Power Network's Operation Influence Analysis of Wind Power Plant in Jeju island (제주지역 풍력발전기에 의한 전력계통운영 영향분석)

  • Kim, Young-Hwan;Choi, Byung-Chun;Jang, Si-Ho;Kim, Se-Ho;Jwa, Jong-Geun
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.127-129
    • /
    • 2005
  • Construction of wind power plant is increasing rapidly because Jeju island is known as the most suitable place for wind power plant. Rut wind power plant is difficult electric power control and it has a rapid electric power fluctuation. Such a problem has a bad influence on electric power network in small electric network like Jeju. Therefore, we forecast the amount of wind power plant construction by weather information and the rate of utilization for existing facility. We investigate the contribution degree for electric Power demand, economic effect, the case of power network influence. So we forecast influence of wind power plant for Jeju power network's operation in the near future.

  • PDF

Power Stabilization of Wind Farms in Jeju Island with BESS (BESS에 의한 제주지역 풍력발전단지의 출력 안정화)

  • Jin, Kyung-Min;Kim, DongWan;Kim, Eel-Hwan
    • Proceedings of the KIPE Conference
    • /
    • 2012.07a
    • /
    • pp.134-135
    • /
    • 2012
  • This paper analyzes the characteristics of the power system of Jeju island in 2014, which has wind farms with the support of BESSs (Battery Energy Storage Systems). In the simulation, the electrical loads are predicted based on Korea Power Exchange's data and the wind turbines are considered with new installed plans within 2014. The situation that some wind farms are forced to disconnect from the grid instantaneously is considered. The BESSs are controlled by using SOC (State of Charge) and power smoothing control algorithm. The simulation results show the effectiveness of the proposed method.

  • PDF

Characteristics of Wind Energy for Long-term Period (10 years) at Seoguang Site on Jeju Island (제주 서광지역에 대한 풍력에너지의 장기간 (10년) 특성)

  • Ko, Kyung-Nam;Kim, Kyoung-Bo;Huh, Jong-Chul
    • Journal of the Korean Solar Energy Society
    • /
    • v.28 no.3
    • /
    • pp.45-52
    • /
    • 2008
  • In order to clarify characteristics of variation in wind energy over a long-term period, an investigation was carried out at Seoguang site on Jeju island. The wind data for 10 years from Automatic Weather System (AWS) were analyzed for each year. The variation in the annual energy production (AEP) for the 2 MW wind turbine was estimated through statistical work. The result shows that the range of the yearly average wind speed at 15 m above ground level for 10 years was from -22.6% to +13.7%, which is wider range than that in Japan. The coefficient of variation for the AEP was 22.7%, which is about twice of that for the yearly average wind speed. Therefore, for estimating the wind energy potential accurately at a given site, the wind data should be analyzed over a long-term period based on the data from the meteorological station.

Forecasting of Short-term Wind Power Generation Based on SVR Using Characteristics of Wind Direction and Wind Speed (풍향과 풍속의 특징을 이용한 SVR기반 단기풍력발전량 예측)

  • Kim, Yeong-ju;Jeong, Min-a;Son, Nam-rye
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.42 no.5
    • /
    • pp.1085-1092
    • /
    • 2017
  • In this paper, we propose a wind forecasting method that reflects wind characteristics to improve the accuracy of wind power prediction. The proposed method consists of extracting wind characteristics and predicting power generation. The part that extracts the characteristics of the wind uses correlation analysis of power generation amount, wind direction and wind speed. Based on the correlation between the wind direction and the wind speed, the feature vector is extracted by clustering using the K-means method. In the prediction part, machine learning is performed using the SVR that generalizes the SVM so that an arbitrary real value can be predicted. Machine learning was compared with the proposed method which reflects the characteristics of wind and the conventional method which does not reflect wind characteristics. To verify the accuracy and feasibility of the proposed method, we used the data collected from three different locations of Jeju Island wind farm. Experimental results show that the error of the proposed method is better than that of general wind power generation.

Estimation of minimum BESS capacity for regulating the output of wind farms considering power grid operating condition in Jeju Isalnd (제주지역 계통운전조건을 고려한 풍력발전단지용 최소 BESS용량 산정)

  • Jin, Kyung-Min;Kim, Seong Hyun;Kim, Eel-Hwan
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.4
    • /
    • pp.39-45
    • /
    • 2013
  • This paper presents the estimation of minimum BESS capacity for regulating the output of wind farms considering power grid operating condition in Jeju Island. To analyze the characteristics of wind farm outputs with a BESS, the real data of wind farms, Sung-San, Sam-dal and Hang-Won wind farm, located in the eastern part of Jeju island is considered. The wind farms are connected to Sung-san substation to transfer the electric power to Jeju power grid. Consequently, at PCC (Point of Common Coupling), it can see a huge wind farm connected to the substation and thus it can be expected that the smoothing effect is affected by not only the different wind speeds for each area but also the different mechanical inertia of wind turbines. In this paper, two kinds of simulation have been carried out. One is to analyze the real data of wind farm outputs during a winter season, and the other is to connect a virtual BESS to eliminate the unintended generating power changes by the uncontrolled wind farm outputs as shown in the former data. In the conclusion, two kinds of simulation results show that BESS installed in the substation is more efficient than each wind farms with BESS, respectively.

