• Title/Summary/Keyword: 정량적 리스트 평가

Search Result 31, Processing Time 0.027 seconds

Similarity Criteria in GUI and Icon Design - with an Emphasis on the Quantitative Evaluation using Checklists - (화상디자인의 유사성 판단기준에 대한 연구 - 체크리스트를 활용한 정량적인 평가 방법을 중심으로-)

  • 김소영;최민영;임창영
    • Archives of design research
    • /
    • v.16 no.4
    • /
    • pp.101-110
    • /
    • 2003
  • This paper is focused on the similarity of GUI design and proposes checklists for evaluating similarity of GUI design in quantitative way and more important factors in this checklists. On the first, consideration of similarity and analysis of GUI properties are made, and from these results, the categories that affect the evaluation of similarity are extracted. The categories are consisted of 5 factors, which are concept, shape, color, relation, and multimedia. The checklists from above 5 categories are tested in 3-stage, and in this paper, 11 checklists from shape, color, and relation factor of the second stage are verified by online survey. The purpose of this survey is to find out the difference between user groups(designer, computer related, etc) and more important factors in the checklists that affect the total results of similarity. In the results of survey, the checklists have no relation with the user groups and among the checklists, external shape, composition element, and design methods have impact factors on the evaluation of similarity.

  • PDF

Design of an Evaluation Tool for SCM Process (소프트웨어 형상관리 프로세스 평가 도구 설계)

  • 이영식;장치원;황선명
    • Proceedings of the Korea Multimedia Society Conference
    • /
    • 2003.11b
    • /
    • pp.723-726
    • /
    • 2003
  • 소프트웨어 프로세스를 개선하여 소프트웨어의 품질 및 생산성을 높이고 조직의 업무를 효과 적으로 달성할 수 있는 체계적인 프로세스를 수립하고 지속적으로 프로세스를 개선함으로서 프로세스의 수행능력을 향상시키기 위한 접근 방법이 많이 시도되고 있다. 본 논문에서는 소프트웨어 프로세스 개선을 위한 형상관리 활동을 관련 표준에 바탕을 두어 정량적인 평가를 할 수 있는 체크리스트를 작성하였고, 체크리스트를 이용한 형상관리 프로세스 평가 도구를 설계하였다.

  • PDF

Development of Engineering Checklist Model for Case-based Evaluation of Plant EPC Project (플랜트사업 설계사례의 체크리스트기반 평가모델에 관한 연구)

  • Lee, Sang-Youb;Son, Jae-Ho;You, Young-Hun;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.146-152
    • /
    • 2008
  • Since the year of mid 2000, the EPC industry in Korea has the highest amount of orders received due to tremendous need form middle east asia region. However, the quality requirement from the owner is getting critical, which lead to the more competitive engineering capacity equipped. In order to do so, the development of objective and quantitative evaluation model of engineering process is essential. In order to develop the engineering checklist model for case-based evaluation of EPC project, first, the general description of worldwide EPC industry as well as the literature review of prior study have been performed. Then, the survey interview with experts in the engineering area of EPC project was performed In order to Identify the engineering work tasks and the critical check items, which should be checked during engineering process. Based on these checklist, the weights of check items as well as engineering work tasks also have been defined. The developed checklist model evaluated the two EPC project cases of S company in Thailand in order to explore its applicability. From the analysis of evaluation results, it is expected that the continuous implementation of evaluation based on checklist model can help the EPC practitioner check the critical items in engineering process more efficiently and take an appropriate action for better engineering performance, which finally can lead to the Korea EPC industry being more competitive.

