Reengineering Daily Reporting Process by Using Task Generator and Mobile Technology (작업생성기와 모바일 기술을 이용한 작업일보 프로세스 리엔지니어링)

  • Kang Woo-Young;Chin Sangyoon;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.100-110
    • /
    • 2005
  • As construction projects are getting more complex and larger in size, the amount of information is increased exponentially, which requires information management systems to accumulate as-built information throughout the project life-cycle. Particularly, a daily report system is very important, since it helps them keep track of various as-built information at the most detailed level. However, there have been many problems with daily reporting since its process is time-consuming and contains a lot of redundancies and ambiguities. Therefore, the objective of this research is to improve a process of collecting as-built information and managing daily report. To do so, this research developed a to-be process model and a daily report system. The daily report system developed in this research consists of interactive task generator and daily report management modules. The system has been successfully implemented in a real world construction project. The system development processes including process analysis, information models and system features are described along with discussions on the results and improvements.

Daily Reporting System using Digital Pen at Construction Site (디지털펜 기반의 건설현장 작업일보시스템 개발)

  • Shin, Yoonseok;Kim, Daewon;Kim, Tae-Yong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.177-183
    • /
    • 2016
  • The daily report includes the most detailed information and various daily planning and performance data recorded at a site, and includes work types, the number of workers, and the equipment and materials used. However, in the daily reporting process, some information can be omitted or distorted or even made redundant due to there being several steps of manual input. For this reason, the daily report is utilized for a simple report rather than for an appropriate purpose. Thus, to resolve the issues of the existing daily report system mentioned above, a daily report system using a digital pen was developed and then applied to an actual construction site to verify its applicability. As a result, it was found that 96.610% recognition accuracy of handwritten letters could be achieved. In addition, it was no longer necessary to enter the same information multiple times and no additional training or education for using a mobile device was needed. The digital pen-based daily report program developed in this study is expected to contribute to an improvement of information management efficiency and site document management work by addressing the problems of the existing report system.

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF

A Study on the Tact Management Using a Daily Report Information (작업일보 정보를 이용한 택트공정관리방안 연구)

  • Kim Sun-Kuk;Na Kwang-Soo;Kim Tea-Hui;Yu Jung-Ho;Lee Hyun-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.80-87
    • /
    • 2003
  • Recent construction projects, characterized by its complication and high-tech, requites highly efficient management efforts. Among others, labor management is very important due to various trades and increasing number of activities. Along with advanced information technology, Web-based construction site management systems are widely adopted in order to improve the efficiency of construction management. However, such information systems have mainly 2 (two) shortcomings. One is that the existing systems were developed and implemented not in subcontractor-centered way but in main contractor-centered way, though the daily construction information is mainly generated, gathered and reported by subcontractors. As a result, subcontractors seldom have access to such information systems. The other is that loss or omission of information may uclw during the information processing process, in which subcontractors have no direct access to such information system. This becomes a major reason of losing the reliability of the information in daily construction report. As a solution for these problems, this paper suggests a Web-based information system that is subcontractor-oriented and also suitable for tact schedule management.

The Analysis of Current Daily-Report System and The Proposal of Improvement Framework (작업일보 현황 분석에 따른 개선방향 제시)

  • Kim Bong-nyoun;Kim Chang-Duk;Ee Hyun-Soo;Kim Sun-Kuk;Seo Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.66-73
    • /
    • 2003
  • Building construction projects are performed by a number of sub-contractors specialized in diverse trades. Therefore information management among these constituents is quite challenging especially due to exponentially increasing manpower and material resources. In recognition of the importance of information management in project sites a number of systems have been suggested, but the application is limited one of the main reason is that general contractors use these systems and sub-contractor's participation understanding and financial ability are limited. Besides other problems such as loss along communication channel, distortion of information due to inefficient input device and tremendous amount of time and labor are required for collection analysis, and management of information to prepare a daily-report. Therefore the Purpose of this study is to improve reporting process through analyzing current daily reporting system. This paper also suggests the direction of the improved daily reporting system to enhance the performance of construction projects through incorporating sub-contractor's participation in daily reporting system.

