Analysis on the Construction Cost of Steel Truss Stadium (철골 트러스 스타디움 구조물의 공사비 분석)

  • Jang, Myung-Ho;Sur, Sam-Yeol
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.2 s.24
    • /
    • pp.75-82
    • /
    • 2007
  • Building costs means capital costs which include cost of land, cost of acquiring and preparing the site, construction costs, engineering fees, furnishings, cost of financing the project, and cost of management required to run and maintenance the building for use. An economic analysis is one of the most important factor to determine the project feasibility. The purpose of the this study is to analysis on the construction cost structure of steel truss stadium.

  • PDF

Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok (초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 -)

  • Kang, Seunghee;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.48-56
    • /
    • 2020
  • Prediction of construction cost in the planning stage that provides basic information for feasibility study, budgeting, and planning is an important factor for successful project execution. In this study, a prediction model was developed for the purpose of improving the accuracy of estimating the construction cost of Hanok in the planning stage. The cost of this model is estimated by two methods. First, the cost of wood work, which accounts for the largest portion of the total construction cost, is estimated by calculating the approximate quantity under various conditions (structure type, roof type, plane type, etc.). Second, the cost of the rest work sections except the wood work is estimated by using the unit cost model. The predictive model was verified by two case projects, and the error rate of total construction cost was -4%(case 1) and -6%(case 2). These results showed an error rate in the range that can be applied to practice in the planning stage.

Analysis on the Construction Cost of Spatial Structures (대공간 구조물의 공사비 분석)

  • Jang, Myung-Ho;Sur, Sam-Yeol
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.3 s.25
    • /
    • pp.133-140
    • /
    • 2007
  • Spatial structures is a appropriate shape that resists external force with only inplane force by reducing the influence of bending moment, and it maximizes the effect of structure system. An economic analysis is one of the most important factors to determine the project feasibility. Large spatial structures project is more need to comprehensive technology than a general construction project. In order to result in success of these project, it is desired that analyze an essential elements(for example, large budget, professional engineer, construction method, etc.) in the whole life cycle of buildings by schematic preparation from the early feasible study steps. We collect the data and analyze construction cost through this study which examines general remarks of existing spatial structures and researches its examples. This study is aimed to apply basic data to establish database the spatial structures.

  • PDF

Comparative Analysis of Construction Productivity for Modernized Korean Housing (Hanok) (보급형 신한옥 개발을 위한 건설 생산성 분석)

  • Kim, Min;Kim, Yesol;Lee, YunSub;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.107-114
    • /
    • 2013
  • The interest in traditional Korean housing has greatly increasing in Korean housing market. However, it is difficult to wildly disseminate for a high construction cost reason. In order to effectively facilitate the Hanok construction, Korean government has initiated a project that develops a new style Korean housing, which meets the requirements of low cost and modernized life style. Cost of building is mainly affected by materials and construction methods. Hanok has some special commodities those significantly impact the cost. In order to effectively cut down the costs, well-organized planning for costs is very important. Also, improving the productivity by utilizing new materials and methods can result in cost down. In this context, this paper compared and analyzed two different types of Korean housing; one is a modernized Korean house which used new materials and methods, the other is a traditional Korean house which was build up by purely traditional methods. Productivity has also been compared and analyzed for 5 major commodities between two types of models. Based on these comparative data, effect of cost down by new model has been analyzed. As a result it is confirmed that by using the new materials and methods could highly effect to increasing productivity and cost down. Especially, the cost of Roofing have been more influenced by using new material while the Wood and Finishes have been influenced by new construction method. Construction cost of Foundation (Earthwork, Concrete, Masonry) and Openings were influenced both factors, changing of materials and methods.

Interview - Yooshinjae - House of thoughts and trust Achieved the usability of modern space while preserving the old prototype (인터뷰 - 유신재⋯옛 원형 보존하며 현대적 공간의 사용성 이뤄내다)

  • Yuk, Hye-Min
    • Korean Architects
    • /
    • s.630
    • /
    • pp.16-21
    • /
    • 2021
  • 서울 용산구 한강대로에 위치한 529제곱미터 규모의 2층 사옥 '유신재'. 일제강점기 시절 건설된 벽돌(연와조)과 철근콘크리트조, 목조 트러스 지붕 구조의 이 낡은 건물은 준공(1926.06.23)된 지 90년이 훌쩍 넘었으며, 건물주인 (주)유신이 역삼동으로 사옥을 이전한 후 30여 년간 문서보관소로 사용돼왔다. 그런 이 건물이 지난 4월부터 8월까지의 공사를 거쳐 유신건축(주.유신건축 종합건축사사무소)의 사옥으로 새롭게 태어났다. 근 100여 년의 흔적을 그대로 간직한 건물의 리모델링 설계자는 유신건축의 김지덕 건축사(부(父))·김우영 건축사(자(子)/ 영국왕립건축사) 부자(父子)다. 지난 9월 24일, 유신재에서 함께 일하고 있는 두 부자 건축사의 이야기를 직접 들어보았다.