The Study on the Mapping of Wind Resource using Moving Filter Technique at Udo, Jeju Island (무빙필터 기법을 적용한 제주 우도지역의 풍력자원지도 작성에 대한 연구)

  • Moon, Seo Jeong;Ko, Jung Woo;Lee, Byung Gul
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.20 no.4
    • /
    • pp.29-36
    • /
    • 2012
  • In order to create a wind resource map, we need wind data, contour map and roughness map. Moving Filter technique was applied to Udo of Jeju Island to improve the accuracy and efficiency of creating roughness map based on the Land Cover Map of the Ministry of Environment. The Land Cover Map was simplified using moving filtering, and the roughness map was created with this Land Cover Map. The wind resource map was created using this roughness map. Finally, we verified the validity and application of moving filter technique for wind resource map. As a result, the wind map which was created using the roughness map with moving filtering showed bias values which were all negative. It means the wind map is underestimated to values of wind energy and RMSE values were also from 0.0237m/s to 0.0253m/s at 50m height. In other words, estimation of wind resource using image filtering provides reliable results at 80m height typically when the wind turbine is installed. Finally, we found that image filtering technique is very useful tool to make wind resource map.

대체에너지 현주소

  • 전국보일러설비협회
    • 보일러설비
    • /
    • s.89
    • /
    • pp.57-59
    • /
    • 2001
  • 자원고갈로 인해 국가적 사명을 투자되고 있는 대체에너지 개발은 현재 답보상태에 머물고 있다는 평가가 지배적이다. 고유가 시대 도래로 인해 에너지비용이 증가하고 대외적으론 기후변화협약시대가 다가오면서 국내 산업체에겐 대체에너지 개발보급은 절대절명의 과제로 떠오르고 있다. 이는 심야전력 보급에서 정책적인 문제를 드러내면서 더욱 절실히 요구되는 실정이다. 그럼에도 현재 대체에너지 개발보급은 그동안 기술개발에 치중해 보급에는 문제점을 들어내고 있는 상태다. 88년부터 2000년말까지 태양열, 연료전지 등 11개 분야에 1742억원이 투자되었다. 부문별 보급실적을 보면 태양열의 경우 태양열 온수기 18만 5천대와 급탄설비 3천대, 태양관의 경우 마라도등 12000개소에 약 4000kw, 풍력은 제주지역 등 17기를 보급, 약8000KW, 폐기물은 서울 경기 부산 등에 473기를 설치 가동중에 있다. 이 대체에너지의 현재 비중을 보면 폐기물이 $93.4{\%}$, 바이오 $3.3{\%}$, 태양열 $2.1{\%}$, 소수력 $0.8{\%}$등으로 나타났다. 현재 정부는 2003년까지 대체에너지 $2{\%}$보급을 목표로 하고 있다. 그러나 대체에너지는 산발적인 기술개발 과제추진으로 인해 특정분야의 전략적 개발 보급에 문제를 드러내는 등 회의적이다. 이와 함께 정부에만 매달려 있는 업계의 자립부족이 큰 문제점으로 지적되고 있다. 이러한 문제를 해결하기 위해선 현재의 개발과 보급의 괴리를 해결할 보완책을 제시하고, 정부는 기술성 경제성 시장성을 동시에 고려하는 체계적인 계획을 세워야 한다.

  • PDF

Economic Benefits of Integration of Supplementary Biopower and Energy Storage Systems in a Solar-Wind Hybrid System (100% 신재생에너지 자원 기반 에너지 공급을 위한 태양광, 풍력 및 바이오 발전의 통합 전략 및 경제성 평가)

  • Hwang, Haejin;Mun, Junyoung;Kim, Jiyong
    • Korean Chemical Engineering Research
    • /
    • v.58 no.3
    • /
    • pp.381-389
    • /
    • 2020
  • This study analyzed the optimal electricity cost of a 100% renewable energy source (RES) based system. Especially energy storage system (EES) and supplementary biopower system as well as photovoltaic (PV) and wind power component were included in the proposed RES-based system to overcome the intermittence of RESs and to efficiently balance energy supply and demand. To comparatively analyze the levelized cost of electricity (LCOE) of different RES-based systems, six scenarios were developed according to the involved RESs: PV, wind, PV/wind, PV/biopower, wind/biopower, and PV/wind/biopower systems. We then applied the proposed systems to build a 100% RES-based system in Jeju Island, Korea. As a result, the single component based system, PV and wind power system of 0.18 and 0.28 $/kWh, respectively, cannot compete with the economics of existing electricity grid. However, the optimal LCOE of the hybrid system where PV and wind power are used as main supply options and biopower as supplementary option was identified to be 0.08 $/kWh, which can compete with the economics of an existing electricity grid.

