• Title/Summary/Keyword: 지능형 굴삭 시스템

Search Result 24, Processing Time 0.026 seconds

Development of the 3D Imaging System and Automatic Registration Algorithm for the Intelligent Excavation System (IES) (지능형 굴삭 시스템을 위한 모바일 3D 이미징 시스템 및 자동 정합 알고리즘의 개발)

  • Chae, Myung-Jin;Lee, Gyu-Won;Kim, Jung-Ryul;Park, Jae-Woo;Yoo, Hyun-Seok;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.136-145
    • /
    • 2009
  • The objective of the Intelligent Excavation System (IES) is to recognize the work environment and produce work plan and automatically control the excavator through integrating sensor and robot technologies. This paper discusses one of the core technologies of IES development project, development of 3D work environment modeling. 3D laser scanner is used for 3-dimensional mathematical model that can be visualized in virtual space in 3D. This paper describes (1) how the most appropriate 3D imaging system has been chosen; (2) the development of user interface and customization of the s/w to control the scanner for IES project; (3) the development of the mobile station for the scanner; (4) and the algorithm for the automatic registration of laser scan segments for IES project. The development system has been tested on the construction field and lessons learned and future development requirements are suggested.

A Study on the Design of Task Planning System for Intelligent Excavating System (IES) (지능형 굴삭을 위한 토공작업계획 시스템의 구조 설계)

  • Lee, Won-Sik;Song, Soon-Ho;Lee, Seung-Soo;Seo, Jong-Won;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.921-924
    • /
    • 2007
  • 토목, 건축과 관련된 노동현장은 여느 3D 업종들과 마찬가지로 숙련된 기능공의 부재 및 산업재해 발생으로 인해 어려움을 겪고 있으며 이를 극복하기 위한 노력을 계속하고 있다. 대표적인 토목공사인 토공 작업 역시 위험 혹은 유해한 작업환경으로 인해 토공장비의 안전사고 및 생산성과 품질저하가 발생하며 이를 방지하기 위한 장비의 지능화가 절실하게 요구되고 있다. 이를 위해 최근 지능형 굴삭 시스템 개발을 위한 연구가 진행되고 있으며, 토공작업은 일반적으로 광범위한 작업영역을 가지기 때문에 지능형 굴삭시스템의 개발을 위해서는 효율적인 작업을 수행할 수 있도록 하는 작업계획의 수립이 매우 중요하다. 본 연구에서는 작업계획의 대상을 굴삭로봇과 토사로 구분하였으며, 글로벌 영역에서 단위작업 영역, 로컬 영역으로의 분할을 통해 전체 작업 진행에 대해 효율적으로 작업계획을 수립할 수 있도록 구성하여 계획단계에서부터 토공작업 자동화 및 효율와에 기여하고자한다. 토공작업계획 시스템은 토공 작업자 및 감독자의 작업 특성 및 노하우를 컴퓨터, 즉 두뇌에 부여함으로써 숙련된 장비조종자의 작업 방법 및 특성을 반영하여 토공 작업 프로세스 모델링을 구축하고 실제 작업환경상의 센서에 의해 측정된 데이터를 실제 작업환경과 동일하게 모델링된 컴퓨터내의 가상환경을 바탕으로 영역분할, 최적 플랫폼 위치선정 및 작업 순차생성을 통해 최적의 토공작업계획을 수립할 수 있도록 한다.

  • PDF

A Study on Framework to Evaluate the Performance of Intelligent Excavation System (지능형 굴삭 시스템의 성능평가 프레임워크 구축)

  • Kim, Seok;Cho, Namho;Park, Jiyeon;Chae, Myung Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3D
    • /
    • pp.269-274
    • /
    • 2012
  • A study on automation system for construction industry has been conducted for decades. However, performance evaluation of automation system has not been suggested yet. The performance evaluation has been conducted only for partial technical elements or for benefits gained through the introduction. This study develops a framework to evaluate the performance of intelligent excavation system in terms of economic feasibility and benefit, and presents a performance evaluation method for automation equipments. The applicability of intelligent excavation system on a site is also analyzed in this study.

BIM Based Intelligent Excavation System (BIM 기반 지능형 굴삭시스템)

  • Kim, Jeong-Hwan;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.1-5
    • /
    • 2011
  • Earthwork is important in terms of construction time and duration, and highly related to the construction productivity. However, current earthwork system has stick to labor intensive process depending on skilled operator's heuristic decision making, so it is hard to improve overall productivity. To overcome this drawback, this paper presents a BIM based Intelligent Excavation System(IES). The BIM technology is applied in the excavation task planning system, Human-Machine Interface for remote-control/autonomous work environment, and web-based Project Management Information System(PMIS) in the IES integration process, and the results are addressed.

