• 제목/요약/키워드: 적층식 모듈러

검색결과 4건 처리시간 0.02초

적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안 (Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

시공단계 구조해석을 통한 적층형 모듈러주택의 시공조건 검토 (A Study on Construction Condition of Modular System by Structural Analysis of Construction Stage)

  • 조민주;김종성;유성용;최기봉
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제19권2호
    • /
    • pp.143-150
    • /
    • 2015
  • 현재 국내 모듈러 구조물은 저층의 단독주택 및 군 병영생활관에 한정되어 있는 실정이며, 적층식 모듈러 구조물에 대한 표준화된 구조설계 방법이 없으므로 구조물의 시공과정에서 모듈의 양중이나 운송 시 발생되는 관성력, 양중 시 구조물에 대한 풍하중의 영향, 모듈의 적층 설치 시 충격력 등에 대한 검토가 일반적으로 이루어지고 있지 않다. 따라서 본 연구에서는 대상 모듈러 시스템에 대한 단계별 시공방법을 살펴보고, 각 시공단계에 대한 구조해석 시 경계조건 및 하중 작용위치를 결정하였다. 또한 모듈의 양중 및 차량운반 시 각각의 속도에 따른 관성력을 산정하였으며 모듈의 적층설치 작업 시 양중속도에 따른 충격하중과 양중에 의한 설치작업 시 순간풍속에 의한 풍하중을 산정하였다. 제안된 방법을 토대로 대상 모듈러 시스템에서 양중 시와 운송 시, 설치 시 등 시공단계별 하중크기 결정조건을 변화시켜 구조검토를 수행하였으며 구조적으로 안전성이 확보되는 시공조건을 도출하였다.

적층식 모듈러 공동주택 현장설치 단계의 생산성 분석 (Productivity Analysis of the Site Installation Stage of Laminated Modular Multi-Family Housing)

  • 박문선;김석
    • 한국산업융합학회 논문집
    • /
    • 제22권5호
    • /
    • pp.519-527
    • /
    • 2019
  • This study was conducted to present useful information on the utilization and productivity analysis of laminated modular multi-family housing. To this end, the process of site installation was investigated and analyzed through a prior study, and the monitoring survey was conducted through the site installation case of an stacked multi-family housing. Based on the above, the results of productivity analysis using the web-cyclone technique were also presented. However, the site installation process has limitations on generalisation because the process is not the same for each construction company, and also limits that require verification through application in the actual site of the web-cyclone model presented in this study.

적층식 모듈러 공동주택 공장제작 단계의 생산성 분석 (Productivity Analysis of the Prefabrication Stage for Layered Modular Housing Units )

  • 김석;박수열;박문선
    • 한국산업융합학회 논문집
    • /
    • 제27권2_2호
    • /
    • pp.403-414
    • /
    • 2024
  • The aim of this study is to evaluate the productivity of multilayered modular housing units during the prefabrication phase. Additionally, it shows the results of productivity analysis conducted using the Web Cyclone technique. Initially, an review of literature and prior studies helped outline the comprehensive manufacturing process of laminated modular apartments, examining the range of minimum, average, and maximum work durations along with workforce size. Subsequently, the productivity of the multilayered apartments' prefabrication was assessed using the Web Cyclone technique, focusing on the workflow, duration, and personnel involved. This analysis also included a comparison of productivity against the initial plan based on the outcomes of a sensitivity analysis.