An Accuracy Estimation of AEP Based on Geographic Characteristics and Atmospheric Variations in Northern East Region of Jeju Island (제주 북동부 지역의 지형과 대기변수에 따른 AEP계산의 정확성에 대한 연구)

  • Ko, Jung-Woo;Lee, Byung-Gul
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.30 no.3
    • /
    • pp.295-303
    • /
    • 2012
  • Clarify wind energy productivity depends on three factors: the wind probability density function(PDF), the turbine's power curve, and the air density. The wind PDF gives the probability that a variable will take on the wind speed value. Wind shear refers to the change in wind speed with height above ground. The wind speed tends to increase with the height above ground. also, Wind PDF refers to the change with height above ground. Wind analysts typically use the Weibull distribution to characterize the breadth of the distribution of wind speeds. The Weibull distribution has the two-parameter: the scale factor c and the shape factor k. We can use a linear least squares algorithm(or Ln-least method) and moment method to fit a Weibull distribution to measured wind speed data which data was located same site and different height. In this study, find that the scale factor is related to the average wind speed than the shape factor. and also different types of terrain are characterized by different the scale factor slop with height above ground. The gross turbine power output (before accounting for losses) was caculated the power curve whose corresponding air density is closest to the air density. and air desity was choose two way. one is the pressure of the International Standard Atmosphere up to an elevation, the other is the measured air pressure and temperature to calculate the air density. and then each power output was compared.

Application of Enhanced Geothermal Systems for Jeju geothermal power plant (EGS 지열발전시스템을 적용한 제주 지열발전소)

  • Lee, Sang-Don
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.573-573
    • /
    • 2009
  • 지열에너지는 지구가 생성될 당시부터 지구 내부에 존재하는 무한한 열에너지로 온실가스 배출이 적으며 태양광이나 풍력 등 다른 신재생 에너지와는 달리 일정한 에너지를 공급할 수 있는 항상성 에너지로 기저부하를 담당할 수 있다. 지열을 이용한 전력 생산은 1904년에 이탈리아 라데렐로에서 처음으로 시작되었으며, 현재까지 화산지대를 중심으로 활발히 이루어지고 있다. 2001년에서 2005년 사이에 전세계 지열발전용량은 약 13% 증가하였으며, 2005년을 기준으로 약 8,933MWe의 지열발전설비가 가동 중이다. 최근 들어 지하 심부까지 시추하여 지열저장소(geothermal reservoir)를 형성하고 이를 통해 지열에너지를 생산하는 새로운 시스템인 EGS(Enhanced Geothermal Systems)가 개발됨에 따라 비화산지대에서도 지열발전소를 건설하려는 움직임이 가속화되고 있다. EGS는 지하 심부의 불투수성 결정질 암반에 존재하는 지열에너지의 경제적인 생산뿐만 아니라 물을 주입하여 생산시키는 순환 방식을 이용하여 지열에너지 획득의 매개 역할을 하는 지열수의 고갈 문제를 해결하였다. 결정질 암반에서의 지열저장소의 형성은 암반 내에 분포하는 불연속면에서 주로 발생하며, 이를 위한 압력 조건은 현지 암반의 응력 분포 특성과 암반 및 불연속면의 물성에 좌우된다. 시추공을 통해 지하 심부의 암반에 수압이 가해지면 물의 주입으로 불연속면의 마찰력이 감소하며, 이로 인해 불연속면에 전단변형이 발생하게 된다. 전단변형은 불연속면을 열린 상태로 유지시켜 지열저장소를 형성하게 된다. 불연속면의 전단 변형시 발생하는 미소 탄성파는 시추공 주변에 설치한 모니터링 장비에서 측정되며, 모니터링 장비에 의해 측정된 미소 탄성파 발생 지점의 클러스터는 지열저장소의 공간적 분포 및 규모를 추정할 수 있는 자료가 된다. 현재 EGS를 이용한 지열발전 프로젝트는 프랑스 슐츠, 스위스 바젤, 호주 하바네로에서 대표적으로 진행 중이다. 슐츠는 현재 1.5MWe의 파일럿 플랜트를 가동 중이며, 하바네로는 파일럿 플랜트 건설 단계를 진행중이다. 스위스 바젤은 지열저장소를 형성시킬 목적으로 수행된 주입시험에서 발생된 문제에 대한 기술의 신뢰성을 확보할 목적으로 잠시 중단된 상태다. 제주도는 신생대에 분출하여 형성된 대표적인 한국의 화산지형으로 지열부존 가능성이 높을 것으로 예상되는 지역이다. 따라서 폐사는 지열에너지 부존 특성을 파악하기 위한 심부 물리 탐사 및 탐사정 시추가 실시될 예정이며 궁극적으로 국내 최초의 상용화된 지열발전소 건설을 목표로 하고 있다.