한 첫 번째 과제로 기확보 데이터에 대한 상관관계를 분석하였다.

  • PDF

A study on TCO-based Return on Security Investment(ROSI) (TCO 기반 정보보호 투자수익율 (ROSI) 에 대한 연구)

  • Kim, Jeong-Deok;Park, Jeong-Eun
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2003.12a
    • /
    • pp.251-261
    • /
    • 2003
  • 최근 정보보호의 중요성에 대한 인식이 확산되고 있음에도 불구하고 정보보호에 관한 적절한 투자가 이루어지지 않아, 효과적인 정보보호 시스템 구현이 지연되고 있다. 이는 전 세계적인 경제불황이라는 원인도 있겠지만, 정보보호 투자에 대한 정당화 논리가 부족하여 최고 경영자의 의사결정에 적절히 반영되지 않은 이유가 더 크다고 할 수 있다. 정보보호는 조직의 업무 수행에 수반되는 부대비용 개념으로 인식되어 왔으며 이 결과 ROI 와 같은 정보보호 투자에 대 한 정당화 논리를 제공하지 못해 적절한 투자가 적절히 수행되지 못하였다. 따라서 최근에는 정보보호 투자에 대한 수익과 지출간의 관계를 통한 ROSI(Return on Security Investment) 분석을 통한 정당화 논리 전개에 대한 필요성이 대두되고 있다. 본 논문에서는 ROSI 산출에 대한 접근방법을 비교 분석하고 TCO(Total Cost of Ownership)를 이용한 ROSI 방법을 제시하고자 한다. TCO는 하드웨어 가격뿐만 아니라 기술지원 및 유지 지원 인력 등을 모두 고려한 총 소유비용이다. 즉 정보보호에 대한 정확한 총 비용을 구하는데 매우 적합하다고 할 수 있다. 본 연구의 결과는 기업들로 하여금 좀 더 효과적인 정보보호 투자 정당화 수단으로서 활용될 수 있을 것이다.

  • PDF

Packet Scheduling Algorithms that Support Diverse Performance Objectives in Enterprise Environment (엔터프라이즈 환경에서 다양한 서비스 요구사항을 지원하는 패킷 스케줄링 알고리즘)

  • Kim, Byoung-Chul;Kim, Tai-Yun
    • Journal of KIISE:Information Networking
    • /
    • v.27 no.3
    • /
    • pp.315-322
    • /
    • 2000
  • 네트워크에서 QoS를 보장하기 위해 최근에 제안되는 패킷 스케줄링 알고리즘은 대부분 우선 순위에 입각한 패킷 전송 서비스를 한다. 이러한 우선 순위를 유지하기 위한 큐의 관리에는 많은 비용이 들므로 QoS를 보장하는 네트워크에서 우선 순위 큐의 관리 비용을 줄이는 노력이 필요하다. 패킷 스케줄링 알고리즘 중 RPO+(Rotate Priority Queue)는 우선 순위 FIFO(First in first out)큐를 사용하여 주기 적으로 재명명되는 패킷 스케줄링 알고리즘이다. FIFO 큐에 패킷들을 근사 정렬하여 패킷의 우선 순위를 유지하므로 계산 복잡도를 줄이지만, 패킷 우선 순위를 유지하기 위해 2배(2P)의 큐를 필요로 한다.[1] 본 논문에서는 필요한 큐의 개수를 P개의 큐로 제한하여 큐에 대한 관리 비용을 줄였으며 엔터프라이즈 환경에서 애플리케이션이 요구하는 서비스 특성에 따라 클래스로 구분하여 적합한 패킷 스케줄링 서비스를 제공하는 알고리즘을 제시한다. 본 기법은 추가적인 오버플로우 큐를 관리하고 패킷 어드미션 컨트롤러를 통해 패킷 전송 지연 시간을 제한함으로 다양한 애플리케이션의 네트워크 QoS 요구를 보장하고 패킷 전손 효율을 높였다.

  • PDF

Handover Mobility Scenario Classification and Fast Handover Performance Analysis in NEMO Network (NEMO에서의 이동 시나리오 분류 및 빠른 핸드오버 성능 분석)

  • Choi, Seung-Joon;Su, Dong;Yoo, Sang-Jo
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.31 no.11B
    • /
    • pp.987-996
    • /
    • 2006
  • In NEMO scenarios, mobile node's variety of movements and mobile router's point of attachment changes can result in handover. This handover process needs additional time to finish due to the multiple levels of indirection involved in NEMO. And the performance issues of mobile node's handover such as handover delay and packet loss in above cases haven't been studied thoroughly. So, in this paper, we define fast handover failure cases in hierarchical mobile IPv6 network based NEMO. We briefly described NEMO architecture and handover procedures of FMIPv6 and HMIPv6. And then, we classified mobile node or mobile router's movement pattern into several scenarios. Analysis for the fast handover classified NEMO scenarios, in terms of handover latency and packet delivery cost have been performed.

