• Title/Summary/Keyword: 정부침하

Search Result 17, Processing Time 0.028 seconds

A Study on Settlement Prediction of Concrete-faced Rockfill Dam Using Measured Data During Construction and After Impounding (시공 중 및 담수 후 계측데이터를 이용한 CFRD의 침하량 예측 연구)

  • Lee, Chungwon;Kim, Yongseong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.2
    • /
    • pp.5-13
    • /
    • 2015
  • In the present study, the prediction methods of the crest settlement after impounding and the maximum internal settlement during dam construction were proposed through the analysis on settlement data at 38 monitored points of 36 Concrete-Faced Rockfill Dams (CFRDs). The results from this analysis provided that the crest settlement and the maximum internal settlement are increased in proportion to the dam height and the void ratio. However, the relationship between internal settlement and dam height for each void-ratio range plotted in semi-logarithmic scale is the nearly same. Also, the prediction of the crest settlement of the CFRD is possible through the maximum internal settlement during dam construction. In addition, it seems that the valley shape highly affects the dense dam body with high construction modulus. The results of this study will provide the useful tool for the design, construction and management of CFRDs.

Long-term Settlement Prediction of Center-cored Rockfill Dam using Measured Data (계측자료를 이용한 중심코어형 석괴댐의 장기침하량 예측)

  • Lee, Chungwon;Kim, Yongseong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.11
    • /
    • pp.21-27
    • /
    • 2014
  • In this study, the prediction methods for the crest settlement after impounding and the maximum internal settlement during dam construction were proposed through the analysis on settlement data at 46 monitored points of 37 Center-Cored Rockfill Dams (CCRDs). Results from this analysis provided that the crest settlement increases with elapsed time, and from the relationship between the dam height and the maximum internal settlement during dam construction, it is confirmed that the internal settlement was largely evaluated when the coarse-grained material was used as the dam core. This internal settlement increased in proportion to the dam height. In addition, the crest settlement of the CCRD with the core compacted with fine-grained material was relatively large. It is expected that the results of this study would provide the practical tool for the design, construction and management of CCRDs.

Settlement Behavior Prediction of CFRD After Impounding (CFRD의 담수 후 침하 거동 예측)

  • Kim, Yong Seong;Kim, Bum Joo;Shin, Dong Hoon;Park, Han Gyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3C
    • /
    • pp.209-218
    • /
    • 2006
  • In this study, stress and deformation of CFRD during its construction and impounding were analyzed and compared with its monitoring results. Moreover, deformation characteristics of CFRD after impounding were evaluated based on the settlement monitoring records of total 23 domestic and foreign CFRDs during construction and impounding. The investigation on the behavior of CFRD indicated that the influence of impounding on its stability was minimal although slight increases in vertical and horizontal stresses and strains were observed. Also, one method was proposed to predict a crest settlement from multi-layer settlements by applying the best fit method. It is expected that the results of this study would provide practical information for the design, construction, and management of CFRD.

A Study On The Deformation Behavior of Post-Construction Crest Settlement, Face Slab Deformation, and Leakage of Concrete Faced Rockfill Dams (콘크리트 표면차수벽형 석괴댐의 준공 후 정부침하와 슬래브 변형 및 누수 거동에 관한 연구)

  • Kim, You-Seong;Choi, Jae-Seon;Won, Myoung-Soo;Lee, Hee-Hun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.8 no.2
    • /
    • pp.31-39
    • /
    • 2009
  • The purpose of present study performed 27 CFRD cases analyses to predict and effectively use post-construction crest settlement, face slab deformation, and leakage as indexes for the maintenance and management of concrete faced rockfill dams(CFRD). The results showed that the range of post-construction crest settlement suggested by Sherard and Cooke (1987), and Clements (1984) had a good agreement in the case analyses using rockfills with very high intact strength, but it had a trend which underestimated crest settlement in the cases using rockfills with medium to high intact strength. The leakage case analyses showed that leakage is mainly caused by face slab deformation due to the water load, the maximum leakage in general was observed during the first reservoir filling, and leakage was rapidly increasing when the dam height exceeds 125m.

  • PDF

An Analysis iff the Mutural Relation between Sinkhole and 'Permanent under Draingage System' as A Measure of Non Floating (씽크홀(SINKHOLE)과 부력방지 대책인 '영구배수 공법'과의 상관관계)

  • Kwon, Hoi ku
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2017.11a
    • /
    • pp.257-259
    • /
    • 2017
  • 최근에 국내에서 입법된 "지하안전관리에 관한 특별법"의 지하안전영향평가 등에서 지하매설물 및 굴착공사 관리의 중요성을 강조하고 있지만, 아직까지는 지하를 개발함에 있어 지반의 안전과 관련된 사항은 미흡한 실정으로 도심지 지반침하( Sinkhole) 현상이 매년 증가하고 있다. 그리고 지반침하(Sinkhole)는 발생이 될 경우 인명피해는 물론 도로나 주변 건물들에 막대한 피해를 줄 수 있는 소지가 충분한 대상으로 사료됨에도 불구하고 이러한 현상을 건설현장에서 심각하게 받아들이는 분위기는 어느 곳에서도 감지되지 않는다. 다만 정부부처나 공공기관에서 국회차원의 지대한 관심에 부응하여 이에 대해 광범위한 연구와 조사에 막대한 예산을 투입하여 다방면에서 진행되고 있는 것으로 파악되고 있다. 또한 이러한 연구결과의 자료를 근거로 하여 지반침하 사고의 주요 원인을 조사해본 결과 상하수도관 손상과 무리한 인접굴착공사 및 대부분의 대형건축공사 현장에 채택되고 있는 부력방지 대책의 일환인 영구배수공법의 무분별한 적용을 들 수 있었다. 이러한 상황에서 그 중 비용과 난이도를 고려현장에서 용이하게 저감할 수 있는 방법인 영구배수공법을 선정하여 영구배수공법의 이론적 고찰과 공학적 타당성(구조체 부상방지 안전성 검토기준)을 연구하여 무분별한 영구배수공법 적용으로 지반침하(Sinkhole)가 발생하는 것을 막아 인명피해와 도로나 구조물의 안전성을 확보하고 나아가 영구배수공법 적용으로 항구적 발생하는 천문학적인 유지관리비의 절감이 목적이다.

