• Title/Summary/Keyword: 잔류침하

Search Result 57, Processing Time 0.02 seconds

The Practical Simplified Equation for Settlement Evaluation of Counter Facility in Soft Ground Centering on Rubble Mound (연약지반에 설치된 항만 외곽시설의 안전점검을 위한 침하 평가 간편식 제안 - 사석경사제 중심으로)

  • Kim, Yong-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.6
    • /
    • pp.317-324
    • /
    • 2020
  • In this study, a simplified equation for settlement evaluation suitable for the special conditions of a counter facility is suggested. Recently, counter facilities, especially breakwaters, are constructed on soft ground in distant seas as new-port development projects. A counter facility that resists the external forces by self-weight settles easily when constructed on soft ground. Settlement in a counter facility and breakwater is not an important factor for maintenance than a land facility. On the other hand, the current settlement evaluation criteria are excessive for conducting a safety inspection. A settlement evaluation from a safety inspection followed by "Detailed Guidelines for a safety inspection on a counter facility" is used. A simplified equation was proposed to calculate the maximum settlement by applying the allowable residual settlement or settlement stability evaluation results. The suitability of the simplified equation was assessed compared to the assessed rating from the settlement survey results. The proposed simplified equation showed that the settlement evaluation rating had been upgraded. The proposed simplified equation is expected to be used to evaluate the practical structural stability and functional performance.

A Study on the Mechanical Characteristics of Tunnel Structures and Ground Behavior by Synthetic Analysis Method with Tunnel Monitoring Results used (터널의 계측결과 종합분석에 의한 지반의 거동 및 터널 구조체의 역학적 특성 연구)

  • Woo, Jong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.3
    • /
    • pp.115-124
    • /
    • 2003
  • In this study, the relationships between the displacement and stress of the tunnel using various analysis methods were compared with monitoring results carried out during construction and maintenance monitoring. The behavior of tunnel were measured in the subway tunnel passing comparative soft the weathering and analyzed both security and mechanical characteristics of the tunnel lining. With the results of simplified monitoring observed in top heading and bench excavation tunnel, it is confirmed that the crown settlement is larger than the surface settlement. it is interesting to note that the crown settlement and the crown shotcrete lining stress are widely used monitoring items for the back analysis. It is analyzed that the residual water pressure applied in the drainage type tunnel is reasonable.

Characteristics and Causes of Wave-Induced Settlement in Caisson Breakwater: Focusing on Settlement Data (파랑에 의한 방파제 케이슨 침하 경향 및 원인 분석: 침하 계측자료를 중심으로)

  • Kim, Tae-Hyung;Nam, Jung-Man;Kim, In-Sok;Yun, Seong-Kyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.7
    • /
    • pp.27-40
    • /
    • 2014
  • So far, studies on the settlement of breakwater have mainly been conducted through numerical model tests focusing on an analysis or through the laboratory wave tank tests using a scaled model. There has not been a study on the settlement that is measured in an actual breakwater structure. This study analyzed the data of settlement that has been measured in an actual caisson breakwater for a long time and the characteristics and causes of wave-induced settlement in the caisson (including beneath ground), based on qualitative aspect, were examined. The analysis revealed that wave clearly has an effect on the settlement in caisson, especially in the condition of high wave such as typhoon. Caisson settlement is caused by the liquefaction of ground, which is due to the increase of excess pore pressure, the combination of oscillatory excess pore pressure and residual excess pore water pressure, and the solidification process of ground due to dissipation of the accumulated excess pore pressure. The behavior of excess pore pressure in the ground beneath the caisson is entirely governed by the behavior of the caisson. Ground that has gone through solidification is not likely to go through liquefaction in a similar or a smaller wave condition and consequently, the possibility of settlement is reduced.

Residual Stresses and Fracture Toughness in $Al_2O_3$/Al FGMs ($Al_2O_3$/Al 경사기능 재료의 잔류응력 및 파괴인성)