Method of Qualitative Hazard Assessment of Forest Fire for the Major Temple in Domestic Using by Checklist (체크리스트 기법을 이용한 국내 주요사찰의 정성적 산불위험성 평가 방법)

  • Kim, Dong-Hyun;Lee, Ji-Hee;Yi, Myung-Sun;Kim, Kwang-Il
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2011.04a
    • /
    • pp.432-435
    • /
    • 2011
  • 산불로 인한 피해는 비단 산림뿐만 아니라 산림인접지 가옥, 사찰과 같은 건축물에서도 발생된다. 특히, 사찰은 국보뿐만 아니라 다양한 문화재를 보유하고 있어 산불로 인해 소실될 경우 문화 자산의 피해가 불가피하다. 이에 국보보유사찰, 문화재 다량보유사찰, 조계종 교구 본사, 세계문화재 등재 사찰 등을 포함한 우리나라 주요사찰 42개소에 대해 미국 Firewise 및 캐나다의 Firesmart에서 제시한 산림인접지 시설물의 위험성 평가 방법을 기반으로 체크리스트 기법을 이용하여 '사찰 산불 위험성 평가'를 실시하였다. 체크리스트 주요 항목은 크게 입지 여건, 임상 및 산림과 사찰의 이격거리, 산불발생 개연성, 사찰 주변 가연물 화재위험성, 적정소방시설 여부, 기타 화재방지를 위한 시설물 평가 등 총 6개 항목으로 구분하여 26개 세부항목을 작성, 평가하였다. 정성적 위험성 평가 결과, 산불로 인한 화재 위험성이 높은 사찰과 산불피해 저감 대책을 제시하였고 향후, 정량적 위험성 평가를 통한 위험관리 모델 제시에 관한 연구를 수행하고자 한다.

  • PDF

Occupational Health and Safety Risk Assessment Checklist for Preventing Accidents During Building Design Phase (재해예방을 위한 건축공사 설계단계 안전 위험성 평가 체크리스트)

  • Han, Byoung-Soo;Park, Chan-Sik;Hong, Sung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.68-74
    • /
    • 2007
  • It has been recognized that safety management is activated during the construction phase to prevent accidents and fatalities of workers. However, It is revealed that about 15% of fatal death accidents is caused by the lack of management of planning and design phases. There is a crucial need of assessing safety risk during building design phase. This paper is aimed to develop a safety risk assessment checklist that can be used during building design phase, utilizing the concept of Design for Safety. In doing so, a broad literature survey on safety management of building Process, various safety risk assessment toolboxes being utilized in the HSE and the BAA of UK. The proposed checklist contains the followings: 1) classification structure for safety design on space, element, and trade work 2) hazard risk factor, probability and degree of intensity of accident occurrence, and 3) safety assessment criteria. It is expected that the checklist would be an effective tool of preventing and minimizing fatal accidents of building construction projects.

Improvement for Technology Readiness Assessment with Weighting Method for Defense Acquisition Project (가중치 산출방법을 활용한 획득방안 분석단계의 기술성숙도평가 개선방안)

  • Kim, Mi-Seon;Noh, Eun-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.538-544
    • /
    • 2021
  • Technology readiness assessment is a procedure for managing defense project risk factors based on the preemptive identification of technical risks. Under current regulations, technology readiness is determined based on considerations of the ratings of factors itemized on a checklist, whether unsatisfied factors have a fatal impact on the project, and whether countermeasures for unsatisfied factors have been established. However, objective criteria for assessing the impact of unsatisfied factors have not been presented, and thus, at present, the results of technology readiness level determinations are largely subjective. In addition, the importance of questions on the checklist is dependent on individual project characteristics and this is not considered during the assessment process. In this paper, we propose an improved technology readiness assessment procedure that considers the characteristics of each project. Using the proposed procedure, we quantitatively determined the importance of each checklist item using a weighting method. We found the devised procedure improved the reliability and objectivity of technology readiness assessment results. A case analysis of a complex weapons system is presented to demonstrate these improvements.

