Forest projects often apply construction industry labor rates, without considering the demanding work conditions and labor intensity unique to forest operations, resulting in workplace issues. This study aims to analyze forest operations' characteristics and wage survey methods in other fields to establish a framework for surveying the wages of forest workers. The developed framework was tested through direct surveys conducted with all forest operation companies. Survey items included actual wages by occupation, identification and removal of outliers using quartile deviation, and occupation-based wage calculation. Results revealed that the appropriate wages for 2022 were as follows: KRW 163,376 for general workers, KRW 221,407 for special workers, KRW 250,045 for work leaders, and KRW 239,863 for wood cutters. These figures were 16.27% higher than those derived from the standard construction wage survey. The developed framework was validated by comparing the appropriate wages with both the standard construction wage survey and the forestry workers' wage. The results indicated that the wages calculated using the developed framework were 4.5% more similar to the forestry workers' wage compared with those from the standard construction wage survey. Consequently, the standard construction wage survey was deemed unsuitable for forest projects. To ensure efficient forest operations, it is imperative to conduct wage surveys using the developed framework over multiple years to accumulate sufficient data.
Korean Journal of Construction Engineering and Management
/
v.7
no.2
s.30
/
pp.127-137
/
2006
Productivity is important to evaluate an efficiency of performed work and organization in construction industry. The productivity should be defined as activity level rather than macro level in order to effectively use productivity data and manage a project. The primary objective of this study is to develop a construction productivity management system using data warehouse, OLAP and data mining technologies which enables to easily accumulate the construction productivity data and perform multi layer analysis. Finally, it is anticipated that the effective use of the developed system would be able to measure the result of project and make a plan of the similar project with reliability.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.427-432
/
2004
As it is keen competition of a construction market and the recognition that increases construction productivity for maintaining competitiveness, it is increased importance of an interest about productivity and efficiency in the construction industry. This study measures productivity through the instance of investigation that the existing productivity measurement method was utilized and presented a work improvement matter based on the measured contents. The proposed improvement matter is verified through a simulation technique. The purpose of this paper is for a field supervisor to have presented the way that a selection does the most suitable work method to be suitable for a situation, and can forecast production, though a simulation technique is not the most alternative that considered field condition in analyzing productivity measurement.
세계화에 따른 경쟁의 심화는 국가의 개입여지는 축소됨과 동시에 지방이 경쟁단위로 노출됨에 따라 지역의 역할이 증대된다. 이러한 변화에 따라 지역산업정책의 여건을 분석하고 지역의 수요에 부응하기 위해 노력하는 것은 지역 선도 R&D 연구센터로 발전하고자 하는 대경권연구센터에 있어서 매우 의미있는 작업이 될 것이라 여겨진다. 따라서 최근 지역산업정책에 큰 변화를 가져온 두 가지 흐름인 5+2 광역경제권 선도산업과 첨단의료복합단지 조성사업과 더불어 기존 지역산업정책인 전략산업의 현황을 분석하고 대경권연구센터와 에트리 본원의 역할방향 및 시사하는 바를 논의하고자 한다.
