• Title/Summary/Keyword: 장대터널 건설

Search Result 46, Processing Time 0.022 seconds

The Simulator Study on Driving Safety while Driving through the Longitudinal Tunnel (차량시뮬레이터를 이용한 장대터널 주행안전성 연구)

  • Ryu, Jun-Beom;Sihn, Yong-Kyun;Park, Sung-Jin;Han, Ju-Hyun
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.149-156
    • /
    • 2011
  • Considerable evaluation is needed to design a new longitudinal tunnel in advance because it damaged drivers' driving safety and heightened the possibility of traffic accidents with its physical characteristics. Specifically, considering traffic psychological and ergonomic factors was very important to prevent the difficulty of maintaining safe speed, the increase of the drowsy driving, the fatality of traffic accidents, and subjective feelings such as anxiety while driving a car through the tunnel, from design to construction. This study dealt with driving safety evaluation of an original road alignment design for the longitudinal tunnel (length: above 10km) with a driving simulator, and helped us to improve an original road alignment design and make an alternative road alignment design with presenting risky districts. The results of experiment showed that inflection points were revealed more risky districts, because they impaired driving safety and elevated driver workload while driving a car through around the inflection points of two-way route. Finally, the limitations and implications of this study were discussed.

A Fundamental Study on the Natural Ventilation in Local Vehicle Tunnels (국내 도로터널내 자연환기력 기초 연구)

  • 이창우;김효규;강재근;윤철욱
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1999.03a
    • /
    • pp.55-58
    • /
    • 1999
  • 현재 정부는 사회간접자본 확충을 통한 물류비용의 절감이라는 궁극적 목표를 위하여 도로터널의 확충 노력을 적극 경주하고 있으며 터널의 규모 또한 급격히 장대화 하고 있다. 또한 환경 및 안전 측면에서의 규제 강화로 인하여 터널환기 시스템이 점점 복잡해져 가고 있는 추세이다. 환기관련 주요 설비는 제트팬, 축류팬, 집진기, 수갱 등으로 대형화 및 자동화에 따라 운영비용 역시 급격히 증가하고 있으며 운영비용 중의 대부분은 현재 일반전기로 분류되어 있는 환기설비에 소요되는 전력비로, 장대터널의 경우 km 당 1 MW를 훨씬 초과하는 경우도 많아 SOC(사회간접자본)사업으로 추진되는 도로터널의 건설 및 운영상의 문제점으로 지적되고 있다. (중략)

  • PDF

Worldwide Trends in the Research Topics for the Vehicle Tunnel Ventilation (도로터널 환기관련 연구동향)

  • 이창우
    • Tunnel and Underground Space
    • /
    • v.12 no.3
    • /
    • pp.152-157
    • /
    • 2002
  • Optimal design of the long tunnels with large cross sections essential for the effective development of the limited land in Korea becomes more and more difficult owing to the constantly changing social, economic, environmental and technological factors. Deficiency of the domestic research works till now on the elementary topics on tunnel ventilation retards progress on developing the key technologies urgently required for designing and managing the long and large tunnels. This paper aims at identifying the subjects on which research must be carried out for the construction and management of vehicle tunnels in Korea by means of scrutinizing the contents of the publications since 1991 at the International Symposium on Aerodynamic and Ventilation of Vehicle Tunnels, the only international conference on the tunnel ventilation.

