On-line partial discharge measurement techniques of hydro-generator windings (수력 발전기 권선에서의 운전중 부분방전 측정기법)

  • 황동하;김진봉;김용주;박명수;김택수
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.45 no.2
    • /
    • pp.294-300
    • /
    • 1996
  • In hydro-generator, a groundwall insulation of stator windings gradually deteriorates due to mechanical, thermal, electrical and environmental stresses. These stresses combine to result in loose windings, delamination of the stator insulation and/or electrical tracking of the endwinding, all of which can lead to stator insulation failures. Conventionally, off-line tests such as partial discharge measurement, DC/AC current and .DELTA.tan.delta. tests has been used for estimation of winding condition. However, off-line test requires large power supply and generator outage. In addition, major cause of insulation problems such as loose wedges and slot dischages may not be found with off-line diagnoses. This paper introduces the on-line partial discharge measurement techniques using frequency spectrum analyzer(FSA) for the generator stator windings. The experimental results from the UIAM #1 hydro-generator confirms a optimistic application of on-line generator diagnosis method as a reliable tool for evaluation of winding condition.

  • PDF

Development of 10MW grade Intelligent Digital Governor and It's Application on Sumjingang Hydro-Power Plant (10MW급 인텔리전트 디지털 가버너 국산화 개발 및 섬진강 수력 발전소 적용에 관한 연구)

  • Jeon, Il-Young;Cho, Sung-Hun;Kim, Yoon-Sik;Chun, Si-Young;Shin, Nam-Sik;Park, Young-Chul
    • Proceedings of the KIEE Conference
    • /
    • 2001.07d
    • /
    • pp.2153-2155
    • /
    • 2001
  • This thesis presents a development of intelligent digital governing system and it's application on Sumjingang Hydro-Power plant. The developed system consists of hardware, software and governing algorithm. The feature of hardware is triplex-modular fail safe redundant system for a safe turbine running. The software consists of operating system and application program. The operating system has real-time and multi-tasking features. And also, application algorithm is composed to run francis type hydro-turbine. The developed digital governing system is applied to Sumjingang hydro-power plant, Korea Hydro Nuclear Power Corporation.

  • PDF

Analysis of Economic Life Cycle for Hydro-Generator Based on Annual Equivalent Cost Method (연간등가비용법을 이용한 수력발전기의 경제적 수명주기 분석)

  • Lee, Sung-Hun;Chang, Jeong-Ho;Kim, Jin-O;Lee, Heung-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.1993-1999
    • /
    • 2011
  • Today, the power utilities is setting on the slow load growth and the aging of power equipment, and then could spend the efforts on the stability of system performance. Asset management may be defined as the process of maximizing corporate profit by maximizing performance and minimizing cost over the entire life cycle of power equipment. Therefore, asset management is great way to fulfill the economic investment and the stability of system performance. This paper presents the application of effective asset managem ent from an economic perspective. A proposed method is considering the life cycle analysis using life cycle cost methodology for hydro-generator during the total life cycle. The life cycle cost methodology include a way to calculating maintenance and operating costs. The proposed method will be expected to play an important role in investment decision making considering economic evaluation.

Assessment of Insulation Condition between Diagnosis and Impregnation for Hydro-Generator (수력발전기의 절연보강 전${\cdot}$후 절연상태 비교평가)

  • Byun il-hwan;Lee Eun-Woong
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.1124-1126
    • /
    • 2004
  • The measurements were performed to assess the insulation deterioration condition of the stator winding of Dae-Cheong hydro-generator ${\sharp}2$ which had been in service after being constructed 1980. After repair of the stator winding insulation. we conducted insulation diagnostic tests which include resistance, polarization index(P. I). AC current, dissipation factor($Tan{\delta}$) and partial discharges ($Q_{max}$). The results of diagnostic tests were compared to the previous records. On the basis of these test results. this paper tried to present the importance of insulation repair for the generator stator winding.