물류활동에서 운송부분이 차지하는 중요성은 기업의 경영자층에게 더욱 중요하게 인식되고 있는데, 이는 경쟁 환경 때문이다. 경쟁환경에서는 'Output Logistic' 즉, 운송활동의 수행정도에 따라 물류활동의 성패가 결정된다. 따라서 기업물류활동의 근간인 운송활동의 주요 결정요인과 선택형태를 알아보고, 이들이 실제로 기업의 물류활동에 어느 정도 영향을 미치는지를 심층적으로 분석해보는 것도 매우 의미 있는 일이라 하겠다. 더구나 우리 나라의 현재의 경제여건에서는 물류비에 대한 효율화 작업이 필요한데 반해 그 동안의 연구들을 살펴보면 SP 자료를 이용한 가상적 상황하에서의 화주의 선택행태를 분석하였으므로 실제 선택한 수단간의 gap을 극복할 수 없었다. 기업은 운송수단의 선택시 복잡한 결정과정을 갖는다. 이는 운송부문이 총물류비용에서 차지하는 중요도 때문이다. 기업의 운송관리자는 화물을 출하할 때마다 선택의 기로에 서게 된다. 즉, 일부는 조직 체계나 다른 계약 여건에 따라 이전과 동일한 수단을 선택하는 경우도 있지만, 많은 경우에는 매번 출하시 마다 최적의 운송수단을 선택하기 위한 새로운 결정을 하게 된다. 본 연구는 이러한 화주의 수단선택행태를 실제 RP 자료를 이용하여 분석하였다. 수단선택모형의 적용 및 분서결과를 살펴보면 상당히 attractive한 결과를 발견할 수 있는데 각 품목별 추정 값이 운송거리에 대해서는 음으로 운송비용에 대해서는 양으로 나타나고 있다. 다시 말하면 운송거리가 길수록 효용은 감소하고 운송비용이 커질수록 효용은 증가한다는 것을 의미하므로 그 분석결과가 올바른 결과를 도출하고 있지는 않다. 그러나 여기서 알수 있는 것은 운송거리와 운송비용이 각각 주요한 변수라는 것이다. 모형의 타당성을 검증하기 위해서는 logilikelihood 값을 구하여 $\rho$^2분석을 시행하였다. 여기서는 각 품목별로 $\rho$^2값이 약 0.15~0.3의 비교적 높은 수치를 보여주고 있으므로 모형의 설명력이 어느 정도 있다는 것이 아울러 증명이 되었다. 상관관계에 대한 분석에서는 영업용 차량간의 상관관계가 높게 나타났으며, 이는 곧 영업용 화물차량을 적재중량별로 구분하는 것이 별 의미가 없음을 의미한다. 다시 말하면 자가용 차량을 보유하고 있지 않은 회사는 다른 운송전문업체에 화물운송을 의뢰하게 되므로 출하중량에 따라 화물차량을 구분하는 것에 대해서 그다지 큰 고려를 하지 않는 것으로 해석할 수가 있다.
Korean Journal of Construction Engineering and Management
/
v.20
no.4
/
pp.69-76
/
2019
This paper presents a method that identifies the unsafe behaviors at the level of near-misses using image analysis. The method establishes potential collision hazardous area in earthmoving operation. It is implemented using a game engine to reproduce the dangerous events that have been accepted as major difficulty in utilizing computer vision technology to support construction safety management. The method keeps realistically track of the ever-changing hazardous area by reflecting the volatile field conditions. The method opens a way to distinguish unsafe conditions and unsafe behaviors that have been overlooked in previous studies, and reflects the causal relationship which causes an accident. The case study demonstrate how to identify the unsafe behavior of a worker exposed to an unsafe area created by dump trucks at the level of near-misses and to determine the hazardous areas.
Proceedings of the Computational Structural Engineering Institute Conference
/
2011.04a
/
pp.95-98
/
2011
건설공사 프로젝트는 사전 기획 단계, 설계, 계약, 시공, 운영 및 유지관리 등 각 단계의 다양한 참여 주체에 의해 프로젝트가 진행되고 각 분야 간의 원활한 의사소통을 통한 협력 작업으로 일을 진행한다. 그러나 각 단계별 참여주체간의 협업이 어렵고 정보교류가 원활하지 못한 문제점들이 있다. 또한 건설공정은 현장여건의 변화와 불확실성으로 인해 예측이 어렵고, 보다 신뢰성이 있는 계획의 부재로 인하여 각종 세부 공정들 간의 간섭을 유발하고 계획된 일정을 준수하기 어려워 불필요한 비용의 낭비와 공사기간의 증가를 야기한다. 이러한 낭비요인을 최소화하고 건축 프로젝트를 진행하는데 있어서 효율성을 높이기 위해서는 시공계획 단계의 신뢰성을 높여야 한다. 따라서 시공전의 계획 단계에서부터 4D 시뮬레이션을 통하여 이러한 문제점들을 파악하고 개선하는 것이 중요하다. 본 연구에서는 BIM기반의 시뮬레이션 프로그램의 기능분석을 통하여 효율적인 적용과 발전과정을 알아보고자 한다.