  • PDF

Decision Support Model for Selecting of Lifting Methods for Large Spatial Roof Construction (대공간 지붕철골공사 양중공법 선정을 위한 의사결정지원모델)

  • Cha, Min-Su;Lee, Myung-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.5
    • /
    • pp.489-498
    • /
    • 2018
  • The purpose of this study was to propose a decision support model for selecting a lifting method of large spatial roof construction. First, we deducted influential factors consist of 6 factors and 19 sub-factors through literature reviews and expert's advices. Second, the relative importance of each factor was calculated by Analytic Hierarchy Process. As a result, 'site condition(0.237)' among 6 factors and 'available space of the site(0.118)' among 19 sub-factors were identified as the most important factor for selecting lifting method. In addition, methods and procedures were established for evaluating alternatives of lifting methods for each influential factor. A decision support model was completed by providing the Site Suitability Index(SSI) of each lifting method. Finally, we got advices form experts who were actually in charge of the works for large spatial construction project to validate the model. The model proposed in this study was analyzed to be useful in selecting the lifting method. The findings of this study are expected to support the decision making of on-site managers when they select the lifting method on the beginning of the project.

Deriving of Critical Factors for Construction Planning in Large Span Roof Construction (대공간 지붕 철골공사의 시공계획 중점관리항목 도출)

  • Lee, Myungdo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.1
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.

Analysis of Cause of Fire and Explosion in Internal Floating Roof Tank: Focusing on Fire and Explosion Accidents at the OO Oil Pipeline Corporation (내부 부상형 저장탱크(IFRT) 화재·폭발사고 원인 분석: OO송유관공사 저유소 화재·폭발사건을 중심으로)

  • Koo, Chae-Chil;Choi, Jae-Wook
    • Fire Science and Engineering
    • /
    • v.34 no.2
    • /
    • pp.86-93
    • /
    • 2020
  • This study aims to maintain the safety of an outdoor storage tank through the fundamental case analysis of explosion and fire accidents in the storage tank. We consider an accident caused by the explosion of fire inside the tank, as a result of the gradual spreading of the residual fire generated by wind lamps flying off a workplace in the storage tank yard. To determine the cause of the accident, atmospheric diffusion conditions were derived through CCTV image analysis, and the wind direction was analyzed using computational fluid dynamics. Additionally, the amount of oil vapor inside the tank when the floating roof was at the lowest position, and the behavior of the vapor inside the tank when the floating roof was at the highest position were investigated. If the cause of the explosion in the storage tank is identified and the level of the storage tank is maintained below the internal floating roof, dangerous liquid fills the storage tank, and the vapor in the space may stagnate on the internal floating roof. We intend to improve the operation procedure such that the level of the storage tank is not under the Pontoon support, as well as provide measures to prevent flames from entering the storage tank by installing a flame arrester in the open vent of the tank.

A Study on Qualification for Possessory Lien on and Auction of Unregistered Buildings (미완성건물의 유치권 및 강제경매 대상적격에 관한 연구)

  • Lee, Jae Seog;Jung, Bo Seon;Lee, Sang Youb
    • Korea Real Estate Review
    • /
    • v.28 no.4
    • /
    • pp.53-62
    • /
    • 2018
  • When the contractor does not receive payment for his work due to the client's funding default, he can take various legal measures against the client, in addition to refusing to transfer the building under construction to the client. To claim top payment priority and to demand the equal enforcement of the law by applying for compulsory auction or auction by exercising the right of lien, the contractor should know the construction phase or the point in time when he could exercise a lien or apply for a forced auction of the unregistered building. This study was conducted to examine qualification for lien and auction of an unregistered building. First, the general criteria for qualification for lien from qualification for ownership were examined. This means that an unregistered building can be subject to lien from a certain point in time in the construction phase, where the ownership is qualified as an independent real estate with minimal pillars, roofs, and walls. Second, the contents of the narrow and broad auction qualification were analyzed. As the contractor can select the appropriate legal means to reimburse the construction cost for the unregistered building, the results of this study are expected to provide the bases for qualification for lien on and auction of unregistered buildings.

A Study on the Design Concept & Construction Method of Office Building with Stacks at Thermal Power Plant (화력발전소 연돌통합형 종합사무동의 설계개념과 시공공법 연구)

  • Kim, Si-Hyun;Choi, Jang-Soon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.677-686
    • /
    • 2016
  • A thermal power plant is the first CFBC (Circulating Fluidized Bed Combustion) power plant consisting of 2 boilers-1 turbine. The optimal height of a stack needs to be approximately 156 meters in the case of this thermal power plant; however, the thermal power plant sites satisfy a function and reduce the construction cost by using mountains in the sites after cutting the ground and locating an integrated office and chimney at an altitude of 70 meters thereby lowering the height of the stack to 86 meters. In addition, the integrated office, which has a combined stack style with a unique design, is constructed by connecting with 2 stacks and disposing the office and an observatory in the space between them. Therefore, this study examined the design concept that fulfils the structural, functional, and aesthetic factors, harmoniously by joining the integrated office and the stack, which are disparate, and investigated special construction methods (Slip Form, Steel Inner Flue & Lift-up) through which heterogeneous architectures are structurally, functionally, and aesthetically constructed.