가스설비의 정량적 안전성 평가

  • 김유탁;이광원;백재진;오신규;한정민;김원국
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2000.06a
    • /
    • pp.254-259
    • /
    • 2000
  • 현재 막대한 기초투자비와 대규모의 고가장비들로 이루어진 가스시설물 및 관련 산업분야는 풍부한 경험과 깊이 있는 공학적 지식을 바탕으로 코드, 가이드라인, 체크리스트, 표준규격 등의 관리체계를 통해 사업장내에서 상당한 수준의 안전을 보증하고 있다. 하지만 여전히 관련된 사고의 개연성은 상존하고 있으며 인명 및 재산피해를 수반한 사고도 지속적으로 발생하고 있다. (중략)

  • PDF

한국에서의 건강영향평가 도입방안

  • Han, Sang-Uk;Kim, Im-Sun;Han, Yeong-Han
    • Environmental engineer
    • /
    • v.24 s.256
    • /
    • pp.23-25
    • /
    • 2007
  • 건강영향의 중요성에 대한 인식이 증가함에 따라, 본 연구는 건강영향평가의 최적 도입방안을 연구하는데 목적을 둔다. 한국의 지난 30년 동안 환경영향평가(EIA)를 수행하고 있다. EIA내의 스크리닝, 스코핑, 분석, 영향평가, 협의, 보고서 검토, 의사결정 및 모니터링 과정들은 HIA의 필수적인 부분이 될 것이다. 스크리닝 및 스코핑 과정은 아직 EIA내에 포함되어 있지는 않지만, 기존 EIA 과정내로 HIA를 통합하는 것은 한국에서 매우 효율적인 방안이 될 수 있다. 나아가, EIA내의 기존 공중-위생 항목을 보건 영향을 고려하기 위해 충분한 결정인지를 지닌 환경-보건항목으로 교체 및 확장하는 것이 바람직할 것이다. 한국의 경우, HIA의 초기 시행을 고려할 때 사회과학 및 심리학에 기초한 전향적 및 정량적 접근법이 보다 적합할 것이다. 본 연구에서는, 체크리스트와 툴키트가 개발되었으며, HLA의 적용 및 보급에 있어 매우 유효한 지침이 될 수 있을 것이다.

  • PDF

A Study on the Reliability Quality Testing Model of Game Software (게임 소프트웨어의 신뢰성 품질 평가 모델에 대한 연구)

  • Jung Hye-Jung
    • Journal of Internet Computing and Services
    • /
    • v.6 no.4
    • /
    • pp.37-46
    • /
    • 2005
  • Computer are being used in an increasingly wide variety of application areas, and their correct operation is often critical for business success and humasn safety. Developing high quality software products is therefore of prime important. The recent game software become popular, so we are interest in the game software testing. According to the kinds of game software, because it has the different characters, so game software testing is very difficult. According to enviroment change, Recently, online game is popular, so online game trade in the world market. In the company, developers try to develop the reliable game software. But we can experience many fault of game software in spite of the beta testing. Especially, Testing is very difficult on the game software because of various environment and functionality. We tried the survey for game user. In this paper, we study the quality testing metric of game software fault basis on the ISO/IEC 9126. Also, we consist of the check list of game software a point of view user. It apply for the reliability testing metrics of ISO/IEC 9126.

  • PDF

A Study on Competency Evaluation Checklist of Design Phase VE Team (설계VE팀의 역량평가 체크리스트에 관한 연구)

  • Seo, Ha-Na;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.154-162
    • /
    • 2008
  • Ministry of construction and transportation has been enforcing extensionally design phase VE(Value Engineering) to the construction costing more than 10 billion won, an importance of design phase VE accordingly is raising to get rid of a waste of cost and noneffective factors previously in construction projects. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, present competency factors of design phase VE to highly raise the output through organizing an effective team at the beginning stage of design phase VE. Find out 29 competency factors through characteristics of design VE team for the check list, classify by team knowledge, team work skill, and team attitude. Get an efficiency regarding importance and find out Competency Evaluation items of design VE team, present a Competency Evaluation plan for indicating an objective standard to Competency Evaluation by measuring relative importance as to each Competency Evaluation item.