Journal of the Korean Society of Marine Environment & Safety
/
v.27
no.1
/
pp.88-96
/
2021
When oil tankers, large passenger ships and cargo ships sink under the sea owing to various maritime accidents, the residual cargo oil or fuel oil in the such vessels could pose direct risk to factor for the marine environment and it require safe and rapid removal. Although domestic and foreign salvage companies are adopting various recovery methods and technologies with customizations according to each site during recovery operations studies on reasonable assessment modules for the operation process are relatively insufficient. In this study, the data from trapped-oil recovery operations performed at different site conditions were collected and analyzed in order to designed an operation assessment module, define the operational process steps in terms of preparation, implementation and completion, and derive key factors for each detailed process. Subsequently, the module was designed in such a way as to construct performance indicators to assess these key factors. In order to exclude subjective opinions from the assessment as much as possible, the assessment each item was constructed with indicators based on data that could be evaluated quantitatively and its usefulness was verified by applying the module to the trapped-oil recovery operation cases. We expect this the method and the technology assessment module for the trapped-oil recovery operation on sunken vessels will help to verify the adequacy of the trapped-oil recovery such operation before or after. Furthermore, it is expected that the continuous accumulation of assessment data and feedback from past or future operation cases will contribute toward enhancing the overall safety, efficiency and field applicability of trapped-oil recovery operation.
Journal of the Korea Institute of Building Construction
/
v.17
no.6
/
pp.535-544
/
2017
This paper analyzes the relations between design errors, prevented by building information modeling (BIM)-based design validation, and their impacts in order to identify critical consideration factors for implementing BIM-based design validation in architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to their causes (illogical error, discrepancy, and missing item) and work types (structure, architecture, and mechanical, electrical, and plumbing (MEP)). The probabilistic relations among the independent variables, including the causes and work types of design errors, and the dependent variables, including the project delays, cost overruns, low quality, and rework generation that can be caused by these errors, are analyzed using logistic regression. The characteristics of each design error are analyzed by means of face-to-face interviews with practitioners. According to the results, the impacts of design error causes in predicting the probability values of project delays, cost overruns, low quality, and rework generation were statistically meaningful.
본 연구는 수도권 남부의 일부지역을 대상으로 시뮬레이션 기법을 이용하여 ITS 서비스 도입효과를 분석함으로써 그 잠재력을 타진해 보고, 특정 ITS 서비스 도입전의 타당성조사에 활용 가능한 시뮬레이션 분석의 사례를 제시하는 것이 목적이다. 본 연구에서는 ITS의 핵심분야인 교통관리(ATMS)와 교통정보제공(ATIS)의 일부 서비스를 중심으로 분석을 실시하였으며, 대상지역에 대한 분석결과에 의하면 ITS 서비스는 그 효과면에서 잠재력이 있는 것으로 파악되었다. 개별 서비스 중에서는 직접적으로 혼잡구간의 수요를 억제하는 램프미터링이 가장 높은 효과를 보였으며, 여러 서비스를 조합하여 실시하는 경우, 혼잡지점에 대한 정보제공은 선별적으로 실시하는 것이 효과적인 것으로 분석되었다. ITS 서비스가 보다 큰 효과를 발휘할 수 있는 경우는 첨두시와 같이 돌발상황이 발생하는 도로가 혼잡하되, 주변의 대안도로가 충분히 확보되어 있고 어느 정도 용량 여유분이 있을 때인 것으로 분석되었다. 본 연구에서 수행한 시뮬레이션 분석 과정은 특정지역의 ITS서비스 도입여부 결정, 도로시설 등의 구축/운영 여건 평가, 서비스 제공전략 도출 등에 활용 가능하므로 ITS 구축사업 착수 이전에 대상지역에 대한 타당성조사 작업의 일부로서 포함될 수 있을 것이다. 따라서 시뮬레이션 모형을 이용한 평가의 과정 및 각 과정별 분석기법을 체계화된 틀로 정립하는 것이 필요하다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.