  • 정태주
    • Proceedings of the Korean Powder Metallurgy Institute Conference
    • /
    • 2003.04a
    • /
    • pp.59-59
    • /
    • 2003
  • 경사기능 재료는 위치에 따른 특성 변화를 갖고 있어 변화하는 주변 환경에서 사용되는 재료의 응용성을 높일 수 있는 장점이 있다. 적합한 경사기능 재료의 제조를 위해서는 탄성률, 강도, 인성 등의 위치에 따른 변화를 예측하는 것이 필요하다. 그러나 재료 내에서의 탄성률 변화 등으로 인해 경사기능 재료에서 인성을 정량적으로 표현하는데는 어려움이 있으므로 이를 정량적으로 측정하고, R-curve를 결정하는 것은 재료의 응용성에 중요한 인자가 된다. 본 연구에서는 폴리우레탄 스폰지를 이용하여 밀도의 분포가 연속적으로 다른 폴리 우레탄 스폰지를 제조하고 이에 알루미나 분말 슬러리를 이용하여 slip casting을 행하였다. 그 후 폴리 우레탄 스폰지를 탈지한 후 알루미나 성형체를 소결하여 연속적인 기공률 분포가 다른 다공성 알루미나를 제조하였으며, 이에 Al을 용침하여 $Al_2O_3-Al$ 경사기능 재료를 제조하였다. 이러한 $Al_2O_3-Al$ 경사기능 재료에 대해 파괴인성 및 R-curve 특성을 CT(conpact tension)시편으로 측정하였으며, 이를 균일한 복합체의 파괴인성과 비교하였다. 또한 잔류 응력 특성을 파악하기 위해 실험적이 응력 데이터를 Moire interferometry를 이용하여 결정하였다. 또한 이를 유한요서 해석법(FEM)에 의한 계산치와 비교하였다. 서로 다른 조성 분포를 갖는 $Al_2O_3-Al$ 경사기능 재료와 균일한 복합체의 파괴인성을 비교한 결과 동일한 Al조성에서도 서로 다른 파괴 인성치가 나타났다. $Al_2O_3-Al$ 경사기능 재료에서 파괴인성에 영향을 줄 수 있는 인자로는 술수한 $Al_2O_3$의 파괴인성에 Al금속의 소성변형에 의한 인성증진 효과, 그리고 경사기능 재료에서 상호 조성차이에 따른 잔류응력을 고려할 수 있을 것이다. 이중 $Al_2O_3-Al$ 경사기능 재료의 파괴인성에 미치는 잔류응력의 영향을 고려하기 위해 이의 잔류응력에 대해 실험에 의한 유추된 잔류응력과 FEM계산에 의해 유추된 잔류 응력을 비교, 분석하였다.

  • PDF

Wave Propagation on a High-speed Railway Embankment Using a Pile-slab Structure (파일슬래브구조가 적용된 고속철도 토공노반에서의 진동 전파)

  • Lee, Il Wha;Lee, Sung Jin;Lee, Su Hyung;Lee, Kang Myung
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.4
    • /
    • pp.278-285
    • /
    • 2013
  • The suppression of residual settlement is required on earthwork sections as concrete track is introduced. Use of pile-slab structure is one of the settlement restraining methods applied on soft ground. The slab distributes the upper embankment load and piles transfer the load from the slab to the stiff ground. While this method is very effective in terms of load transfer, it has not yet been established for dealing with the vibration transfer effects and interaction characteristics between a structure and the ground. It is possible that vibration caused by a moving train load is propagated in the upper embankment, because the slab acts as a reflection layer and waves are multi-reflected. In this present paper, wave propagation generated by a moving train load is evaluated in the time and frequency domains to consider a roadbed structure using an artificial impact load and field measured train load. The results confirmed the wave reflection effect on the pile-slab structure, if the embankment height is sufficient, vibration propagation can be stably restrained, whereas if the height is not sufficient, the vibration amplitude is increased.

A Prediction of Long-Term Settlement in Large Reclamated Sites Using Laboratory Consolidation Tests and GIS Techniques (실내압밀시험과 GIS 기법을 이용한 대규모 매립지역의 장기침하량 예측)

  • Park, Sa-Won;Kim, Hong-Taek;Park, Sung-Won;Baek, Seung-Cheol;Park, Sang-Kwon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.3
    • /
    • pp.5-19
    • /
    • 2006
  • The secondary consolidation settlement of soft clay is generally very little compared to the total settlement and occurs very slowly during long-term period. However the secondary consolidation settlement is comparatively large amount in organic and heavily compressed clay and is a very important engineering factor. In order to reduce residual settlements in reclaimed soft ground, the preloading method is often used. In this study, in order to determine reasonable long-term settlements of large reclaimed site, laboratory incremental loading consolidation tests and surcharging consolidation tests are performed. Sampling was done at Incheon area of west coast and Gwangyang area of south coast in Korea. The characteristics of secondary consolidation have obtained through laboratory tests and analyzed systematically to predict long-term settlements. Additionally, the location data and laboratory test results are correlated by using GIS(geographic information system). The secondary consolidation settlement of the site was predicted based on D/B and the operation technique and estimation technique of space of GIS.

  • PDF

Critical face pressure and backfill pressure of shield TBM considering surface settlements of saturated clayey ground (쉴드 TBM 굴진에 따른 포화 점성토 지반의 침하거동을 고려한 한계 굴진면압과 한계 뒤채움압)

  • Kim, Kiseok;Oh, Ju-Young;Lee, Hyobum;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.433-452
    • /
    • 2018
  • The shield tunneling method can minimize surface settlements by preventing the deformation of tunnel face and tunnel intrados due to tunnel excavation. For this purpose, it is very important to control the operating conditions of shield TBM. The face pressure and backfill pressure for tail void grouting should be the most important and immediate measure not only to restrain surface settlement, but also to influence the effective stress and pore water pressure around the circumstance of tunnel during excavation. The reaction of the ground to the application of face pressure and backfill pressure relies on the stiffness and permeability of ground. Especially, the reaction of saturated clayey ground formations, which shows the time-dependent deformation, is different from the permeable ground. Hence, in this paper it was investigated how the TBM operating conditions, ground stiffness, and permeability impact on the surface settlement of saturated clayey ground. For this purpose, a series of parametric studies were carried out by means of the stress-pore water pressure coupled FE analysis. The results show that the settlement of soft clayey ground is divided into the immediate settlement and consolidation settlement. Especially, the consolidation settlement depends on the ground stiffness and permeability. In addition, the existence of critical face pressure and backfill pressure was identified. The face pressure and backfill pressure above the critical value may cause an unexpected increase in the ground settlement.