  • PDF

Partial Discharge Property of Hydrogenerator Stator Windings (수력발전기 고정자 권선에서 부분방전 특성)

  • Kim, Hee-Dong
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2000.05a
    • /
    • pp.86-90
    • /
    • 2000
  • Partial discharge(PD) tests were performed when the hydrogenerator(rated 11kV and 25MVA) was shut down(off-line). Six cable couplers were installed in the ring bus as well as within hydrogenerator terminal box. PD tests were conducted using partial discharge analyzer(PDA) and digital partial discharge detector(PDD). PDA showed that the normalized quantity number(NQN) and the partial discharge magnitude increased with increase of ac voltage. Slot discharges were discovered in three phases(A, B and C) at the rated voltage. PDA and PDD test results are in accordance with the pattern and magnitude of partial discharge. This hydrogenerator stator windings were in good condition.

  • PDF

A study on the Analysis of Insulation Aging for Generator stator windings (수력발전기 고정자권선의 절연열화 분석)

  • Byun, D.G.;Oh, B.K.;Kang, D.S.;Lim, K.J.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07c
    • /
    • pp.2072-2074
    • /
    • 2005
  • This test was performed to assess the insulation condition of the stator winding of 3.45kV hydro generator in insulation deterioration condition which was due to long service period(30years) since installed We extracted 12 stator wingdings from the hydro generator core, cut the stator windings into three parts(Middle winding part, slot winding part, end wingding part), and evaluated the insulation condition to know the deterioration condition of each parts. This insulation diagnostic tests include AC current, dissipation factor, and partial discharg test.

  • PDF

Development of the On-line Partial Discharge Measuring Sensor and System on Stator Windings for Hydro Generator (수력발전기 고정자권선용 운전중 부분방전 측정 센서 및 시스템 개발)

  • Kang, D.S.;Sun, J.H;Hwang, D.H.;Yun, Y.H.;Seo, I.S.;Shin, B.C.;Klm, H.I.;Lee, K.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11c
    • /
    • pp.103-106
    • /
    • 2005
  • A lot of R&D on the diagnosis of stator winding insolation for large rotating machines has been carried out since the 1970s. The on-line partial discharge measurement has proved to be an effective technique in the evaluation of the state of stator insulation in high voltage rotating machines. The purpose of this paper is to describe the method of the on-line partial discharge measurement on stator windings for hydro- generator with ceramic sensor and measuring system. We developed ceramic coupling sensor, partial discharge measuring system, terminal box and index parameters.

  • PDF

Frequency Control of Hydro Power Plant Based on Automatic Tuning Controller (자동 동조 퍼지 제어기를 이용한 수력발전소 주파수 제어)

  • Lee, Seon-Geun;Lee, Won-Yong;Shin, Dong-Ryul;Kwon, Oh-Seok
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.251-253
    • /
    • 1993
  • This paper proposes an automatic tuning fuzzy controller for frequency control of a hydro power plant (HPP). The proposed automatic tuning fuzzy controller consists of fuzzy control part and scaling factor calculation part. Scaling factor tuning is based on the concept of conventional tuning rules for the PI controller. The proposed controller was evaluated by simulation. Good results have been obtained for the 5kW model HHP.

  • PDF

A Design of Filler Compensated PID Controller via Transfer Function Synthesis (전달함수 합성법에 의한 필터 보상형 PID 제어기 설계)

  • Kim, Jong-Gun;Kim, Ju-Sik;Kim, Hong-Kyu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.9
    • /
    • pp.88-93
    • /
    • 2008
  • This paper proposes a frequency transfer function synthesis of a later compensated PID controller for an approximated low order model. The proposed method identifies the parameter vector of PID controller from a linear system that is formed by rearranging a loop frequency transfer function synthesis including the filter compensated PID controller obtained from the given frequency response bounds. And an example for the turbine speed control system of Chungju hydropower plant is given to illustrate the feasibilities of suggested schemes.

Short-Term Hydro Scheduling for Hydrothermal Coordination Using Genetic Algorithm (유전 알고리즘에 의한 수화력 협조를 위한 단기 수력 스케줄링)

  • Lee, Yong-Han;Park, June-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1998.11a
    • /
    • pp.289-291
    • /
    • 1998
  • This paper presents short-term hydro scheduling method for hydrothermal coordination by genetic algorithm. Hydro scheduling problem has many constraints with fixed final reservoir volume. In this paper, the difficult water balance constraints caused by hydraulic coupling satisfied throughout dynamic decoding method. Adaptive penalizing method was also proposed to handle the infeasible solutions that violate various constraints. The effectiveness of proposed method in this paper was examined through the case studies. Further studies for the validation of the hydro scheduling scheme obtained by genetic algorithm will be very appreciated.