Web-based Coordination System for Daily Work Report between Contractor and Subcontractor (원수급업체와 하수급업체간 웹기반 작업일보 연동시스템 개발)

  • Seo Hae-Jun;Koo Kyo-Jin;Um Ik-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.370-375
    • /
    • 2004
  • The management of daily work report is very important due to the variety of work trade and activities. Although various project management systems have been developed to effectively deal with various task in site, they are not in practical use due to the non-coorperative attitude of sub-contractors. This is the reason the system are not developed in the focus of sub-contractors, but main contractors and the detail information about daily work report is omitted or lost in the collection process by contractors. Therefore the purpose of this study was to propose the Web-based coordination system for daily work report between contractor and sub-contractors

  • PDF

A Task Information Framework for Daily Report Management (작업일보 관리를 위한 단위작업 정보체계 분석)

  • Kang Woo-Young;Chin Sang-Yoon;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.513-516
    • /
    • 2003
  • With the size of construction projects getting larger and more complex, the amount of information is increased exponentially. Although there are a lot of construction companies that try to accumulate as-built information from construction sites. it has not been quite satisfactory. This is due to the lack of task information framework that can measure project performance and collect as-built information. Therefore the objective of the paper is to identify the information that can be derived from daily reports and to suggest a unit task information framework to accumulate as-built information.

  • PDF

A Development of Task Generator through an Analysis of Task Location Information Structure (작업위치 정보체계 분석을 통한 작업정보 생성기 개발)

  • Chin Sangyoon;Kang Woo-Young;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.64-71
    • /
    • 2004
  • A daily report is one of the critical documents in construction projects, since it helps them keep track of various as-built information. Despite the important role in progress management, the daily reporting process is time-consuming, and the representation of task information on daily reports are not effective enough to accumulate daily as-built information for further use in project management. Task information is composed of a specific work type and a location where the task is performed, which means that the same type of work is repeated over the locations. However, in many cases the task locations are described differently depending on a reporter's preference or experience. Without representing task location information effectively, it is difficult to accumulate and to reuse as-built information. The objective of this research is to build a framework for generating task information which can be efficiently accumulated and reused for progress management. To do so, this research built a task information model with focusing on the representation of task location associated with a work type, and developed an information system that supports automated and interactive generation of task information.

Design And Implementation of Production Communication Management System for P.O.P Terminal (P.O.P 단말기를 이용한 생산통신관리 시스템의 설계 및 구현)

  • 홍수열
    • KSCI Review
    • /
    • v.8 no.2
    • /
    • pp.51-57
    • /
    • 2001
  • 다품종 소량 생산으로 제조 업체의 전산 업무 관리가 매우 복잡해지고 있고, 전산 시스템이 급속히 변하며 환경이 복잡해지고 있으며. 전산에 입력해야 할 데이터들은 많아지고 있다 그래서 제조 업체의 근태 및 입출고 전표, 작업 일보 데이터를 사람이 일일이 입력하기엔 많은 전산 단말기와 용량이 큰 시스템을 요구하고 있으며, 현장 데이터의 실시간 처리 및 확인이 어려운 상태이다. 본 논문에서 제안된 P.O.P(Point Of Production) 단말기를 이용한 생산통신관리 시스템은 제조 업체 현장에 P.O.P 단말기를 설치하여 현장에서 일어나는 모든 입출고 및 생산 데이터를 생산 시점에서 입력 할 수 있는 기능을 가진 시스템을 설계하고 구현한다.

  • PDF

안전현장스케치 - 인쇄업종의 안전 선도기업 '한국미디어프린팅'

  • Yeon, Seul-Gi
    • The Safety technology
    • /
    • no.199
    • /
    • pp.26-28
    • /
    • 2014
  • 인쇄업종은 예전부터 안전사고가 다발하는 위험업종으로 알려져 있다. 업종특성상 중량물 취급 작업과 유해물질의 사용이 많은 데다, 날카로운 인쇄판을 다루기 때문이다. 그런데 최근 이런 인식이 편견에 불과하며 인쇄업종도 적극적인 개선과 노력을 통해 얼마든지 우수 안전사업장으로 거듭날 수 있음을 보여주는 사업장이 있어 큰 주목을 받고 있다. 그 주인공은 바로 경기도 성남에 위치한 '한국미디어프린팅'이다. 한국일보의 자회사인 이곳 사업장은 대대적인 자동화시스템으로의 개선과 임직원 모두의 적극적인 안전활동을 통해 안전사고를 대폭 감소시킨 것은 물론 품질 향상도 이뤄냈다. 우수한 안전관리를 통해 인쇄업종의 선도기업으로 자리매김하고 있는 이곳 사업장을 찾아가봤다.

  • PDF