Settlement Characteristics of Large Drilled Shafts Embedded in Bed Rocks (암반에 근입된 대구경 현장타설말뚝의 침하특성)

  • Hong Won-Pyo;Yea Geu-Guwen;Nam Jung-Man;Lee Jae-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.5
    • /
    • pp.111-122
    • /
    • 2005
  • The data on the pile load tests performed on 35 large drilled shafts are analyzed to investigate the load-settlement characteristics of large drilled shafts embedded in bed rocks. Generally, the settlement of large drilled shafts embedded in bed rocks is too small to determine the ultimated load with application of the regulation in design code for either the total settlement or the residual settlement. Therefore, to determine the yield load of large drilled shafts embedded in bed rocks, p(load)-logS (settlement) curve method, which has been proposed originally for the driven pile, was applied to the investigation on the data of the pile load tests. This technique shows that the yield load can be determined accurately and easily rather than other conventional techniques such as P-S, logp-logS, S-logt, and P-S curve methods. An empirical equation is proposed to represent the relationship between pile load and settlement before the yield loading condition. And the settlement of piles was related with the depth embedded in rock as well as rock properties. Based on the investigation on the data of pile load tests, the resonable regulations f3r both the total settlement and the residual settlement are proposed to determine the yield load of large drilled shafts embedded in bed rocks.

Survey and Numerical Analysis Cases of Ground Subsidence by Mine Goaf (광산 채굴적으로 인한 지반침하 조사 및 해석 사례)

  • Hyun-Bae Park;Seong-Woo Moon;Sejeong Ju;Jeungeum Lee;Yong-Seok Seo
    • The Journal of Engineering Geology
    • /
    • v.34 no.1
    • /
    • pp.1-12
    • /
    • 2024
  • South Korea's mining industry was actively developed until 1980, but subsequent declining profitability forced many mines to close. Most of the abandoned mines are susceptible to persistent subsidence because of the length of time since mining ceased. Accurate prediction of the locations and times of subsidence is difficult; therefore, this study aims to apply continuum analysis to past cases of subsidence to establish a method of predicting the location and magnitude of future subsidence. The study area is an area of ○○ mining located between the Yangsan fault zone and the Moryang fault zone, in which three subsidence events occurred between 2005 and 2009. Drilling surveys and electrical resistivity surveys were performed at subsidence sites determined the distribution of strata, and through laboratory tests obtained the physico-mechanical properties of the rock. Numerical analysis of the results found that the plastic status area includes the areas of actual subsidence and that continuum analysis can also be used to predict the location and magnitude of subsidence caused by mine goaf.

A Study on the Behavior of Steel Pipe Subjected to Vertical Load inSand (사질토 지반에서의 강관 말뚝의 수직거동 연구)

  • 김영수;허노영;김병탁;김대만
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.6
    • /
    • pp.5-13
    • /
    • 2000
  • 모래지반의 상대밀도, 말뚝의 시공방법, 일정근입깊이에 따른 소요향타 에너지 그리고 지하수 조건에 따라 말뚝의 지지력과 하중전이를 연구하기 위하여 강관말뚝을 이용한 모형실험을 수행하였다. 매입말뚝은 말뚝을 미리 설치한후에 지반성형을 실시하였고, 타입말뚝은 매입말뚝과 같은 깊이까지 항타높이를 5, 10, 15cm로 달리하여 말뚝을 관입하였다. 그 뒤 정적하중을 단계적으로 가하여 하중-침하 곡선에 의한 모형 말뚝의 지지력과ㅏ 말뚝내의 등간격으로 설치된 변형 게이지를 이용하여 타입말뚝 의 하중전이에 대해 살펴보았다. 타입말뚝의 하중전이시험에서는 항타 전과 항타 후 말뚝내 하중전의 소효항타 에너지에 따른 변화를 관찰하였다. 매입말뚝의 시험결과는 현재 가장 많이 사용하고 있는 대표적인 정적 지지력 공식들에 의하여 계산되어진 값들과 비교 분석하였다. 그 결과 상대밀도가 작은 느슨한모래지반에서는 Vesic 공식이 그리고 상대밀도가 큰 조밀한 모래지반에서는 Hanbu 공식이 가장 근접한 평가를 나타내었다. 하중전이시험에 의한 항타시 잔류응력은 모든 경우에서 지표면과 선단부위에서 아주 큰 잔류응력이 나타났고. 말뚝의 선단 지지력비는 상대밀도에 비례하게 증가하였다.

  • PDF