• Title/Summary/Keyword: 주행강성

Search Result 114, Processing Time 0.021 seconds

A Study on Dynamic Capacity Assessment of PSC Box Girder High Speed Railway Bridges Using Time Series Load (시계열하중을 이용한 PSC 박스 거더 고속철도교량의 동적성능 평가에 관한 연구)

  • Han, Sung Ho;Bang, Myung Seok;Lee, Woo Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3A
    • /
    • pp.211-219
    • /
    • 2010
  • The design concept of high speed railway bridges is applied to a method for increasing the stiffness of existing bridge structures considering the impact factor by a static load. Generally, the process of structural design would be relied upon an advanced foreign technology. However, the dynamic amplification factor (DAF) and dynamic capacity assessment of high speed railway bridges may be conducted essentially a detailed estimation because the resonance phenomenon is affected by the long length (380 m) and high speed (300 km/h) moving of a high speed railway (Korea Train eXpress: KTX). Therefore, this study will be examined the dynamic capacity of the typical PSC Box Girder high speed railway bridge efficiently, and offered the basic information for the reasonable structural design. For this, the static analysis is conducted considering the load line diagram of KTX based upon existing references. In addition, the KTX moving load is transformed into the time series load considering various analytical variables. The time history analysis is assessed reasonable using the transformed time series load. At that time, analytical variables for calculating the time series load are considered loading node distance, time increment and KTX velocity variation etc. The dynamic capacity of the PSC Box Girder high speed railway bridge is examined based upon the FE analysis result systematically. The structural safety is assessed quantitatively in accordance with the related regulation of the inside and outside of the country.

A Dynamic Behavior Evaluation of the Curved Rail according to Lateral Spring Stiffness of Track System (궤도시스템의 횡탄성에 따른 곡선부 레일의 동적거동평가)

  • Kim, Bag-Jin;Choi, Jung-Youl;Chun, Dae-Sung;Eom, Mac;Kang, Yun-Suk;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.517-528
    • /
    • 2007
  • Domestic or international existing researches regarding rail damage factors are focused on laying, vehicle conditions, driving speed and driving habits and overlook characteristics of track structure (elasticity, maintenance etc). Also in ballast track, as there is no special lateral spring stiffness of track also called as ballast lateral resistance in concrete track, generally, existing study shows concrete track has 2 time shorter life cycle for rail replacement than ballast track due to abrasion. As a result of domestic concrete track design and operation performance review, concrete track elasticity is lower than track elasticity of ballast track resulting higher damage on rail and tracks. Generally, concrete track has advantage in track elasticity adjustment than ballast track and in case of Europe, in concrete track design, it is recommended to have same or higher performance range of vertical elastic stiffness of ballast track but domestically or internationally review on lateral spring stiffness of track is very minimal. Therefore, through analysis of service line track on site measurement and analysis on performance of maintenance, in this research, dynamic characteristic behaviors of commonly used ballast and concrete track are studied to infer elasticity of service line track and experimentally prove effects of track lateral spring stiffness that influence curved rail damage as well as correlation between track elasticity by track system and rail damage to propose importance of appropriate elastic stiffness level for concrete and ballast track.

  • PDF

Routine Off-pump Total Arterial Coronary Revascularization (심폐바이때스 없이 시행된 동맥 도관만를 이용한 관상동맥 완전 재관혈화)

  • Lee, Jae-Won;Park, Nam-Hee;Kang, Seong-Sik;Choo, Suk-Jung;Park, Seung-Jung;Park, Seung-Wook;Hong, Myeong-Ki;Song, Hyun;Song, Meong-Gun
    • Journal of Chest Surgery
    • /
    • v.36 no.5
    • /
    • pp.309-315
    • /
    • 2003
  • Background: To avoid the adverse effects of cardiopulmonary bypass and to overcome late vein graft failure we routinely peformed off-pump total arterial coronary revascularization. Material and Method: From July 2000 to August 2001, 104 consecutive patients underwent first elective off-pump total arterial coronary revascularization. Both internal mammary, radial and gastroepiploic arteries were used. Sequential and composite grafts were used to achieve complete revascularization. Perioperative adverse events and postoperative angiograms were analyzed. Result: A total of 252 arterial conduits were used with an average of 2.47 grafts per patient. A total of 326 distal anastomosis were performed with a mean of 3.13 distal anastomosis per patient. Cross over to on-pump occurred in seven patients (6.7%). Of these 4 were due to unstable hemodynamics during lateral or posterior wall stabilization as a result of cardiomegaly and 3 were due to uncontrolled bleeding during dissection of diffusely dimunitive deeply placed intramyocardial coronary arteries. There were no opeartive deaths. Two cases of perioperative myocardial infarction and transient neurologic complications occurred, respectively. Of the 312 distal anastomoses, 308 (98.7%) were compatible with Fitz-Gibboll A or B patency grading. Conclusion: Off-pump total arterial coronary revascularization was technically feasible in most elective cases with satisfactory early results. However, on-pump coronary bypass surgery should be considered in difficult circumstances, such as cardiomegaly or unfavorable anatomy of the target coronary artery.

A Study on Major Safety Problems and Improvement Measures of Personal Mobility (개인형 이동장치의 안전 주요 문제점 및 개선방안 연구)

  • Kang, Seung Shik;Kang, Seong Kyung
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.1
    • /
    • pp.202-217
    • /
    • 2022
  • Purpose: The recent increased use of Personal Mobility (PM) has been accompanied by a rise in the annual number of accidents. Accordingly, the safety requirements for PM use are being strengthened, but the laws/systems, infrastructure, and management systems remain insufficient for fostering a safe environment. Therefore, this study comprehensively searches the main problems and improvement methods through a review of previous studies that are related to PM. Then the priorities according to the importance of the improvement methods are presented through the Delphi survey. Method: The research method is mainly composed of a literature study and an expert survey (Delphi survey). Prior research and improvement cases (local governments, government departments, companies, etc.) are reviewed to derive problems and improvements, and a problem/improvement classification table is created based on keywords. Based on the classification contents, an expert survey is conducted to derive a priority improvement plan. Result: The PM-related problems were in 'non-compliance with traffic laws, lack of knowledge, inexperienced operation, and lack of safety awareness' in relation to human factors, and 'device characteristics, road-drivable space, road facilities, parking facilities' in relation to physical factors. 'Management/supervision, product management, user management, education/training' as administrative factors and legal factors are divided into 'absence/sufficiency of law, confusion/duplication, reduced effectiveness'. Improvement tasks related to this include 'PM education/public relations, parking/return, road improvement, PM registration/management, insurance, safety standards, traffic standards, PM device safety, PM supplementary facilities, enforcement/management, dedicated organization, service providers, management system, and related laws/institutional improvement', and 42 detailed tasks are derived for these 14 core tasks. The results for the importance evaluation of detailed tasks show that the tasks with a high overall average for the evaluation items of cost, time, effect, urgency, and feasibility were 'strengthening crackdown/instruction activities, education publicity/campaign, truancy PM management, and clarification of traffic rules'. Conclusion: The PM market is experiencing gradual growth based on shared services and a safe environment for PM use must be ensured along with industrial revitalization. In this respect, this study seeks out the major problems and improvement plans related to PM from a comprehensive point of view and prioritizes the necessary improvement measures. Therefore, it can serve as a basis of data for future policy establishment. In the future, in-depth data supplementation will be required for each key improvement area for practical policy application.