• Title/Summary/Keyword: 자산관리 계획

Search Result 76, Processing Time 0.024 seconds

Infrastructure Asset Management Methodology Application to Bridge Management (사회기반시설물 자산관리의 교량구조물 적용방안에 관한 연구)

  • Park, Kyung-Hoon;Sun, Jong-Wan;Park, Cheol-Woo;Lee, Min-Jae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6D
    • /
    • pp.727-736
    • /
    • 2009
  • Many of the researchers have tried to enhance the satisfaction of both users and owners of social infrastructures by applying the asset management methodology. This study is to develop more efficient asset management framework for bridge management. Based on various literature review, an asset management procedure for bridge management was suggested, and appropriate practices at each step were given. The suggested procedures include the determination of operation and maintenance strategy, level of service, performance measure, valuation of assets, and decision-makings. In addition, this study suggests an applicable decision-making process for the resource distribution based on the management strategy.

A study on Risk-based Bridge Performance Evaluation Method for Asset Management (위험도 개념을 적용한 교량 자산관리의 성능평가방법 연구)

  • Choi, Hyun-Ho;Sun, Jong-Wan;Park, Kyung-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.22-32
    • /
    • 2013
  • Generally, asset management procedure consists of exact information collection, decision of service level, analysis of aspiration level, analysis of financial condition and available budget, preparation of asset management plan, and value of modified asset. In this study, for the risk-based asset management, condition assessment and performance measuring, assessment of failure modes and risks, evaluation/selection of treatment options, and implementation of optimum solution are additionally included. For this, bridge inventory and performance measure considering risks are classified and method of quantitative/qualitative performance measure is suggested. Also, evaluation method of risk analysis for bridge asset management is suggested and basic research is carried out for applicable method of risk-based asset management. Using suggested risk procedure and method of risk-based bridge service level evaluation, it is possible to perform resonable asset management. Moreover, it is concluded that the proposed applicable method of risk-based asset management will provide a solution to contribute the development of systematical asset management for optimal decision making and prototype asset management system.

Asset Management Information in the Social Infrastructure (공공시설 자산관리 정보화 방안)

  • Choi, Won-Sik;Nah, Hei-Suk;Seo, Myoung-Bae;Jeong, Seong-Yun;Lim, Jong-Tae
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.11
    • /
    • pp.68-79
    • /
    • 2010
  • With the social infrastructure being deteriorated, there is a growing need to introduce the asset management to social infrastructure management in order to increase their value and save budget. Social infrastructure asset management is a new concept of facility management in response to these demands. It is defined as a procedure for collecting and analysing facility maintenance data and for making and practicing an economically optimized management plan. Detailed survey work of asset management business is analyzed in order to derive a strategy for asset management information. The contents of IIMM of New Zealand and the asset management definition of the FHWA of the United States, and representative facility management systems of Korea are analysed. The role between organizations and the relationship between business and organization were analyzed. Information required for asset management and for existing facility management systems is compared with business of asset management. In this thesis, three development strategies are suggested. The first one is to develop core business of asset management while excluding duplicated development. The second one is to divide system's structure into three layers. And the last one is to share information by interfacing asset management systems with existing facility management systems.

A Study on Asset Valuation Method in Educational Facilities Delivered by BTL (BTL 사업 학교시설의 자산 가치평가 기법 연구)

  • Lee, Young-Joo;Soh, Ji-Yune;Lee, Jun-Bok;Han, Choong-Hee;Chae, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.40-49
    • /
    • 2011
  • A number of BTL projects for educational facilities have been augmented because of the increase of newtown development and deflationary policy of class size for learning efficiency. As the operation and maintenance costs rapidly increase, the budget for operation and maintenance is expected to be short. Therefore the asset management maximizing asset value is required to clarify the budget plan and distribution and provide a qualitatively high service. The main objective of this research is to establish asset valuation process in educational facilities delivered by BTL project. In order to meet the research objective, the asset valuation process is established by literature reviews, expert advice, and lessons learned from the developed countries. The developed process includes depreciation by internal accounting law, the core element of valuation, and asset valuation process. The results of the research will be help to offer the qualitatively high service and explain the standard of budget plan. It will assist commencing the asset management system.

Data-driven Interactive Planning Methodology for EPC Plant Projects (EPC 플랜트 프로젝트의 초기 공정계획을 위한 통합 데이터 활용 방안)

  • Wang, Hankyeom;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.95-104
    • /
    • 2019
  • EPC plant projects are large and complex, requiring systematic working methodologies, accumulated data, and thorough planning through communications between the entities. In this study, the method of extracting the process planning information using asset data of the plant project and using it to present the initial process plan is presented through the concept of IAP(Interactive Planning). In order to carry out the effective IAP at the early stage of the project, this study extracted the schedule element information from the asset data, created the process plan for each work package, and applied it to the sample project case. Through the proposed IAP methodology, it is possible to promote the utilization of asset data, to identify schedule risks, and to develop countermeasures, which can form the basis for establishing the process management strategy to successfully complete the project.

Conceptual Study for Risk Assessment of Asset Management of Infra Structure System (국가기반시설 자산관리위험도분석 개념 연구)

  • Park, Mi Yun;Park, Hung Ju
    • Journal of Korean Society of Disaster and Security
    • /
    • v.5 no.1
    • /
    • pp.43-47
    • /
    • 2012
  • The asset management of infra facilities is a total framework for finally supporting a safe and comfortable service, which includes functions of supporting evaluation of condition and performance of infrastructures, making the decision method of repair or rehabilitation of deteriorated facilities, and lengthening the life cycle of structure through the decision of adequate cost and time of repair or reinforcement. In the range of the asset management, organization, human, the target, and information & data of company are included. Therefore, in this paper, appling the method of asset management analysis to the infra structures, the process of the risk assesment using BRE (Business Risk Exposure) and the basis of consisting ORDM (Optimized Renewal Decision-Making) are expressed.

