Korean Journal of Construction Engineering and Management
/
v.21
no.4
/
pp.21-29
/
2020
This study analyzed problems of operating performance bond for public works and derived some suggestions for improvement. The Contract Law for Government Owner requires to submit performance bond which guarantees performing the construction contractor pays back compensation money when the obligation is not executed. Currently, first bid eligibility for participation is exactly required for executing company of performance bond obligation, not considering volume, technical level, and special type of remaining works. In collaboration contract, if guarantee accident occurs, it is obliged for remaining collaboration contractors to be qualified to fulfill the whole contract. This study proposes following improvement plan to solve problems of current performance bone in public works. Firstly, qualification criteria must be deregulated exceptionally for selecting proper contractor, which executing performance bond obligation, considering progress and characteristics of remaining works. Secondly, In collaboration contract, the prerequisite of remaining contractors' should be deregulated as 'implementation requirement of the remaining works'from'implementation requirement of the whole work'. Finally, defect responsibility should be included in liabilities of performance bond by specifying that owner or guarantee agency bear them.
현장에서는 주공정과 예산관리를 중심으로 공사진행을 하고, 공정이 90% 이상 달성되었거나 또는 잔여공기가 9개윌 정도 남아 있으면 모든 공정을 재검토하기 바란다. 우선 하청시로부터 잔여 공사에 대한 공정표를 받아, 잔여공시 1개월 전에 준공될 수 있는지 검토한다. 9개월 정도 앞서 준공기일을 검토하는 것은, 자재납기가 장기간(7개월 정도) 소요되는(플랜트 Control Panel 등) 자재의 발주여부를 검토하고, 잔여공기 내에 정상 작업으로 공기 내 준공이 불가하다고 예측될 경우, 3개월 또는 6개월 돌관작업 계획을 세우기 위함이다. 잔여공기가 3개월 정도 남아 있을 때, 시설물을 인계(Hand Over) 하기 위해 본격적인 준비를 한다. 준공이란 "계약적으로 발주자가 실제적으로 계약서에 의도된 목적으로 사용할 수 있는 상태(표준계악일반조건 48. 1)"를 말하므로, 이 점에 착안하여 발주자가 시설물을 제때에 사용하지 못함으로써 발생되는 지체보상금(Liquidated Damage)을 물지 않도록 작전을 세운다.
Korean Journal of Construction Engineering and Management
/
v.3
no.1
s.9
/
pp.107-114
/
2002
Recently, a few major construction companies in Korea have a growing interests to the risk management system, and they are trying to apply it to their construction projects. However, the existing methodologies to be applied to the foreign public projects are not proper to the construction environments due to its adaptabilities, that has one time process and heavily depends on personal judgement. The purpose of this paper is to propose a risk response process in consideration of the residual risks, which would be more adaptable and practical in the construction environment, overcoming the current obstacles to be mentioned above. This process has systematic repeat process until the residual risks go down to the risk thresholds based on the efficiency of specific response strategy.
Proceedings of the Korean Society of Disaster Information Conference
/
2023.11a
/
pp.93-94
/
2023
해체공사는 작업의 특성상 단기간에 이루어지며, 해체공사 현장에 투입되는 근로자는 일용직 근로자가 대부분으로 안전사고의 비율이 높다. 사업장 위험성 평가에 관한 지침에는 위험성 평가시 근로자를 참여토록 하고 있으나 해체현장의 특성상 근로자가 참여한다고 하여도 위험요소를 파악할 역량이 부족할 따름이다. 또한 기존의 해체공사 안전관리 매뉴얼은 구조안전성 확보를 위한 매뉴얼로 해체 근로자의 안전을 위한 매뉴얼은 없는 실정으로, 근로자의 안전을 확보하기 위한 위험성 평가 매뉴얼이 요구되고 있다. 이에 본 연구에서는 건설공사 안전관리 종합정보망(CSI)의 해체 및 철거공사의 사고사례를 분석하였으며, 해체 및 철거 사고시 발생한 주요 위험요소를 도출하여 작업 공종별로 유해·위험요인의 파악을 손 쉽게 할 수 있도록 하였다. 또한 해체 현장 규모에 따라 대규모 현장은 빈도·강도법, 중·소규모 현장은 체크리스트법을 활용하여 위험성을 결정하고 감소대책을 수립할 수 있도록 매뉴얼을 구성하였다. 잔여 위험에 대해서는 관리카드를 만들어 해체공사 완료시까지 관리하도록 하였다.