기술현황분석 : 고속 터널굴착과 터널보링머신 동향

  • Jang, Su-Ho;Lee, Yong-Beom
    • 기계와재료
    • /
    • v.21 no.4
    • /
    • pp.96-105
    • /
    • 2010
  • 도로 및 철도는 차량의 고속화와 신속한 물류의 유통을 위해 직선 및 수평화가 절실하게 요구되며, 국내 건설구간의 약 50~70%가 산악지형으로서 터널공사가 필수적으로 요구된다. 국내터널굴착은 주로 발파에 의한 NATM(New Austrian Tunneling Method)으로 공사가 이루어지고 있으나, 굴착효율이 낮으며 안전사고의 위험성이 높다. 해외에서는 급속한 시공을 위하여 TBM(Tunnel Boring Machine)의 적용 사례가 증가하고 있다. 그러나 국내에는 TBM에 대한 연구가 전무한 상태이고, TBM 터널의 설계 시공 기술과 경험이 미흡하다. 최근 대도시의 지하터널과 장대터널의 수요가 증대되어 TBM터널시공 기술과 TBM장비의 국산화가 절실하게 요구되고 있다. 본고에서는 국내외 주요 TBM 시공현황과 전망을 정리하여 TBM 터널 기술의 확보가 매우 시급함을 상기시키고자 하였다.

  • PDF

차량터널 오염물질 농도 예측 시뮬레이션 모델 연구

  • 이창우;양원철;이송희
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1996.03a
    • /
    • pp.107-118
    • /
    • 1996
  • 최근 급격히 장대화 하고 있는 차량 터널의 효율적 건설 및 운영을 위하여 관련 기본 요소 기술 중 특히 국내 기술 수준이 낙후한 분야 중의 하나인 환기 시스템 설계 기술에 대한 관심이 높아지고 있다. 외국의 경우에 비하여 상대적으로 늦긴 했으나 1990년 환경처가 지하 공간 환경 기준 권고치를 설정 발표함으로써 보사부의 공중 위생법, 건설부의 도로법, 노동부 고시 등에 의한 관리 대상이던 터널 내 오염 물질도 직접적인 규제 대상이 되었다. (중략)

  • PDF

A Study on Effectiveness for Car-Crash Fires Prevention through a Full-length Speed Enforcement System in Highway Tunnels (고속도로 터널내 차량추돌화재사고를 방지하기 위한 구간과속단속시스템 설치에 관한 통계적 연구)

  • Lee, Young-Jae;Kim, Gab-Cheol;Park, Hyung-Joo
    • Fire Science and Engineering
    • /
    • v.25 no.5
    • /
    • pp.119-127
    • /
    • 2011
  • Because of most notably the increase in vehicular traffic in Korea, as measured by highway transport usage, relief is being sought by expanding the construction of highways after 1970s'. These highways have opened up over 70 % of the mountainous areas in Korea's country side which includes the construction of tunnels. Currently there are 607 tunnels installed that are being maintained and by 2015, under the next medium-term plan, Korea will build an additional 440 tunnels. In addition, the use of 1,000m double-pole tunnels is expected to increase significantly in 256 locations. There is no doubt that these tunnels will relieve traffic congestion and aid improved communications, but halfclosed underground highway tunnels in particular are required to reduce tunnel fires caused by poor vehicle maintenance, and other factors such as speeding motorists that increase the number of vehicular accidents. Double-pole tunnels in 1,000m length over require vehicle drivers to be more cautious in terms of the continuous speed limit, judged by how devastating most of car-crash fires within these tunnels can be. In order to prevent these disasters, a full-length tunnel speed enforcement system should be considered mandatorily in legal clauses.

The Study on Optimum Ventilation System during Long Tunnel Construction (굴착중인 장대터널 내 최적의 환기시스템에 관한 연구)

  • Lim, Han-Uk;Oh, Byung-Hwa
    • Journal of Industrial Technology
    • /
    • v.26 no.A
    • /
    • pp.3-15
    • /
    • 2006
  • To determine the optimum ventilation systems during long tunnel excavation, the velocity vector profile and the contaminant's distribution at working place are studied using 2-D, 3-D numerical analysis. The main results can be summarized as follow; In case of long tunnels, blower-exhaust-mixture types which enable to use soft blast ducts is most appropriate in terms of ventilation and economical efficiency. Of the same ventilation types, ventilation efficiency has a difference according to blast ducts and the distance between fan and working place. The 3-D numerical result shows that arranging blower and exhaust ducts in the right and left corners of the tunnel respectively is effective to discharge contaminant. The result of the real measurement shows that CO concentration can be reduced to below 50 ppm, which is regulation value, as 16-minutes fan operation goes on.

  • PDF

A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.