  • PDF

A Study on Crest Settlement Characteristics of Rockfill Dam (락필댐의 정부침하 거동특성 연구)

  • Park, Han-Gue;Park, Dong-Soon;Kim, Yong-Seong;Lee, Jong-Wook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1219-1226
    • /
    • 2005
  • In this study, crest settlement characteristics of CFRD (Concrete Faced Rockfill Dam) and ECRD (Earth Cored Rockfill Dam) were analysed through the instrumentation data from representative 7 large dams in Korea. Also, We have studied the effect of valley shape and uniaxial compressive strength of intact rock to better understand the impact of the parent rock strength and the valley shape on the long term crest settlement of CFRDs. From the results, we found that the valley shape and strength of intact rock on crest settlement of dams are an important parameters. As a result, we obtained that the maximum crest settlement of CFRD is larger than that of ECRD and long term crest settlement rate per dam height of rockfill dams is less than 0.60% during service period.

  • PDF

A Study on Establishing the Under Space Integrated Map for Safety Management of Harbor Structures (항만구조물 안전관리를 위한 지하공간통합지도 구축 방안 연구)

  • Park, Dong-Hyun;Jang, Yong-Gu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2016.05a
    • /
    • pp.139-140
    • /
    • 2016
  • 최근 대도심지를 중심으로 빈번히 발생하고 있는 지반침하, 지반함몰, 도로붕괴 등의 지하안전사고로 인해 정부는 지하안전 대책 수립에 만전을 기하고 있다. 특히, 국토교통부는 지하공간통합지도 구축 기본계획을 수립하고 본사업에 박차를 가하여 지하공간 안전관리체계를 마련하고자 하고 있다. 그러나 국토교통부에서 구축계획하고 있는 지하공간통합지도는 서울, 부산, 대전 등 대도시를 중심으로하고 있어, 태풍, 집중호우 등에 의한 지반침하 및 함몰 등의 안전사고가 우려되는 항만구조물을 관리하기에는 어려운 실정이다. 이에 본 연구에서는 항만구조물의 안전관리를 위한 지하공간통합지도 구축 방안을 제시하였다.

  • PDF

Research and Development Trends for Mine Subsidence Prevention Technology in Korea (한국의 광산 지반침하방지기술 연구개발 동향)

  • Kim, Soo Lo;Park, Joo Hyun
    • Tunnel and Underground Space
    • /
    • v.25 no.5
    • /
    • pp.408-416
    • /
    • 2015
  • The collapse of the underground cavities and voids, which were made for developing mineral resources, can cause the subsidence of the ground surface in the residential areas. During the Japanese colonial era and the 1960's mining boom period, lots of mines had been developed indiscriminately in Korea. Due to complicated geological conditions and mining methods, many of dangerous underground mine cavities with steep slopes had been generated at the shallow surface. Due to such conditions, it is difficult to directly apply valid foreign reclamation practice for the cavities in Korea environments. It is necessary to develop the efficient ground stabilization technologies for the Korea underground mine conditions to solve abandoned mine reclamation properly. Therefore, MIRECO and Korea government have been carrying out practical researches and technical developments together with other academic researchers and reclamation business partners, and various practical solutions such as surveying and exploration methods, proper cavity filling materials and reinforcement methods have been developed with application in the mine field. In this article, up to date technologies and R&D trends in the field of mine subsidence prevention technology are broadly reviewed to establish the future direction of a research and development.

Prediction of Crest Settlement of Center Cored Rockfill Dam using an Artificial Neural Network Model (인공신경망기법을 이용한 중심차수벽형 석괴댐의 정부침하량 예측)

  • Kim, Yong-Seong;Kim, Bum-Joo;Oh, Sang-Eun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.4
    • /
    • pp.73-81
    • /
    • 2012
  • In this study, the settlement data of 32 center cored rockfill dams (total 39 monitored data) were collected and analyzed to develop the method to predict the crest settlement of a CCRD after impounding by using the internal settlement data occurred during construction. An artificial neural network (ANN) modeling was used in developing the method, which was considered to be a more reliable approach since in the ANN model dam height, core width, and core type were all considered as input variables in deriving the crest settlement, whereas in conventional methods, such as Clements's method, only dam height is used as a variable. The ANN analysis results showed a good agreement with the measured data, compared to those by the conventional methods using regression analysis. In addition, a simple procedure to use the ANN model for engineers in practice was provided by proposing the equations used for given input values.

Crest Settlement Prediction of Concrete Faced Rock-Fill Dam After Initial Impounding (CFRD의 담수 후 정부침하량 예측)

  • Kim, Yong-Seong;Park, Han-Gyu;Lim, Heui-Dae
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.349-354
    • /
    • 2005
  • In this study, settlement characteristics of 23 CFRD was investigated from monitoring data and the method to estimate the crest settlements considering internal settlement during constructions was proposed. Moreover, crest settlement smaller than 20cm and deflection of face slab smaller than 20cm are not considered to be critical to the stability of large dam whose height is over 40m. Therefore, we assigned the region as safe zone that can be used as a guideline of maintenance of dam. These estimated data can be used in the design, construction and long-term maintenance in domestic CFRD hereafter.

  • PDF