The Journal of the Korea institute of electronic communication sciences
/
v.8
no.2
/
pp.307-312
/
2013
The compensation system for residual land in our country is largely composed of the three sub-systems, that is, the purchasing compensation, depreciated compensation and construction expenses compensation. Among those, the purchasing compensation system mainly has problems in eligibility for compensation of the land, meanwhile, there is almost no problem in construction expenses compensation system. This study aims to examine the current depreciated compensation system for the residual land and its accompanying problems, and also review and compare those systems in USA and Japan with that of our country, and thereby discover the ways for the alternative solution for the compensation system in the viewpoint of policy.
Proceedings of the Korean Society for Rock Mechanics Conference
/
2004.10a
/
pp.13-22
/
2004
본 연구에서는 도심지 지하철 터널을 대상으로 지반공학적 위험요소가 공사비 및 공기에 미치는 영향을 정량적으로 평가하기 위하여 잔여 리스크 개념을 이용하여 조사개소의 증가에 따른 공사비 및 공기의 신뢰도를 분석하였다. 신뢰도 분석결과, 지반조사 개소가 증가함에 따라 공사비 및 공기에 대한 위험도가 축소됨을 확인하였으며, 이러한 결과를 통하여 도심지 지하철 터널에서의 지반공학적 위험도 분석의 유용성을 확인하였다.
Korean Journal of Construction Engineering and Management
/
v.6
no.6
s.28
/
pp.181-192
/
2005
Labor work information can be converted into the useful construction information in an effort to analyze project status, measure performance, and design a new similar project plan. The labor work information can also be used to make productivity data, which can be used to analyze the relationship between 'as planned' and 'as built' in scheduling management of a project, and to calculate 'percent completion' as well as analyzing delay cause. It is require to effectively collect the labor work information base on the activities. In general, current project management heavily depends on the experience and judgment of project managers, according to the work progress. However, relying on the oかy experience and judgment of the project managers might deteriorate the transparency or reliability of the collected labor work information. The purpose of this research is thus to develop a computer-based system for monitoring the work information generated by labors input in activities using PDA and Barcode technologies, and to propose a application method of the productivity data for effective project management.
The effects of after-treatment condition on the permeability of polysulfone hollow fiber membranes were investigated. It was well known that the permeability of and the rejection of hollow fiber membranes prepared by dry-wet spinning technique was highly affected by spinning conditions such as composition of spinning solution, inner and outer coagulant and spinning height. But these are also governed by after-treatment condition such as drying, hot water treatment and glycerine treatment. Since it was difficult to remove DMAc and NMP in membranes by washing with in cold water and even traces of such solvent affected the reproducibility of the membrane characteristics, the hot water-treatment should be required.
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.3A
/
pp.341-347
/
2008
Among coating systems used for steel bridge coatings on highway such as red lead-pigmented alkyd, chlorinated rubber, waterborne inorganic zinc, inorganic zinc/epoxy/urethane and inorganic zinc/epoxy/fluororesin, evaluation of deterioration degree and prediction of lifetime through regression analysis were carried out for coating systems widely used and grossly degraded. For evaluation of deterioration degree, 75 bridges on highway were selected, and evaluations were carried out according to point offering method regulated by Guideline of maintenance coating for steel bridges used in Korea Expressway Corporation. Lifetime prediction results showed 13.0~13.3 years for the whole nation, 11.8 years for urban and industrial region in the metropolitan area, 13.2 years for rural region except the metropolitan area, 13.5~13.7 years for chlorinated rubber coating systems, and 12.86 years for red lead-pigmented alkyd systems. For prediction of the rest life of coating, we tried to execute parallel translations of standard deterioration curve to current life and deterioration degree for both x and y axes, and it was thought that parallel translation for x axis corresponded to deterioration aspects in actual environment. Maximum and minimum equations were derived from standard deterioration equation by adding and subtracting error values deduced in regression analysis to/from each coefficient in order to establish maintenance coating criteria for overall steel bridges on highway. Whole domain was divided into 8 parts in order to predict the rest life of coating and optimum time of maintenance coating, and maintenance coating criteria for each 8 domains were presented.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.224-227
/
2004
As a project progresses, it is well known that construction manager has to define the contingency for the expected project cost, which is used as a buffer for uncertainty. In this study, we mention uncertainty as the amount of likelihood that is difficult or impossible to predict project cost. From the completed work package, we obtain the true cost value, and this information is technically good data for estimating the realistic contingency of work packages to be accomplished. Based upon this historical information, construction manager recomputes the contingency for the remaining works. Conditional probability theory is often useful for re-estimating one of the remaining project progress as the true cost of the completed works can be different from the planned cost. As a project is progressing, true value is really important to predict the realistic project budget and to decrease the uncertainty. In this study, we gave applied conditional probability theory to estimating project contingency supposing a project that consists of fire work packages, provide the fundamental framework for setting and controlling project contingency.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.