Performance Analysis of Fault-Tolerant Scheduling in a Uniprocessor Computer (단일칩 컴퓨터의 결함허용 스케쥴링 성능 분석)

  • Kim, Sung-Soo
    • The Transactions of the Korea Information Processing Society
    • /
    • v.5 no.6
    • /
    • pp.1639-1651
    • /
    • 1998
  • In this paper, we present analytical and simulation models for evaluating the operation of a uniprocessor computer which utilizes a time redundant approach (such as recomputation by shilted operands) for lault-tolerant computing. In the proposed approach, all incoming jobs to the uniprocessor are duplicated, thus two versions 01 each job must be processed. Three methods for appropriately scheduling the primary and sL'Condary versions of the jobs are proposed and analyzed. The proposed scheduling methods take into account the load and the fault rate of the uniprocessor to evaluate two figures of merit for cost and profit with respect to a delay in response time due to faults and fault tolerance. Our model utilizes a fault-tolerant schedule according to which it is possible to find an optimal delay (given by $\kappa$) based on empiric parameters such as cost, the load and the fault rate of the uniprocessor.

  • PDF

A Case Study of Applying Electronic Detonator in Limestone Quarry (석회석 광산에서 전자뇌관의 적용성에 관한 연구)

  • ;;;Dave Kay
    • Explosives and Blasting
    • /
    • v.22 no.2
    • /
    • pp.1-11
    • /
    • 2004
  • 일반적으로 국내 석회석 광산에서의 발파는 20ms나 25ms 시차를 가지는 지발발파로 시행되어지고 있다. 국외에서는 전자뇌관을 사용하여 암반의 지질학적인 특성에 따라 지발 시차를 사용자의 현장에 따라 선정하여, 주변 보안 물건에 따른 진동 및 소음을 경감하면서, 1회 발파의 생산량을 증대할 수 있으며, 2차 파쇄 비용 및 적재비용을 절감하는 최적의 시차를 적용하여 발파 규모를 줄이지 않는 발파패턴을 적용하고 있다. 본 연구는 해외에서 사용되고 있는 전자뇌관을 국내 현장 석회석 광산(단양)에 적용함으로 최적지연시차를 찾아내는 방법과 초시의 오차에 따른 문제점과 향후 국내 적용성을 판단하고자 하였다. 대규모 석회석 광산을 대상으로 최적시차를 판단하고자 동일 패턴에서 시차를 6ms ~ 30ms로 시험발파를 시행하여 4가지 요소 발파진동속도, 주 주파수특성, 파쇄입도, 암석 이동 및 버력의 상태를 분석하여 각 시차에 따른 배점을 두어, 당 현장에 요구되는 개별 가중치를 선정하여 분석하였다. 분석 결과 당 현장에서의 발파결과에 따른 요소별 가중치를 발파진동속도(20), 주 주파수 특성(20), 파쇄입도(40), 암석 이동(10) 및 버력의 상태(10)로 하여 분석한 결과 15ms가 최적시차로 나타냈다. 향후 각 현장에 적합한 요소별 가중치를 선정하여 현장별 최적시차를 도출한다면 최적의 발파효과를 있을 것으로 판단된다.

A Basic Study on the Improvement for Liquidated Damages at Construction Delay (지체상금 개선방안에 관한 기초연구)

  • Kook, Dong-Hoon;Son, Ki-Young;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.458-461
    • /
    • 2006
  • With the opening in construction market, more diversified and internationalized construction culture is imported, but the level of our construction culture and policy is still not met the international standards. For example, there is a difference in the liquidated damages at delay due to the reason of builder imputation during the public construction project comparing the international standards like damages. It may lead to the potential claim. In this study, via comparing and analysis on the relevant international standards and extension expense for terms of work, actual compensation is selected, and improvement of liquidated damages like damages is presented.

  • PDF

Development of SWRO-PRO hybrid process simulation and cost estimation program (역삼투-압력지연삼투 조합공정 공정모사 및 비용예측 프로그램 개발)

  • Choi, Yongjun;Shin, Yonghyun;Lee, Sangho;Kim, Seung-Hyun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.30 no.3
    • /
    • pp.299-312
    • /
    • 2016
  • The main objective of this paper is to develop computer simulation program for performance evaluation and cost estimation of a reverse osmosis (RO) and pressure-retarded osmosis (PRO) hybrid process to propose guidelines for its economic competitiveness use in the field. A solution-diffusion model modified with film theory and a simple cost model was applied to the simulation program. Using the simulation program, the effects of various factors, including the Operating conditions, membrane properties, and cost parameters on the RO and RO-PRO hybrid process performance and cost were examined. The simulation results showed that the RO-PRO hybrid process can be economically competitive with the RO process when electricity cost is more than 0.2 $/kWh, the PRO membrane cost is same as RO membrane cost, the power density is more than $8W/m^2$ and PRO recovery is same as 1/(1-RO recovery).