Development of Intelligent Excavating System - Introduction of research progress - (지능형 굴삭시스템 개발 - 2차 년도 연구내용 -)

  • Seo, Jong-Won;Kim, Young-Wook;Jang, Dal-Sik;Lee, Seung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.184-192
    • /
    • 2008
  • Recently, one of the solutions for the problems of construction industry such as low productivity, lack of experts, insufficiency of manpower, high percentage of calamity and so forth, construction automation which let underdeveloped construction production system be a ultramodern technology is under research. Internal study of construction automation has been initiated since 1980s focusing on robotics and semi-automation for reduction of labor. Therefore development of construction robots is being concentrated with the high development of information technology and Intelligent Excavating System(IES) project had been launched by ministry of land, transportation, and maritime affairs as one way of construction technology revolution business. This study introduces the final goal and the research progress until second year of IES.

  • PDF

Development of a Work Information Model and a Work Path Simulator for an Intelligent Excavation (지능형 굴삭을 위한 작업정보모델 및 작업경로 시뮬레이터 개발)

  • Kim, Sung-Keun;Min, Sung-Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3D
    • /
    • pp.259-267
    • /
    • 2012
  • The development of construction automation systems is proposed as a potent solution to the difficulties encountered by the construction industry and the preparation for the rapidly changing construction environment. A research concerning an intelligent excavation system has taken place since 2006. The intelligent excavation system has several functions for environment sensing, 3D site modeling, work planning, work path generation, unmaned control, and information management. This paper presents a space information model and a work path simulator for work planning and work path generation which is one of key technologies required to apply the earthwork system to the real world. A data structure for an earthwork site is suggested. It overcomes the limitations of previous data structures such as Quadtree and Octree. The work path simulator can generate an effective work path with considering information on work environment, equipment and operator's heuristic. The work path generated by the simulator is compared with that suggested by human operators.

Decision of Optimal Platform Location Considering Work Efficiency -Optimization by Excavator Specification- (작업의 효율성을 고려한 최적 플랫폼 위치 선정 방안 -굴삭기 제원에 따른 최적화-)

  • Lee, Seung-Soo;Park, Jin-Woong;Seo, Jong-Won;Kim, Sung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.790-793
    • /
    • 2008
  • Recently, Intelligent Excavating System(IES) for earthwork automation is on progress since the end of 2006 as a part of construction technology innovation projects in Ministry of Land, Transport and Maritime Affairs. Task Planning System(TPS), one of the detail core technologies of IES, is an optimal work planning system in conditions of effectiveness, safety and economic efficiency by analyzing the work environment data based on earthwork design and work environment recognition technology. For effective earthwork planning, the location of platform must be the most optimal spot for minimization of time, maximization of productivity and reduction of overlapped work spaces and unnecessariness. Besides, the decision of optimal platform location is to be based on the specifications and then is able to be converted with the local area calculation algorithm. This study explains the decision of optimal platform location on the basis of local area from the work space separate process and judges the effectiveness.

  • PDF

Object Detection From 3D Terrain Data Gener Ated by Laser Scanner of Intelligent Excavating System(IES) (굴삭 자동화를 위한 레이저 스캐너 기반의 3차원 객체 탐지 알고리즘의 개발)

  • Yoo, Hyun-Seok;Park, Ji-Woon;Choi, Youn-Nyung;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.130-141
    • /
    • 2011
  • The intelligent excavating system(IES), the development in South Korea of which has been underway since 2006, aims for the full-scale automation of the excavation process that includes a series of tasks such as movement, excavation and loading. The core elements to ensure the quality and safety of the automated excavation equipment include 3D modeling of terrain that surrounds the excavating robot and the technology for detecting objects accurately(i.e., for detecting the location of nearby loading trucks and humans as well as of obstacles positioned on the movement paths). Therefore the purpose of this research is to ensure the quality and safety of automated excavation detecting the objects surrounding the excavating robot via a 3D laser scanning system. In this paper, an algorithm for estimating the location, height, width, and shape of objects in the 3D-realized terrain that surrounds the location of the excavator was proposed. The performance of the algorithm was verified via tests in an actual earthwork field.

Development of the Local Area Design Module for Planning Automated Excavator Work at Operation Level (자동화 굴삭로봇의 운용단위 작업계획수립을 위한 로컬영역설계모듈 개발)

  • Lee, Seung-Soo;Jang, Jun-Hyun;Yoon, Cha-Woong;Seo, Jong-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.1
    • /
    • pp.363-375
    • /
    • 2013
  • Today, a shortage of the skilled operator has been intensified gradually and the necessity of an earthwork in extreme environment operators are difficult to access is increasing for the purpose of resource development and new living space creation. For this reason, an effort to develop an unmanned excavation robot for fully automated earthwork system is continuing globally. In Korea, a research consortium called 'Intelligent Excavation System' has been formed since 2006 as a part of Construction Technology Innovation Program of Ministry of Land, Transport and Maritime Affairs of Korea. Among detailed technologies of the Task Planning System is one of the core technologies of IES, this paper explains research and development process of the Local Area Design Module, which provides informatization unit to create automated excavators' work command information at operation level such as location, range, target, and sequence for excavation work. Designing of Local Area should be considered various influential factors such as excavator's specification, working mechanism, heuristics, and structural stability to create work plan guaranteed safety and effectiveness. For this research, conceptual and detail design of the Local Area is performed for analyzing design element and variable, and quantization method of design specification corresponding with heuristics and structural safety is generated. Finally, module is developed through constructed algorithm and developed module is verified.