A Benchmarking Study for Deriving Data-driven Asset Management Strategy: U.S. Federal Transit Administration (FTA) Case (데이터 기반 노후 철도시설 자산관리 전략 도출을 위한 벤치마킹 연구)

  • Baek, Seungwon;Yoo, Minkyung;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.5
    • /
    • pp.591-599
    • /
    • 2021
  • Rail transit agencies in Korea have been struggling to set up a performance-based rail facility maintenance plan because there are no formal definition and decision criteria for aging infrastructure. This study investigates the definition of aging infrastructure through extensive literature review and identifies benchmarking criteria through comparison with rail transit facility management systems in Korea and United States. As results, an aging infrastructure should be defined considering both service age and performance level of a facility. The priority of repair/replacement should be also determined with reasonable criteria based on relationship between service age and performance level. To determine the definition and decision criteria, a practicable classification system for aging rail transit needs to be established in accordance with classification system for performance assessment. Furthermore, a comprehensive database needs to be built including useful life, performance level, and maintenance cost of each component of rail transit. It will allow establishing an efficient budget execution plan for aging infrastructure.

MND-ONS System Constructing on Intranet (인트라넷 환경에서 MND-ONS 시스템 구축)

  • Jung, Han-Young;Lee, Sang-Hoon
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2007.10d
    • /
    • pp.184-189
    • /
    • 2007
  • 물류유통분야에서는 SCM(Supply Chain Management)의 효율을 위하여 RFID 기술의 적용을 날로 확대하고 있다. 시대흐름에 편승하여 국방에서는 군수분야에 이 기술을 적용하고 있다. 군수물자 관리에서 필요성을 인식하고 국방탄약관리 시스템 구축사업, 신무기체계 자산관리 시스템 구축사업 등에 RFID 기술을 적용하였다. u-군수정보체계를 구축하기 위해서는 탄약뿐만 아니라 물자, 장비정비 RFID 시스템이 국방차원의 ONS(Object Naming Service) 및 DS(Discovery Service)와 연계되어야 비로소 군수물자 전체에 대하여 실시간으로 흐름을 파악할 수 있게 된다. 그러나 시범사업을 통하여 구축된 탄약 RFID 시스템이나 신무기체계 자산관리 시스템은 기관간 정보를 공유할 수 있도록 하는 국방차원의 ONS가 구비되어 있지 않고, 향후 구축할 계획을 가지고 있다. 따라서 본 논문에서는 EPCglobal 네트워크의 시사점 및 향후 추진 방향을 정리해 보고, 국방분야에서 RFID 시스템 도입사례와 향후 국방 RFID 추진방향, 국방 군수지원 개념을 고찰하였다. 그리고 군에 적합하고 인트라넷 환경에서 운영이 가능한 MND-ONS(Military and Defense) 시스템 구축방안을 제시하였다.

  • PDF

Damages of Chuteway Slabs of Spillway by Water Release (수문방류에 따른 여수로 바닥슬래브의 손상 발생)

  • Shin, Dong-Hoon;Jung, Woo-Sung;Yoo, Hyung Ju;Lee, Seung Oh
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.64-64
    • /
    • 2021
  • 댐의 중요 구성요소 중 하나인 여수로 구조물은 관행적으로 단위길이당 100m3/s 정도의 유량이 흐를 수 있도록 설계를 하고, 이를 초과할 때는 여수로 구조물에 피해가 가지 않도록 공기혼입 장치를 설치하거나 콘크리트의 설계강도를 증가시키는 대책을 사용하는 것이 일반적이다(댐설계 기준·해설, 2011) 그러나 건설된 지 오래된 댐의 경우 여수로 콘크리트 구조물의 설계강도가 낮고(최저 16.7MPa) 수문방류 횟수가 많아 최근에 건설된 댐 여수로 보다 상대적으로 많은 손상이 발생되어 있어 잦은 보수보강이 요구되고, 점차 유지관리 비용이 증대되고 있어 노후된 여수로 구조물일수록 기능을 유지하면서도 유지관리 비용을 절감할 수 있는 방안의 수립이 요구되고 있다. 이에 본 연구에서는 𐩒𐩒𐩒댐 여수로를 대상으로 2020년 홍수기 전·후의 여수로 바닥슬래브의 손상상태를 3D드론 매핑, 육안조사 및 내구성 조사결과 등을 이용한 정밀분석을 통해 수문방류시 여수로 바닥슬래브에 가장 큰 손상을 일으키는 손상메커니즘으로 유수에 의한 부상(uplift)에 의한 파손 메커니즘(Flow-driven uplift failure mechanism)을 제시하였으며, 여수로 바닥슬래브의 가장 일반적 손상원인으로 간주되고 있는 공동현상(cavitation)이 공동지수(cavitation index)가 0.3이상인 경우에도 발생할 수 있음을 확인하였다. 이와 같은 관찰 및 분석결과는 보다 많은 사례를 통하여 보완될 경우 향후 여수로 구조물의 설계 뿐만 아니라 보수보강 방법이나 유지관리, 더나아가서는 종합적 댐시설물 자산관리 계획을 수립하는데 매우 유용한 자산이 될 수 있다.

  • PDF

A Study on Establishing Facility and Asset Information from Construction Phase (유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.529-532
    • /
    • 2003
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility. Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from all asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

  • PDF